........ Eurostar struggles to compete against the Paris - London flights
HS2 isn't coming from existing "rail" budgets, so if it gets the chop then we can probably forget about all that money.
"Woodhead" will be covered by HS3 (or Northern Powerhouse Rail, or equivalent), if you are talking about a fast(er) route between Sheffield and Greater Manchester.
The GC? Well, what bits of it? The southern end essentially exists. There's still *some* capacity on the MML (we could find a way of replacing five coach 222s with something that has more seats before we need to worry about a broadly parallel line). EW will provide a better link between the MML and WCML.
A tunnel to Ireland? Not now we are coming out of the EU, no. We should really have got them to pay for that kind of project before voting out... Eurostar struggles to complete against the Paris - London flights, and I can't see rail being competitive on Dublin - London. The line from Holyhead to Chester doesn't serve anywhere of significance in between, so there aren't going to be a lot of intermediate passengers.
We are getting lots of money spent on upgrading the "classic" network (e.g. electrification of the GWML/ MML, EW, EGIP, the Manchester Hub), and any other worthwhile projects have a chance of being included on that spending list if they can wash their face financially.
Maybe the question should be (as Agent_c suggests) how you'd solve the need for additional capacity between London/ Birmingham/ Manchester, between London and Leeds etc? (If the answer is rebuilding piddly little branch lines that closed fifty years ago then I'm out!)
Just a thought, if HS2 was cancelled, what if all the money £50 billion had to be spent on rail projects, reopen the GC? rail tunnel to Ireland? Woodhead?
Very little. In fact, you could create tons more capacity at a single stroke by slowing everything down to 60mph - no longer any need to path slow freights and fast express trains around each other, trains can run closer together without catching up to the service in front.Probably the best thing would be to build some by passes so fast expresses could overtake stopping trains and be sped up in the process ie Morpeth, Durham, the more twisty part of the WCML, Dawlish etc
How much extra capacity that would create is debatable...
Very little. In fact, you could create tons more capacity at a single stroke by slowing everything down to 60mph - no longer any need to path slow freights and fast express trains around each other, trains can run closer together without catching up to the service in front.
Just a thought, if HS2 was cancelled, what if all the money £50 billion had to be spent on rail projects, reopen the GC? rail tunnel to Ireland? Woodhead?
Just a thought, if HS2 was cancelled, what if all the money £50 billion had to be spent on rail projects, reopen the GC? rail tunnel to Ireland? Woodhead?
I never said it was a good idea! Just that if what you want is capacity *and nothing nore* then there's a heck of a lot cheaper way to achieve it than by sticking expensive plasters on the current network.But if you did the airlines would have a field day on the London to Scotland market and probably more
Is happening anyway.Electrify to Aberdeen
... opportunities that will come from the outrageously cheap fares that HS2 could deliver.
I expect it to be as cheap or cheaper than current lines. They will have a lot of capacity to fill and won't fill it with expensive fares.Ha! As if HS2 will be cheap.
Just a thought, if HS2 was cancelled, what if all the money £50 billion had to be spent on rail projects, reopen the GC? rail tunnel to Ireland? Woodhead?
Very little. In fact, you could create tons more capacity at a single stroke by slowing everything down to 60mph - no longer any need to path slow freights and fast express trains around each other, trains can run closer together without catching up to the service in front.
I never said it was a good idea! Just that if what you want is capacity *and nothing more* then there's a heck of a lot cheaper way to achieve it than by sticking expensive plasters on the current network.
Surely the aim ought to be to have as many trains as possible running at the same top speed (whatever that is) with similar acceleration. Reducing to 60 mph does sound a little drastic !
There appear to be several forces driving the progress of HS2:
1. A vanity project, to keep up with other "advanced" countries in having high speed lines linking England's major cities.
2. A desire for speed so that people can get away from the depressed North as quickly as possible and facilitate even greater development in the South-East of England.
