Chris125
Established Member
A comment on another forum suggest they're being moved elsewhere to free up space at Northampton for further units to be commissioned.
Chris
Chris
Might be able to use some space at Soho, particularly if some are used on CrossCity/local Birmingham services.
I've heard some 350/3s may come out to play during the summer, but I guess that depends on what they do with the 350/1s first.
And Kings Heath is full, only space for 30 there. Hence having to stable at Coventry Yard and in the platforms at Birmingham International overnight!!
Network Rail had indicated in previous infrastructure plans that they were looking at an additional servicing/stabling facility in the West Midlands with Duddeston the likely site. I do hope that is still on their agenda.
The most recent Route Plan makes brief reference to the issue on page 40, document link below:
http://www.networkrail.co.uk/browse...ute plans/london north western route plan.pdf
Would this be where the old rail works used to be, if it is setup at Duddeston?
If only there were facilities elsewhere on the network near Northhampton, around Bletchley, say...
No real timetable changes in May so no need yet for extra capacity. December timetable change is when they'll be pressed into full service. They may fill in before then if the 350/1 overhaul/major exam program gets under way.
I know what you mean but that is no help to the West Midlands issue. Soho is stuffed and there is nowhere else locally.
What I was going for is that if you moved units from Northampton to Bletchley to make room for the aforementioned commissioning, then you don't have to move the units to the west midlands, leaving capacity up there available.
plenty of dead and secure siding space in wolverton works, and surely there is space in bletchley tmd sidings....
Fair enough on Soho being full, didn't realise there was already a need to stable stuff at BHM overnight.
Hopefully a new base both for 350s and 323s will arrive before too long and it'll be sorted. Well, so long as the place is future proofed as much as possible, ie allowing more sidings to be provided if necessary etc. Wouldn't surprise me if one was to open at Bromsgrove to go with the new station and (eventually) the newly electrified route. Even if it's only enough for no more than 6 EMUs it all helps!
No space at Bromsgrove for a depot, the land will all be taken by the new arrangements, Duddeston is the prime location with the current Plant depot at Kings Norton another option.
http://www.worcestershire.gov.uk/cm...ransport-schemes/bromsgrove-rail-station.aspx
plenty of dead and secure siding space in wolverton works, and surely there is space in bletchley tmd sidings....
Fair play, cheers for the gen. Duddeston makes perfect sense with its rather central location, much more convenient than Bromsgrove at least.
Kings Norton would be handy but I just don't see it happening somehow. Call it a hunch that it definitely won't happen.
Not necessarily each day: I don't remember clearly but when I was doing some work for c2c I think that the 357s might have been on a three day cycle for CET emptying (as well as making sure that all the units are tanked before a weekend where possible). There will probably be a similar cycle for the handful of 323s that stable at New Street overnight.lots of talk on this thread about stabling units in stations but remember as some others have said you need to pump out the CET each day.
Not necessarily each day: I don't remember clearly but when I was doing some work for c2c I think that the 357s might have been on a three day cycle for CET emptying (as well as making sure that all the units are tanked before a weekend where possible). There will probably be a similar cycle for the handful of 323s that stable at New Street overnight.
Yep, we have endless problems with the toilets on the 350s being locked out of use due to out-stabling - Train crew aren't best pleased with the situation.OK not sure of the required frequency but I do know that LM have a lot of problems with 350s having loos locked out of use due to full tanks as a direct result of out-stabling. As for the 323s do they not dump onto the track?
As far as I am aware, the only units that get sent into LNWR at Crewe are those that need tanking and those that are due exams or running repairs - but sd0733 will have more of an idea. .