tbtc
Veteran Member
Following a discussion with Nym about the effects of the "Lancashire Triangle" electrification I was wondering what through services were lost when lines were electrified?
Did the Sunderland/ Middlesbrough - London services end when the ECML was electrified, or did these continue for a bit afterwards (or get withdrawn before the wires)?
As far as I remember, the Glasgow Queen Street - Falkirk - London service was withdrawn when the ECML wires were completed (replaced by a service to Glasgow Central via the curve at Carstairs)
On a similar note, once the GWML is wired up, will we see the end of direct London services for Henley/ Pembroke/ Weston? Or Manchester - Scarborough trains if/when the TPE core is electrified?
Did the Sunderland/ Middlesbrough - London services end when the ECML was electrified, or did these continue for a bit afterwards (or get withdrawn before the wires)?
As far as I remember, the Glasgow Queen Street - Falkirk - London service was withdrawn when the ECML wires were completed (replaced by a service to Glasgow Central via the curve at Carstairs)
On a similar note, once the GWML is wired up, will we see the end of direct London services for Henley/ Pembroke/ Weston? Or Manchester - Scarborough trains if/when the TPE core is electrified?