How many of them are Intercity, or are you only counting Intercity trains? In my opinion 1tph is enough if the trains are long enough. If there's less than one Intercity train per hour, and the rest are DMUs just going to Plymouth, then just drag an electric train with a diesel loco (with the electric train being formed of conventialy-sized coaches, not 26m ones that won't fit).Where is the business case for electrifying west of Plymouth though? It's only one train per hour.
There are eight direct services from London to Penzance Mondays to Thursdays with an additional service on Fridays. There are also three Cross Country services per day to Penzance.How many of them are Intercity, or are you only counting Intercity trains?
That was enough justification to electrify the ECML between Newcastle and Edinburgh, and then Edinburgh - Carstairs. Actually, perhaps that is an argument against electrifying more "marginal" sections of route, given that with the withdrawal of mail trains (formerly powered by 86s and 90s down the ECML) and with no more class 86s and mark 2s working Crosscountry services down the West Coast from Edinburgh there's probably less trains making use of the wires on both of these sections now than there were when they were wired up!Where is the business case for electrifying west of Plymouth though? It's only one train per hour.
Bi-mode wasn't available back then though and not electrifying would have resulted in a time penalty due to a loco change at Newcastle or running HSTs under the wires from London to Newcastle.That was enough justification to electrify the ECML between Newcastle and Edinburgh, and then Edinburgh - Carstairs - Glasgow.
I don't think removing intercity services from Newton Abbot (with the exception of the Cornish Riviera) and forcing everyone onto a stopper to join intercity trains at Exeter is going to be very popular. It's not the largest of towns but the station is well used and covers a large area.I think you could run an Exeter - Penzance stopping train using an emu if the wires were errected to Penzance.
To make better use of paths perhaps the units could attach to units to/from Paignton at Newton Abbott.
An hourly stopping service would perhaps allow some intercity services to skip some stations perhaps saving a few minutes and if the crosscountry voyagers are equipped with a pantograph car they could also make use fo the wires
I don't think removing all intercity services from Newton Abbot and forcing everyone onto a stopper to join intercity trains at Exeter is going to be very popular. It's not the largest of towns but the station is well used and covers a large area.
Yes sorry and I note that you also didn't say "all" services so have edited my post to correct that. I thought the fact you were starting the service back at Exeter would result in trains not stopping at Newton Abbot so that journey times to Plymouth/Penzance would be quicker. If you just want to skip some of the smaller Cornish stations then you could start the service from Plymouth. I'm not sure if there would be demand for more than one service per hour between Plymouth and Penzance though. You could call intercity services only at Bodmin Parkway, St Austell, Truro, Redruth and Penzance but the question is if there would be sufficient demand from only calling at these stations. Liskeard, Par and St Erth also have connections to branch lines.I said nothing about running the intercity services through Newton Abbott they would continue to call its just some of the smaller stations it think they could skip
Yes sorry and I note that you also didn't say "all" services so have edited my post to correct that. I thought the fact you were starting the service back at Exeter would result in trains not stopping at Newton Abbot so that journey times to Plymouth/Penzance would be quicker. If you just want to skip some of the smaller Cornish stations then you could start the service from Plymouth. I'm not sure if there would be demand for more than one service per hour between Plymouth and Penzance though. You could call intercity services only at Bodmin Parkway, St Austell, Truro, Redruth and Penzance but the question is if there would be sufficient demand from only calling at these stations. Liskeard, Par and St Erth also have connections to branch lines.
So the bidders will not be allowed to choose the IEP for these services then?DfT have told the franchise bidders for Thameslink that the choice of roling stock for the Cambridge/Kings Lynn services will be their responsibility, so IEP will not now be used for these services.
An update is given in the May edition of Modern Railways which arrived in the post today.
DfT have told the franchise bidders for Thameslink that the choice of roling stock for the Cambridge/Kings Lynn services will be their responsibility, so IEP will not now be used for these services.
Roger Ford mentions that this means the class 365s are likely to be retained as the lowest cost option or alternatively a possible new build 110mph EMU order
Aye- if the slower GN outer suburban services are going to be "Thameslink" stock, then the present fleet of 365s is plenty big enough to run the "Express" services- and even lengthen even more, especially at the peaks.
Would the 365s be likely to receive any major overhaul, or just another refresh? Would that be up to the bidders?
I'd love to see them get aircon, and an updated CIS system and the addition of CCTV.
The point is that the choice will be the TOC's.
The IEP objective was to get 125mph for Express services south of Hitchin and particularly over Welwyn Viaduct.
Keeping Class 365s with their 100mph might not be sufficient.
But I'm sure the 365s could be upgraded to 110mph running?
In another thread it was suggested that Cambridge would have a commuter IEP and this would be different to the other IEP units. Would the doors still be at the end of the coaches?IEP stock also would have the doors at the end of the carriages so presumably station dwell times would be longer with those trains compared to the 365s (or other new EMUs inc the Thameslink stock) during peak hours.
Doesn't running faster than 100 mph require a crumple zone?