How much of the country could me migrated over to ERTMS with £50 billion?
I read this as you were migrating with the £50 billion?
How much of the country could me migrated over to ERTMS with £50 billion?
... but the whole point is to get rid of longer-distance express passenger trains so that the current infrastructure can be served with more stopping and semi-fast trains, so there can be better local and regional services. What would the point be in building a dedicated express route and not taking advantage of the freed-up capacity on the older one?
What will be the service pattern of fast trains to London from places like Stoke and Coventry post HS2? Can they still expect the same 3 trains per hour with current journey times maintained?
To a point I agree I would look at keeping HS2 as far as Crewe but I would still retain full spec HS2 trains for the Birmingham route, you would need to put reasonable amount of money in upgrading the ECML and dealing with such as Welwyn.
Also this might not be a popular choice for many but I think we do need to put more money into our roads and motorways, our motorways were built for the traffic of 40 years ago and the upgrades since then have been little more than tinkering around the edges, so that now some of motorways can barely cope with off peak traffic never mind peak traffic.
The big question we have to consider with transport as well is if we move to electric cars then that reduces some of the pollution impact of roads, and if driverless vehicles without a driver just in case become a viable reality in the next 5 to 10 years as many of those involved are claiming then the argument about the need for public transport for those that cannot drive goes out of the window of course that doesn't solve the congestion problem instead it makes it worse. But for those parts of the country where congestion isn't a big issue maybe the idea of trains and buses becomes a thing of the past and you just take a driverless taxi instead at a much cheaper rate than current taxis.
Just a thought, if HS2 was cancelled, what if all the money £50 billion had to be spent on rail projects, reopen the GC? rail tunnel to Ireland? Woodhead?
As for an Ireland-Britain link, Dublin to Holyhead would be the best in terms of cities served, as it could easily have links to Liverpool, Manchester, Birmingham and London, but it would be by far the longest undersea tunnel ever created or the 4th longest bridge, it'd be a difficult sell. A Belfast-Scotland link would be more sensible but it'd be difficult to have a Dublin-London service that could compete with flying.
It's possible Stoke, along with Stafford, Macclesfield and Stockport could get a classic compatible HS service, probably hourly, but perhaps half hourly if a half portion split could be arranged with another destination at Birmingham Interchange. Coventry could lose non-stop pendolinos but may gain a more frequent and evenly spaced limited stop service on the fast lines. using 110MPH stock.
It would take years to build.
At this point putting more money into GWML electrification would have little impact - the schedule isn't being driven by costs, but rather by the reality on the ground (or in the ground in many cases).Money existing or not aside... I think the current mainlines could be better invested within a better timeframe.
-Speed up the time-frame for the electrification on the GWML and MML. Bringing forward the current planned completion dates by a few months to a year would have huge benefits on costs and not to mention the future fleet (and speed plans) for the TOCs.
This is already happening. As per above the problem isn't the lack of budget. MML is delayed due to lack of budget so that would benefit.-Upgrading of the ECML overhead wires. The "lightweight" design of this infrastructure is really starting show its flaws on a seemingly much more frequent basis.
It's possible that throwing some more money at ERTMS might speed things up, but I'm not clear that budget is the limiting factor for that either.-Faster implementation of ERTMS thus to enable the rollout of 140mph line speeds in all possible areas.
This is potentially worth doing, but it's not clear that you'd get as good value for money out of putting plasters on the existing network as compared to building completely new lines. Getting rid of the worst bottlenecks will be very expensive and disruptive - this is something that you always need to consider: nobody ends up on a RRB when building new infrastructure.-Rid as many of the major known bottlenecks on the GWML MML WCML & ECML thus increasing overall line speed and smoothing out capacity.
There's definitely no budget for this at the moment, so that would be a definite possibility.-Class 801s or similar for the EMT intercity services on the MML to replace the HSTs and to operate on fully electrified fast services to Nottingham and Sheffield. The Class 222s for the alternate stopper services.
Why do you think it would be cancelled?
There's no hint of a change of policy.
The Northern Powerhouse does seem to be fading, however, so maybe HS3 (which has never been properly defined) is not going to happen now its main protagonist is out of office.
I read this as you were migrating with the £50 billion?
. . . anyone on benefits is a work-shy who has SKY TV
I didn't suggest don't build HS2 at all. I am suggesting that HS2 from London to Birmingham (New St not Curzon St) and Crewe, with links to the Midland line via Burton and the North Staffs line via Stoke, will suffice in addressing the capacity problems. This is essentially phase 1 of the project. More than that is not required in my opinion. For example, 2 tph London-Manchester doesn't justify the massive disruption and cost of building a semi-underground line though South Manchester.
According to the Financial Times the Eurostar has an 80% market share on London-Paris and London-Brussels lines. There have been teething issues with the Channel Tunnel but it's definitely come on to its own now.
As for an Ireland-Britain link, Dublin to Holyhead would be the best in terms of cities served, as it could easily have links to Liverpool, Manchester, Birmingham and London, but it would be by far the longest undersea tunnel ever created or the 4th longest bridge, it'd be a difficult sell. A Belfast-Scotland link would be more sensible but it'd be difficult to have a Dublin-London service that could compete with flying.
HS2 to New Street would be a disaster. Where would it go? The lines in are at capacity as it is. Are you wanting to tunnel below the current station?
A Dublin to Holyhead tunnel wouldn't even compete with Dublin to Liverpool flying, let alone Dublin to London.
It is international, but the UK and the Republic of Ireland are in the Common Travel Area so there are no immigration checks. As such the check in times are as per domestic flights.2) I'm pretty sure a Liverpool to Dublin flight would be classed as international.
It is international, but the UK and the Republic of Ireland are in the Common Travel Area so there are no immigration checks. As such the check in times are as per domestic flights.

Give £2bn to each of the largest 25 cities to build or expand light rail/tram schemes taking over local rail lines and freeing up capacity for more inter-urban services
HS2 to New Street would be a disaster. Where would it go? The lines in are at capacity as it is. Are you wanting to tunnel below the current station?
It is international, but the UK and the Republic of Ireland are in the Common Travel Area
A bridge (rather than a rail only tunnel) would certainly destroy the Ireland-UK Air Market through a combination of high speed train travel options mixed with the flexibility of simply driving.