3. A need for greater capacity on rail routes from London to the North.
The UK, particularly following Brexit, is not as wealthy as most Western Eropean countries (including Germany/France/Italy) and can't afford to pay for massive infrastructure projects like HS2.
England is far smaller than most other countries so the need for speed is less; it is only just over 2 hours from London to Leeds or Manchester by current trains.
There is a capacity problem on some main lines north of London, but it is essentially confined to the London-Birmingham/Crewe section of the WCML. (There are also some bottlenecks on the ECML, in particular the Welwyn viaduct and through Peterborough due to closure of the old GE/GN joint line from March to Spalding, but these could be dealt with by short bypasses.) Significant expenditure could be saved by not building the 2nd phase of HS2, i.e. beyond Crewe and through the East Midlands, where the need is much less from a capacity perspective.
Trains could divert off HS2 to Derby/Sheffield and Stoke/Manchester and extend beyond Crewe to Liverpool/Scotland/North Wales via existing lines. Birmingham services should run into the current New Street station to facilitate connections there and extensions beyond to Walsall/Wolverhampton. Leeds should still be served by the ECML and Leicester/Nottingham via the MML. All trains for this limited HS2 construction should be "classic compatiible" to enable them to run on existing main lines.
This slimmed down version of HS2 might just be affordable. Hopefully, the sensible Chairman May will reassess this oversize project promoted by her hubristic predecessors before construction starts.
There appear to be several forces driving the progress of HS2:
1. A vanity project, to keep up with other "advanced" countries in having high speed lines linking England's major cities.
2. A desire for speed so that people can get away from the depressed North as quickly as possible and facilitate even greater development in the South-East of England.
3. A need for greater capacity on rail routes from London to the North.
The UK, particularly following Brexit, is not as wealthy as most Western Eropean countries (including Germany/France/Italy) and can't afford to pay for massive infrastructure projects like HS2.
England is far smaller than most other countries so the need for speed is less; it is only just over 2 hours from London to Leeds or Manchester by current trains.
There is a capacity problem on some main lines north of London, but it is essentially confined to the London-Birmingham/Crewe section of the WCML. (There are also some bottlenecks on the ECML, in particular the Welwyn viaduct and through Peterborough due to closure of the old GE/GN joint line from March to Spalding, but these could be dealt with by short bypasses.) Significant expenditure could be saved by not building the 2nd phase of HS2, i.e. beyond Crewe and through the East Midlands, where the need is much less from a capacity perspective.
Trains could divert off HS2 to Derby/Sheffield and Stoke/Manchester and extend beyond Crewe to Liverpool/Scotland/North Wales via existing lines. Birmingham services should run into the current New Street station to facilitate connections there and extensions beyond to Walsall/Wolverhampton. Leeds should still be served by the ECML and Leicester/Nottingham via the MML. All trains for this limited HS2 construction should be "classic compatiible" to enable them to run on existing main lines.
This slimmed down version of HS2 might just be affordable. Hopefully, the sensible Chairman May will reassess this oversize project promoted by her hubristic predecessors before construction starts.
I'm sorry but I disagree with your assessment. We absolutely need HS2 and tinkering with the odd bypass here, or chord there will not solve our capacity problems in the future.
Look at the success of HS1 - many were saying it shouldn't be built, it would ruin the countryside, it'd be a white elephant etc. None of this has happened, many of the trains are wedged and the classic routes are still busy too.
We get this sort of debate every time a major infrastructure project is proposed in this country. I remember the same NIMBYS objecting to the M40 motorway.
Let's just do a proper job, get on and build it.
... but the whole point is to get rid of longer-distance express passenger trains so that the current infrastructure can be served with more stopping and semi-fast trains, so there can be better local and regional services. What would the point be in building a dedicated express route and not taking advantage of the freed-up capacity on the older one?GrimsbyPacer said:We need guarantees for current train services would not be made worse in any way in my opinion
I expect it to be as cheap or cheaper than current lines. They will have a lot of capacity to fill and won't fill it with expensive fares.