The following updates have been published online as part of the Information Reports for the October Meetings of the Leeds and Bradford Districts Consultative Committees.
Leeds Rail Growth Package (Kirkstall Forge and Apperley Bridge)
2.68. Detailed designs for both Apperley Bridge and Kirkstall Forge are now approaching
completion, and Network Rail’s contractor is making preparations to start on
site. Work will start on site at Apperley Bridge in October 2014 and at Kirkstall Forge
in January 2015. These works will be preceded by CEG (the developer of the Kirkstall
Forge site) and Leeds City Council’s contractor starting on site in October for the
construction of the access road. Station opening is still planned for August
2015. Northern Rail has now commenced staff recruitment to operate the train
service and stations from this date.
Great stuff. This is what PTE's are for.
Great news - just hoping it comes with a decent timetable into the evenings and on Sundays when I'll be able to use it.
Well, last I heard was 1tph daytime to/from Leeds with the service coming from/going to different places in each direction so I wouldn't hope for anything better than that.![]()
Really? That sounds like a downgrade from what was publicised by Metro previously (and which was presumably considered as part of the CBA process) of daytime services being calls added to the LDS-BDQ services. :roll:
It will quickly fall apart if they run it for long with that timetable. The Bradford trains will have to stop, sending people to Guiseley for Bradford is insane (more to the point people won't do it)
It would seem bizarre not to stop the Bradford trains. These have always been the least busy of the lot.
I understood that to be the original plan. Presumably the change in plan and halving of the level of service comes down to pathing issues?
I think we will have to wait and see...
Another planners cock-up. Organising parties in breweries again. This is what happens opening two stations on a route where there isn't the capacity for even one. The only way this can be successful is to requadrify between Shipley and Leeds as it used to be but this would have wrecked the cost/benefit analysis.
As I say I'm not sure the service pattern is totally 100% signed off yet is it? We will just have to wait and see!
I took a return trip Leeds to Shipley this morning / afternoon. Could see some extensive work on a bridge, and a huge building site for Redrow - Horsforth Vale, apparently. Lots and lots of vegetation clearance happening too all the way from Armley Jn through to Thackley Tunnel. Sadly I could not see the sites of the stations, and at mostly 90mph I can't seem to pin down where the two stations will even be from aboard the train.
I noticed all of the following landmarks though, can someone tell me between which the stations will go? Many thanks.
-Armley Jn
-Kirkstall Looops
-Kirkstall Abbey
-Aforementioned wasteland that is a building site
-Apperley Jn
-Thackley Tn
-Dockfield Jn
I took a return trip Leeds to Shipley this morning / afternoon. Could see some extensive work on a bridge, and a huge building site for Redrow - Horsforth Vale, apparently. Lots and lots of vegetation clearance happening too all the way from Armley Jn through to Thackley Tunnel. Sadly I could not see the sites of the stations, and at mostly 90mph I can't seem to pin down where the two stations will even be from aboard the train.
I noticed all of the following landmarks though, can someone tell me between which the stations will go? Many thanks.
-Armley Jn
-Kirkstall Looops
-Kirkstall Abbey
-Aforementioned wasteland that is a building site
-Apperley Jn
-Thackley Tn
-Dockfield Jn
The Bradford Telegraph & Argus is reporting a visit by Transport Secretary Patrick McLoughlin to the "building site" of the future Apperley Bridge station.
I have been wondering this for a while will Kirkstall Forge station be called Kirkstall Forge or just Kirkstall as when there were 2 stations in Kirkstall it made sense to use that name but now of course there isn't so the Forge suffix seems redundant.
The Bradford Telegraph & Argus is reporting a visit by Transport Secretary Patrick McLoughlin to the "building site" of the future Apperley Bridge station.
After 15+ years of planning, it's actually happening. Rejoice!
Link to this , including reference to additional rolling stock) here-
http://www.wharfedaleobserver.co.uk...ary_sees_Apperley_Bridge_station_work/?ref=mr