Recently I traveled lpool - m/c via chat moss/barton moss route, concrete supports for overhead wires are well in progress over barton moss section,steel tubes approx 30' in length and 3'width were lying along lineside and also upended and piledriven into lineside ready to support overhead equipment, some had already been driven into ground and had another 30'section bolted on and appeared to be waiting to be piledriven,so potentially they will go down approx 60', I've never seen this setup before but the question is weather the floating membrane beneath the track of the Stephenson era is going to be damaged? I seem to recall years ago when CWR was first laid across chat moss there was trouble because of excavation of the track was to deep and damaged membrane.
perhap's an engineer has an explanation.