• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Is the railway about to embark on a massive cost cutting exercise?

Status
Not open for further replies.

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,882
Location
West of Andover
A good example in my eyes of a Basket Case line must be the Barton-on-Humber branch, solely for the staffing costs.

IIRC there is a staffed crossing at New Holland Station, Goxhill station & at the signal box/crossing at Oxmarsh

Maybe even a staffed crossing between Thornton Abbey & Ulceby.

All for a 2 hourly (in pre Covid times) a single 153, which must not pay it's way (considering there is a more frequent bus service to Grimsby from Barton on Humber)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
Part of the problem goes back to the Victorian era when they were being built. Why was so much spent on grandeur such as huge tunnel portals and viaducts when much smaller structures would have sufficed? The result is that these overly large and grand structures need more maintenance now.

Couple of examples - Souldern Viaduct goes over a stream but has around 10-15 arches. Kilsby and Box Tunnels have massively oversized portals and shafts.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Part of the problem goes back to the Victorian era when they were being built. Why was so much spent on grandeur such as huge tunnel portals and viaducts when much smaller structures would have sufficed? The result is that these overly large and grand structures need more maintenance now.

Couple of examples - Souldern Viaduct goes over a stream but has around 10-15 arches. Kilsby and Box Tunnels have massively oversized portals and shafts.
Not sure you can consider the decisions made 150 years ago or more as part of the predicament the industry is in now.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
The decisions have led to regular costly maintenance in the present day.
Really? How much work do these structures need over and above any other bridge and tunnel? There are other assets that will cost more to maintain over time than these such as signalling and track.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
The decisions have led to regular costly maintenance in the present day.

I suspect that whilst a fancy portal or attractive victorian building do add some costs, these are probably a drop in the ocean in comparison to the cost of the working part of the asset.

Victorian railway engineers generally far preferred embankments and cuttings as they were cheaper to build, and tended only towards viaducts and tunnels where unavoidable for the technology of the time (or where a recalcitrant landowner wanted to hide the railway from his country pile window).
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,722
Sitting in an office over looking London Bridge station watching empty train after empty train is quite depressing. Time to move to a 6 day timetable with no extra peak services on the basis of what I'm seeing
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Most unions are for Sundays inside of the week , TOC’s were not.
No thanks, Sundays to me should stay outside the working week.

If it came to a vote, no matter how much extra money was put my way to give up the Sundays and have them as part of the working week would get a firm hell no from me.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,409
Sitting in an office over looking London Bridge station watching empty train after empty train is quite depressing. Time to move to a 6 day timetable with no extra peak services on the basis of what I'm seeing
Don't forget that many offices of major employers are still at no more than 10% capacity, for at least the next five weeks. That may well not be the long-term position.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,935
Location
"Marston Vale mafia"
Sitting in an office over looking London Bridge station watching empty train after empty train is quite depressing. Time to move to a 6 day timetable with no extra peak services on the basis of what I'm seeing

People are still being told to work from home. Unless that will be permanent, we can't judge the long term situation until that has changed. We might want to cut short term to save a little on electricity/diesel and overtime, but we can't be doing long term stuff (disposing of stock, making staff redundant) until that is certain.

I do suspect an all week Takt with longer trains in the peak (as is mostly the case away from London) may well work, though.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,450
Don't forget that many offices of major employers are still at no more than 10% capacity, for at least the next five weeks. That may well not be the long-term position.
Exactly so. My employer for example is looking to move to approx 50% of time in the office on average but that slipped to July after the latest announcement.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
Sitting in an office over looking London Bridge station watching empty train after empty train is quite depressing. Time to move to a 6 day timetable with no extra peak services on the basis of what I'm seeing

Come visit Leeds - no empty peak hour trains around here !
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Don't forget that many offices of major employers are still at no more than 10% capacity, for at least the next five weeks. That may well not be the long-term position.
Exactly so. My employer for example is looking to move to approx 50% of time in the office on average but that slipped to July after the latest announcement.
I am currently looking for work, and the majority of job adverts state, that while I maybe working from home Monday to Friday initially when things are enabled it would be a case long term that I would be working 3 days in the office and two days from home. Which to be honest suits me fine, as that is the type of percentage of office/wfh that I am looking for in any job role, especially if I have to commute a fair distance for the role.

People are still being told to work from home. Unless that will be permanent, we can't judge the long term situation until that has changed. We might want to cut short term to save a little on electricity/diesel and overtime, but we can't be doing long term stuff (disposing of stock, making staff redundant) until that is certain.

I do suspect an all week Takt with longer trains in the peak (as is mostly the case away from London) may well work, though.
I think the working from home even when we get to the date next month that we should be back to 'normal', I suspect that companies where possible will have their staff working from home two days a week and three days in the office or vice versa.

Sitting in an office over looking London Bridge station watching empty train after empty train is quite depressing. Time to move to a 6 day timetable with no extra peak services on the basis of what I'm seeing
I am sure that from next month, if it is the final date for change that the peak trains will fill up, but for a while there maybe a need to still be socially distant.

Come visit Leeds - no empty peak hour trains around here !
Are the trains in Leeds at peak times full up due to social distancing? If that is the case, then the trains are only a quarter to half full.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,442
Location
Yorks
Are the trains in Leeds at peak times full up due to social distancing? If that is the case, then the trains are only a quarter to half full.

They're not rammed like they used to be. Most people can still get a double seat, but the point I'm making is they're not empty.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,935
Location
"Marston Vale mafia"
I think the working from home even when we get to the date next month that we should be back to 'normal', I suspect that companies where possible will have their staff working from home two days a week and three days in the office or vice versa.

I would agree there will be a change, my point was just that making choices about long term capacity isn't really feasible until we have seen the magnitude of that change (as what people say isn't necessarily what they do), so "permanent" cuts (i.e. scrapping of stock and laying off of staff) aren't really sensible for at least 6 months, probably a year. Though you could save a few quid by dropping frequencies temporarily.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,409
I think the working from home even when we get to the date next month that we should be back to 'normal', I suspect that companies where possible will have their staff working from home two days a week and three days in the office or vice versa.
The Government’s review of social distancing has not been published yet, as its publication date is linked to the date of Step 4. There may continue to be a reduction in capacity in offices and other work settings depending on the outcome of that review.
 

Grumpy Git

On Moderation
Joined
13 Oct 2019
Messages
2,256
Location
Liverpool
The Government’s review of social distancing has not been published yet, as its publication date is linked to the date of Step 4. There may continue to be a reduction in capacity in offices and other work settings depending on the outcome of that review.

They'll wait to see what DM readers thoughts are first, then go with those.
 
Status
Not open for further replies.

Top