WatcherZero
Established Member
- Joined
- 25 Feb 2010
- Messages
- 10,272
They have mated a few of them to a couple of bodyshells for running tests on their test track, the rest of the bogies will have treadmill endurance testing in test rigs.
Is there any proof of this prototype existing? Last I heard they'd only built some prototype bogies?
I imagine they are piling up the champagne bottles at Hitachi ready for celebrating winning such an absurdly generous cash cow of a contract.

The train certainly looks impressive; great looking exterior. Good to see over 900 jobs made as well! Just found their A train (http://www.hitachi-rail.com/products/rv/a_train/images/a-train.pdf) as well and I wouldn't rule this out for the replacement of 142 and 143 Pacers when it finally occurs.
Replacement of Mk 3 stock on GEML will be by standard EMU, no need for IEP. MML will either see Meridian's converted to bimode and HST replaced with EMUs or an entire new fleet bought and Meridian's cascaded to West of England services.Notably, no mention of the Midland Mainline or Great Eastern.
Itll be at Doncaster, as stated in the press release.So where is the new East coast maintenance depot, i heard rumours of sheffield? Has it been confirmed? Seems to say here doncaster but i dont entirel trust what BBC say.
http://www.bbc.co.uk/news/business-18979836
I think all maintenance on East Coast's HSTs is done at Craigentinny and Neville Hill, so on the assumption IEPs are like for like replacements for the HSTs in theory won't be necessary. Of course diagrams are likely to change.Does anyone know if the East Coast IEPs will make their way to and from Old Oak for maintenance alongside the Great Western ones?


Well it is hardly news, just confirmation financial close has been reached on something previously announced.There has been virtually nothing on the radio or TV about this important news! They focus on the bad news and leave this great news hidden.
Nothing has been agreed with regard to the replacement of the 225s with IEPs, it remains simply an option for the future. They would not be replaced before 2020 at the earliest.When will the Class 91 East Coast electrics be replaced?
There has been virtually nothing on the radio or TV about this important news! They focus on the bad news and leave this great news hidden.
They switched Crossrail back to Government financing from Private Financing some months ago.
but the bi-mode concept
Chris
A railway system which is frequently perceived as "better" than the British one , IE SNCF has recenlty introduced 326 bi-mode units onto their network. Not only that , approaching half of them are bi-mode bi current so I'm not sure why this is objected to by the Brits , surely it's a filler position ?
A railway system which is frequently perceived as "better" than the British one , IE SNCF has recenlty introduced 326 bi-mode units onto their network. Not only that , approaching half of them are bi-mode bi current so I'm not sure why this is objected to by the Brits , surely it's a filler position ?
I think all maintenance on East Coast's HSTs is done at Craigentinny and Neville Hill, so on the assumption IEPs are like for like replacements for the HSTs in theory won't be necessary. Of course diagrams are likely to change
If the maintenance for East Coast moves from Leeds (Neville Hill) to Doncaster (purpose built depot for new stock, like the TPE depot at York) then that would free up a bit of space at Neville Hill (alongside the expected loss of the maintenance for EMT sets, due to MML electrification not reaching Leeds).
This could see the dozen (or so) "South Yorkshire" Northern DMUs that are officially looked after in Newcastle (Heaton) moved to Leeds (on paper)?
The gossip going around would indicate that the trains are not those at all wanted by most in the industry who might normally make such descions- senior personnel at TOCs and their parent groups. They're not happy about the trains, and they're not happy about the structure of the deal. Obviously the existing ROSCOS aren't happy either- with this, Thameslink and Crossrial they're rather shut out of the deals- but they they're parasitic scum anyway. ahem.
There's apparently been very little support for the deal for a long time now outside of the Department of Transport.
As Northern already has a well established and logical stabling and maintenance facility at Sheffield, I am certainly inclined to agree with you that it would be a good place to build a larger depot if Northerns’ East side gains a greater quantity of rolling stock. There is definitely enough vacant railway land at the likes of Brightside to allow it.Neville hill will soon need place for more EMUS and DMUS as WYPTE try to extend their trains.
Maybe sheffield could do with a bigger depot, and i think brightside has a perfect bit of railway land to do it on...