Evvy73
Member
The London SE1 website has a bit more info about the London Bridge redevelopment, including a couple of 'artists impression' pictures. Link: http://www.london-se1.co.uk/news/view/6392
It also has some more details of the proposed changes to services:-
December 2012: Withdrawal of Southerns South London Line services between Victoria and London Bridge via Denmark Hill. The timing of many of Southerns services to and from London Bridge will be changing as a result of the station works.
May 2013: Platforms 14-16 are taken out of use to enable redevelopment work. Some services will be retimed and platform changes required.
December 2014 to 2018 (TBC): Thameslink route services to and from central London diverted away from London Bridge.
2015 to 2016 (TBC): Services to Charing Cross unable to call at London Bridge.
2016 to late 2017 (TBC): Services to Cannon Street unable to call at London Bridge.
I guess this means that the Thameslink Services will all run from Blackfriars through to East Croydon on the Elephant and Castle route, which will add a bit of time on to the journey.
It also has some more details of the proposed changes to services:-
December 2012: Withdrawal of Southerns South London Line services between Victoria and London Bridge via Denmark Hill. The timing of many of Southerns services to and from London Bridge will be changing as a result of the station works.
May 2013: Platforms 14-16 are taken out of use to enable redevelopment work. Some services will be retimed and platform changes required.
December 2014 to 2018 (TBC): Thameslink route services to and from central London diverted away from London Bridge.
2015 to 2016 (TBC): Services to Charing Cross unable to call at London Bridge.
2016 to late 2017 (TBC): Services to Cannon Street unable to call at London Bridge.
I guess this means that the Thameslink Services will all run from Blackfriars through to East Croydon on the Elephant and Castle route, which will add a bit of time on to the journey.