Hi. I have been reading this forum daily for about a week since I found it, and I am curious why everyone hates the IEP. I have seen a picture of it and it looks all pointy and fast. So what gives?
I have seen a picture of it and it looks all pointy and fast. So what gives?
Hi. I have been reading this forum daily for about a week since I found it, and I am curious why everyone hates the IEP. I have seen a picture of it and it looks all pointy and fast. So what gives?
My personal opinion is that a fleet of Adelante-, Voyager- and Pendolino-style
multiple units would be much better suited to operations than LHCS (locomotive hauled coaching stock), but that's got its drawbacks too.
Up to a point MU operations are better but where LHCS has its place is running beyond the wires without carting around an extra 200 tonnes of dead weight and also strengthening the service, you can "adjust" the length of the train on a daily basis depending on anticipated demand.
IEP is estimated to cost £449 million per year in leasing costs, roughly double the cost per carriage as a Pendolino.
IEP isn't a leasing deal, it's lease and supply. Virgin also pay Alstom a large amount of money to maintain the Pendolinos, on top of the leasing fees to the ROSCO, and from the figures I've seen the total cost of IEP is nowhere near double the total cost of Pedolinos.
I think a lot of the hate stems from enthusiasts like myself, who love the HST, and will naturally hate any replacement, I however am going to try my best to embrace the IEP.
I however am going to try my best to embrace the IEP.
Good luck with that!
I reckon the IEP will just be an expensive, over complicated white elephant trying to be all things but succeeding at none of them.
Because the coaches are going to be 26 metres long either they will be very narrow or a lot of the network will have to be gauge cleared.
I think a lot of the hate stems from enthusiasts like myself, who love the HST, and will naturally hate any replacement
... or a lot of the network will have to be gauge cleared.
I'm sure you've seen it already, but those figures come from the definitely reliable and not at all biased Railway Eye - but that article does link to a more reputable source (subscribers only) and claims to compare cost per diagrammed vehicle per month.
What makes me chuckle about this project is that there have been people on here saying IEP is going to be a disaster. It's quite funny because there isn't even a prototype let alone production units so how anyone can judge the project is ridiculous. Let it play out and then judge, there is nothing to base this view on judge figures etc:roll:
People are too afraid of the new
Didn't the APT project begin in 1969 and end in 1986 (not including IC225)?
The 26m length is an issue - it looks like the summer Saturdays services to Pembroke Dock will be lost - theirs a tunnel near Narberth that cant be adjusted to fit them and then theirs the amount of clearance work going on to accommodate them including making the freight branch form Margam to Tondu capable of having them in an emergency and then creating a turnback facility at Tondu so they can reverse to Bridgend.
I think the pendo's are a prime example why people are sceptical about these new trains. Instead of them being made for passenger comfort, they seem to be designed by accountants thinking how many seats can we cram into a coach etc. a prime example of this is the fact that on the pendo's a lot of the seats don't have a window
basic issue is that the UK is generally a high frequency passenger railways with short formations - given the structural growth seen in the last 30 years it desperately needs a mechanism to add new carriages on all lines in a relatively cheap manner
I think a lot of the hate stems from enthusiasts like myself, who love the HST, and will naturally hate any replacement, I however am going to try my best to embrace the IEP.
They are actually 1 cm wider than mark 3 so that sounds like a lot of gauge clearance. I have asked my MP to obtain costs under Freedom of Information.Good luck with that!
I reckon the IEP will just be an expensive, over complicated white elephant trying to be all things but succeeding at none of them.
Because the coaches are going to be 26 metres long either they will be very narrow or a lot of the network will have to be gauge cleared.
The bogies on a mark 3 are 16 metres apart. They will have to be further apart on IEP as otherwise there is a of relative end movement. The iactual figures must be published somewhere.It is being done. It's been in the public domain via the various CP4 enhancement plans for at least a couple of years.
Modern Railways have published detailed drawings of the layout, the necessary taper is all between the doors and the coach ends. There's little or no reason why the main part of the coach bodies will be any narrower than a Mk 3, because the bogies will be a similar distance apart.