edwin_m
Veteran Member
What I find interesting is that this did not apply (ever) to the Yorkshire expresses to/from Kings Cross. Holbeck and Kings Cross shed A1 and A4 locos would work right through between Leeds Central and Kings Cross without a change at Grantham, even though some trains stopped there. Even the carriage workings were completely separate from the Anglo/Scottish trains. A very reliable book on this subject states that the crack turn on Holbeck shed was the crew that worked the White Rose express throughout in both directions with approximately 2 hours turnaround in London. This was such a prestigious (and killer) turn that the top link Holbeck crew were the only set of men who did not have to prepare their loco on shed before departure, and would even book on at Leeds Central station to join their loco just before departure. Not many tougher turns can have existed in the 1950s / early 60s.
That would have been around 3hr each way and with the 2hr turnaround a return journey comes to about a typical shift length. So by stretching things a little a single crew could work a return Leeds-London journey. The same isn't true for any other ECML long distance working.
