The BBC carries a story about the health risks to track side workers from the spray and detritus spread from non retention toilets.
http://www.bbc.co.uk/news/uk-england-cambridgeshire-25430657
This is a long recognised problem - although the introduction of powered doors and the removal of external door handles means that it might be less obvious to passengers, apart from the faeces and toilet paper seen in the track bed at stations.
Just how much of this stock remains in service? When is it scheduled for replacement? Is a retention toilet system something that can be fitted during the life of a carriage or is this a new build only issue? Are toilet conversions to allow for disabled passengers always linked to the installation of a retention system?
http://www.bbc.co.uk/news/uk-england-cambridgeshire-25430657
Cambridge rail worker's health fears over excrement spray
Rail workers are being sprayed by human urine and faeces from passing trains, putting their health at risk.
A Network Rail worker said staff were "genuinely concerned" about excrement, urine and sanitary towels on the tracks.
Network Rail accepted that train toilets which emptied on the track were "outdated and unpleasant" for track workers.
Greater Anglia said it was hoping to phase out toilets which dump waste.
The man who works across the East Anglia region said: "A train would be coming and we'd stand back the recommended distance.
"It's not unusual to feel a spray, a kind of mist in the air. That's bad enough, but then you walk back to where you've been working on the tracks there's [faeces] everywhere."
This is a long recognised problem - although the introduction of powered doors and the removal of external door handles means that it might be less obvious to passengers, apart from the faeces and toilet paper seen in the track bed at stations.
Just how much of this stock remains in service? When is it scheduled for replacement? Is a retention toilet system something that can be fitted during the life of a carriage or is this a new build only issue? Are toilet conversions to allow for disabled passengers always linked to the installation of a retention system?
