I was watching a video on trains at King's Cross. I noticed the signal number boards had a YA code. What signalling centre is that?

Thanks.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
I didn't know York ROC covered that distance! Just out of curiosity, I assume there was Signal Box or boxes covering King's Cross at one point?
Coverage isn’t continuous, there are still other conventional signal centres in between, Peterborough and Doncaster at least?

I‘m not that familiar with the exact route signalling history, but the immediate Kings Cross area was previously operated from a 1970s “box” which is still standing beside the entrance to the newly reopened tunnel.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
York ROC will eventually control much of the ECML from King's Cross northwards.
The remodelling of King's Cross last year was the start of the transfer of control.
YA is the reference for the first panel in York ROC; we might expect YB, YC etc further north as the resignalling (in readiness for ETCS) progresses northwards.
The old King's Cross panel controls as far as Biggleswade, and I believe it still does so beyond the immediate King's Cross environs.
The transfer process is likely to take a decade to complete.
 

Bertone

Member
Joined
5 Nov 2021
Messages
205
Location
Hertfordshire
The Kings Cross track layout was extensively remodelled in the 1970’s and a new Power Signal Box was opened in 1977.
This box controlled the main line to Sandy, the Cambridge branch to Royston and the Moorgate branch from Finsbury Park to Moorgate.
Interestingly, this 1970’s remodelling “closed” one of the three bores of Gas Works tunnel, which has now been reinstated in the most recent track and signalling arrangements.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
York ROC will eventually control much of the ECML from King's Cross northwards.
The remodelling of King's Cross last year was the start of the transfer of control.
YA is the reference for the first panel in York ROC; we might expect YB, YC etc further north as the resignalling (in readiness for ETCS) progresses northwards.
The old King's Cross panel controls as far as Biggleswade, and I believe it still does so beyond the immediate King's Cross environs.
The transfer process is likely to take a decade to complete.
The current sectional appendix however shows everything between Kings Cross and Biggleswade including Moorgate and the Hertford loop is already controlled by York ROC. Kings Cross PSB closed fully during last years remodelling.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,616
Location
Nottingham
The current sectional appendix however shows everything between Kings Cross and Biggleswade including Moorgate and the Hertford loop is already controlled by York ROC. Kings Cross PSB closed fully during last years remodelling.
Beyond the immediate Kings Cross area, has it just been re-controlled from York with no changes at the trackside? It would make sense to leave it alone until the ETCS scheme replaces it.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
Beyond the immediate Kings Cross area, has it just been re-controlled from York with no changes at the trackside? It would make sense to leave it alone until the ETCS scheme replaces it.
Yes that’s what I’ve just gleaned from a couple of earlier threads. It’s apparently only in the area of last years project where all the new signals are now plated YA.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,961
Location
Up the creek
A quick check of recent copies of the Signalling Record Society’s Signalling Record says that most of the area (Kings Cross, Finsbury Park and Wood Green work stations) was taken over by York on 26 April 2021. Platforms 7 to 10 out to Belle Isle Junction on E & F lines followed on 7 June.

EDIT: I think this saw the closure of Kings Cross Panel.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
A quick check of recent copies of the Signalling Record Society’s Signalling Record says that most of the area (Kings Cross, Finsbury Park and Wood Green work stations) was taken over by York on 26 April 2021. Platforms 7 to 10 out to Belle Isle Junction on E & F lines followed on 7 June.

EDIT: I think this saw the closure of Kings Cross Panel.
It did, hence my first reply, which was based on the discussions we had in the remodelling thread at that time.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,005
Location
Surrey
Not sure that ARS has been provided though given some of the poor regulating decisions that are made over Welywn viaduct section suggesting that the signallers from KX didn't want to relocate to York.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,428
Yes that’s what I’ve just gleaned from a couple of earlier threads. It’s apparently only in the area of last years project where all the new signals are now plated YA.
The Moorgate branch is being resignalled over the May Day weekend - the signals will all be renumbered
and replated 'YA' signals when it reopens next Tuesday!




