Paddington-Blackpool with 57`s and 37`s my lordz!, Mk2e`s and earlyer no-coffin Mk2`s for the 37 sets, it would run Non-stop paddington- Birmingham then calls at Crewe Preston and Blackpool, Would have a grid set too
Realistically, if you were planning to run express along any mainlines you'd need 125mph stock to be allowed access and with all the HSTs, 22xs and 180s spoken for, you'd need new build.
You'd certainly not get far in your application if you wanted to use 37s and non-aircon mrk2s!
Thought Hull getting the 180s was so EMT could have all the 222s in one place and to let them expand their fleet whilst letting Hull remain a single-class fleet? Both are 125mph classes.
It is, though, part of why Hull had to replace the 170s with the 222s.
sorry 5cars are minimum on east coast, that's what i was told by first hull trains staff.
What about all the 4 car units running on the ECML then :?
i think's it 5 car on express services, not first capital connect.
Thought Hull getting the 180s was so EMT could have all the 222s in one place and to let them expand their fleet whilst letting Hull remain a single-class fleet? Both are 125mph classes.
It is, though, part of why Hull had to replace the 170s with the 222s.
Oxford, Lakes & Highland Trains
Running a 3xdaily between Perth & Oxford. Services running southbound at 07:00, 12.00, 17:00 - a typical timetable would be as follows.
07:00 Perth
07:17 Gleneagles
07:29 Dunblane
07:35 Stirling
07:43 Larbert
07:58 Lenzie
08:11 Glasgow Queen Street (a)
08:20 Glasgow Queen Street (d)
08:50 Motherwell
09:44 Carlisle
10:20 Oxenholme Lake District
10:55 Lancaster
11:13 Preston
11:36 Warrington
12:24 Wolverhampton
12:40 Birmingham New Street
13:10 Leamington Spa
13:27 Banbury
13:47 Oxford
Service to be operated by new build 7 car class 223 tilting units with dual power to take advantage of the wires between Motherwell and Birmingham New Street. 140mph capable under wires, 100mph under Diesel power.
Timetable created by working in partnership with local incumbant service operators. Eg Sub-letting/revenue sharing early morning service from Perth to Glasgow Queen Street from First-Scotrail thus potentially releasing a 3 car set to strengthen other services.
17:00 Service from Perth would offer a new late evening service southbound from Birmingham to Oxford at 22:40.
Oxford, Lakes & Highland Trains
Running a 3xdaily between Perth & Oxford. Services running southbound at 07:00, 12.00, 17:00 - a typical timetable would be as follows.
07:00 Perth
07:17 Gleneagles
07:29 Dunblane
07:35 Stirling
07:43 Larbert
07:58 Lenzie
08:11 Glasgow Queen Street (a)
08:20 Glasgow Queen Street (d)
08:50 Motherwell
09:44 Carlisle
10:20 Oxenholme Lake District
10:55 Lancaster
11:13 Preston
11:36 Warrington
12:24 Wolverhampton
12:40 Birmingham New Street
13:10 Leamington Spa
13:27 Banbury
13:47 Oxford
Service to be operated by new build 7 car class 223 tilting units with dual power to take advantage of the wires between Motherwell and Birmingham New Street. 140mph capable under wires, 100mph under Diesel power.
Timetable created by working in partnership with local incumbant service operators. Eg Sub-letting/revenue sharing early morning service from Perth to Glasgow Queen Street from First-Scotrail thus potentially releasing a 3 car set to strengthen other services.
17:00 Service from Perth would offer a new late evening service southbound from Birmingham to Oxford at 22:40.
Would there be a profitable demand though, or are you just after the sort of thing that's beytter served by enthuiast "line basher" specials?
I don't think an OA company could survive doing just summer weekend afternoons. That's Charter territory.
paddington via greenford, high wycombe and banbury or
paddington via reading, oxford
I think what is meant though, is by going via springburn and stepps, gartcosh junction, gartsherrie south junction and straight to motherwell passing through coatbridge central, whifflet and mossend yard.