HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,269
If the line is scheduled for closure then the value of the capital equipment on the line (ETCS etc) would be a dead loss.I'd propose the Barton on Humber branch. Grimsby to Barton trains connect with the bus service over Humber Bridge to Hull. As soon as that bus service can be run with autonomous busses, like the CAV Forth trials in Edinburgh, then extend the bus route into Grimsby and close the railway, which would no longer serve any useful purpose.
That might not help the economics for getting the trial funded.
My personal suggestion would be the St Ives Branch, it would provide opportunities to experiment with unmanned units in multiple with conventional units (to reinforce trains in summer), and the ATO train's ability to simply go without a driver changing ends would be very helpful on the tight turnarounds. Plus the traffic on the line is so heavily seasonal that the winter months would permit a lengthy closure for the installation of trial equipment.