MARK
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,682
Beyond the immediate Kings Cross area, has it just been re-controlled from York with no changes at the trackside? It would make sense to leave it alone until the ETCS scheme replaces it.

much of the old KX PSB area had already been relocked
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,865
Location
UK
Not sure that ARS has been provided though given some of the poor regulating decisions that are made over Welywn viaduct section suggesting that the signallers from KX didn't want to relocate to York.

York signallers will be working out everything from King's Cross up to the viaduct and beyond, and decisions during disruption on what needs to go where, (not to/)stop orders etc, will be made by someone based at York who will liaise with the ROC at Three Bridges.

The next signalling move will be on the Peterborough line and ever closer to York, which I believe takes place before the switchover to ETCS on the mainline.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,428
The next signalling move will be on the Peterborough line and ever closer to York, which I believe takes place before the switchover to ETCS on the mainline.
Closure of Peterborough PSB is planned for next Summer.




MARK
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,349
Location
Hertfordshire / Teesdale
York signallers will be working out everything from King's Cross up to the viaduct and beyond, and decisions during disruption on what needs to go where, (not to/)stop orders etc, will be made by someone based at York who will liaise with the ROC at Three Bridges.

The next signalling move will be on the Peterborough line and ever closer to York, which I believe takes place before the switchover to ETCS on the mainline.

There was definitely a noticeable change when control passed over. Didn’t take long to get back to normality as far as I could tell.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,865
Location
UK
There was definitely a noticeable change when control passed over. Didn’t take long to get back to normality as far as I could tell.

The timings on the current Saturday+ timetable doesn't allow for much disruption before everything falls apart, so I hope they can fix it all by mid-May. The new 9Yxx services stand to cause much fun and games!
 

Mcq

Member
Joined
24 May 2019
Messages
410
The Moorgate branch is being resignalled over the May Day weekend - the signals will all be renumbered
and replated 'YA' signals when it reopens next Tuesday!




MARK
Noticed Moorgate branch closed again this weekend - does this complete the conversion to ECTS to Finsbury Park as well?
If not does anyone know when that will happen?
 

buz33

Member
Joined
21 Nov 2009
Messages
35
The quote from Toufic Machnouk in this Network Rail press release suggests that ETCS will be happening at a later stage.

I notice that signal maps has been updated with YA signals on the Northern City line which would also suggest that colour light signals will still be around.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,680
Location
SW London
The Kings Cross track layout was extensively remodelled in the 1970’s and a new Power Signal Box was opened in 1977.
This box controlled the main line to Sandy, the Cambridge branch to Royston and the Moorgate branch from Finsbury Park to Moorgate.
Interestingly, this 1970’s remodelling “closed” one of the three bores of Gas Works tunnel, which has now been reinstated in the most recent track and signalling arrangements.
The closure of the easternmost bore of Gasworks Tunnel was to make way for the dedicated high speed rail link to Maplin Airport. Neither the railway nor the airport were ever built.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The eastern bore of Copenhagen tunnel was closed at much the same time. Google satellite view appears to show a contractor's access road or haul road going through it. Was this for last year's works?

 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
The eastern bore of Copenhagen tunnel was closed at much the same time. Google satellite view appears to show a contractor's access road or haul road going through it. Was this for last year's works?

The access road was already there, NR previously used it for access it all the way down to Kings Cross.



== Doublepost prevention - post automatically merged: ==



The closure of the easternmost bore of Gasworks Tunnel was to make way for the dedicated high speed rail link to Maplin Airport. Neither the railway nor the airport were ever built.
The proposed airport link didn’t use the eastern Gasworks tunnel bore, it would have been north of the canal on the goods yard site. There’s a short thread about it here, it includes part of a 1977 Modern Railways article:
 
Status
Not open for further replies.

Top