PHILIPE
Veteran Member
These were South Coast trains that had come from Derby direction and vice versa where the locos ran round. Voyagers were introduced in early 2002.
Loco changes on the ECML continued into the diesel era due to the relatively low fuel range of the Deltics. Kings Cross to Aberdeen services normally changed engines at Edinburgh, as Aberdeen was slightly over the planned maximum, though they did work through if there were loco shortages. On Saturday nights if diversions via Carlisle were on, locos were normally changed at Newcastle for the same reason.In the steam era, loco change locations were also related to fuel / water capacity, even if no reversal was involved.
ECML used Peterborough, Grantham, Doncaster, York & Newcastle for some locos changes (no more than one or two changes on any service.
These were South Coast trains that had come from Derby direction and vice versa where the locos ran round. Voyagers were introduced in early 2002.
But those services were almost all HSTs rather than hauled. They certainly didn't fall into the regular workings year in, year out pre-Voyagers.
The excellent "Sulzerpower" website contains 1999 VTXC/WC 47/8 diagrams here which give a good picture of what was planned to happen
http://sulzerpower.com/diagramSummer99.html
And there were steam to electric changes at Sheffield Victoria after Woodhead was electrified.
.....
In the steam era, loco change locations were also related to fuel / water capacity, even if no reversal was involved.
ECML used Peterborough, Grantham, Doncaster, York & Newcastle for some locos changes (no more than one or two changes on any service.
.......
It might be argued that the Atlantic Coast Express divided, but the MN bringing the train from London only worked as far as Exeter. The portions would then be hauled by unmodified WC/BB's.
Through engine working at Exeter C was unusual but not unknown - with all the remarshalling there, re-engining trains fitted well. Through engine working London-Exeter was reintroduced aound 1950 (with exceptions, most famously the Devon Belle). In any case, nothing larger than an N or unrebuilt light Pacific could work West of Exeter.
Bournemouth also saw a fair few engine changes, but there was no consistent pattern AFAIK.
Regarding the Woodhead electrics, the administrator of the British Railways Foundation website (who worked as Controller on many routes between the '40s & '70s) has remarked several times about the operational inefficiency of trains between east / south of the Sheffield area and north / west of the Manchester area, following the introduction of electrification. After electrification, summer SOs, excursions and freight would arrive at Sheffield Victoria or Rotherwood Sidings where the steam loco would come off and be replaced with an electric to go over the Pennines to Midland Jn (just north of Ashburys) where another steam loco would replace the electric. Thus 3 locos and sets of crew were required whereas before only one loco and one crew would work most such workings throughout.
I wonder whether this was an aversion to 'steam under the wires', or whether steam drivers no longer signed the Woodhead route? Did any drivers sign both steam and electric traction?
I wonder whether this was an aversion to 'steam under the wires', or whether steam drivers no longer signed the Woodhead route? Did any drivers sign both steam and electric traction?
I wonder whether this was an aversion to 'steam under the wires', or whether steam drivers no longer signed the Woodhead route? Did any drivers sign both steam and electric traction?
The loco changes at Bristol until the 1970s were, among other things, because crews west of there had not been trained on diesel-electrics, only diesel-hydraulics (quite different controls). Not only did everything off the Birmingham line change from Peaks to Warships/Westerns, but also services like the "North and West" via Hereford would use WR Brush 4s from Crewe down to Bristol, then change there to a Western. When originally dieselised in 1962 these had run with a Warship from Plymouth right through to Crewe, but ran out of fuel more than once on the last lap *
.
For a while, some loco changes occurred at Shrewsbury, presumably just a continuation of steam practice. On one journey, I was on a train that changed here from a Class 47 to a Class 40. In steam days, any GW Castle or Hall would be removed at Shrewsbury and replaced by a LM 4-6-0 (typically a Jubilee or Black 5.)
When BR introduced services from Manchester/Liverpool to Brighton/Dover via Kensington Olympia in the mid-1980s, weren't they electric hauled to Wembley Yard and then a 47 took over?
I recall being on a Mystery Tour that did this too, although we swapped a Class 85 for a Class 33 to take us on to Portsmouth.
In pre-BR days the normal loco changing progression for an ECML train from Kings Cross to Edinburgh was :
Kings Cross to Grantham
Grantham to York
York to Newcastle
Newcastle to Edinburgh
Each sector was, very roughly, 100 miles. At an average of 50mph it would be around 2 hours running for each sector, which with standing time and fitting into the schedule fits nicely into an 8 hour workday, without needing lodging turns, and the crew would retain the same loco all day. A 200 mile round trip for a steam loco crew was a good but very hard day's work, and if I recall correctly the old union agreement was an extra hour's pay for each 20 miles over 100 miles in a day, so the crew could end up with almost a double day's pay - but on a steam loco they had certainly earned it.