Hi,
Does anyone know how Network Rail deal with delays and detecting what other trains will be impacted by an initial delay?
What options do they have? I.e. cancel trains.
What power and tools do they have to resolve them? I.e. tell an freight operator not to run a train.
Thanks
You may need to be a little more specific with the question, however most things will be dealt with by the TOC controllers.
That job is very much a black art, there’s loads of factors to be considered which will inform what choices are made.
Generally I suspect those in the field will agree that crewing is probably the most significant factor in determining what happens. Essentially you have to get crews to their relief point at the booked time if at all possible, especially if their duty involved them then going on to pick up another train (to avoid a consequential delay or cancellation). There are also factors to consider like depot requirements (if a particular train needs to finish at a particular location) or stock balance (ensuring each stabling point finishes up with the right number of each type of train at the end of the day) - these factors increase in importance as the day progresses.
Those are the biggest factors which will shape decisions, obviously balanced with trying to ensure the best service in the meantime.
Taking into consideration all the above, options might include
* Terminating a train short so it can commence its next journey on time or to help get the driver to relief point on time (but cannot readily be done if the driver is due to be relieved at the originally booked destination)
* Omit stops to save time
* Miss a round trip altogether
* Reform the train into something else, normally at a relief point when a fresh crew is involved. Especially on suburban or metro routes it might be possible to do a complex set of make-ups, perhaps with a termination thrown in. You might choose to make one train very late and turn it short or miss a round trip if it allows several others to be made right time or near enough that the lateness will recover naturally.
As an example, if you have four trains all running 15 minutes late a few minutes apart and your crew relief point is 15 minutes from the terminus. You can’t turn round all four trains as there isn’t the track capacity to do it. So make the first train of the four into the second, make the second into the third, make the third into the fourth, and make the fourth train into the first and turn it short, you’ve now got four trains on time at the cost of just one inconvenience. The snag is you can only do it if you have a fresh crew for the first of the line.
That’s it really. It’s a black art, and balancing all the many factors together certainly makes it a job not for the faint hearted!