They have not said they will be scrapped will you stop saying that. They will be available for other people to use on an significantly increasing electric network.
They have as good as said 91s will be withdrawn and scrapped in 2020. They have said the 91s will be replaced on the East Coast and they are also introducing IEPs on the Great Western. That doesn't really leave anywhere for the 91s, being high speed Intercity locos, to go. The obvious, option of sending the mrk4s to London-Norwich, would likely see 90s or TraXX rather than 91s as haulage. And the tilt modification was never done which rules out the WCML too.
So we have a standard Intercity Train but you are suggesting 2 different solutions Bi Mode for 1 route and Diesel Dragging for a another!!
Yep, bi-mode for Great Western and loco-drags for East Coast. The suituation is different with the two franchises, why shouldn't there be two different solutions?
Your persistence in using the term 'DaFT' throughout this thread suggests you don't have the ability to competently contradict their thinking, and is becoming annoying.
I didn't invent the term, it has been used by others on the railway forums I visit. The department has been reported to be insufficently competent with respect to decisions regarding the railways by sources far more reputable than a mere passenger and public transport enthusiast like myself.
Whilst it is true that there could be the potential for cost savings by pooling with the sleepers, this is only one or possibly two out of maybe six or seven, so isn't as substantial as you might think, a lot of the cost being the baseline for having any in the first place.(Although it would greatly improve the apparent financial situation of the sleeper.)
There are currently three highland sleeper portions, each requiring one loco diagram, right? That incurs the baseline costs for having locos in the first place, doesn't it? Without tinkering with the timetable to optimise diagrams, I reckon the East Coast Aberdeen and Inverness services would add three additional loco diagrams to the sleeper pool, for a total of six. Tinker with the timetable though and you should be able do the three sleepers and the East Coast Aberdeen and Inverness runs with four diagrams, just one loco more than now rather than an estimated 7 bi-mode diagrams (now can you see why I don't think East Coast has enough off-wire work to need a diesel fleet?)
Designing a bi-mode tilting train suffers from the same expense problem as designing a tilting version of IEP. In fact, they must be very nearly equivalent statements
I disagree that the statements are nearly equivalent. To me at least, adding (a) diesel generator(s) into a tilting train design sounds a lot less technically challanging than adapting a non-tilt design to a tilting one. You wouldn't want to do it to existing Pendolinos though, and granted adding (a) diesel generator(s) to the design for new Pendolinos would still need development work (unless they already in existance somewhere).
EC didn't have these constraints when ordering new trains, and lo they went for bi-mode.
Correction, they didn't go for bi-mode, the department for transport did. We don't know what franchise bidders would have wanted if the rolling stock wasn't mandated, but there have been allegations that somebody at the department had vested interests with Hitachi and influenced the decision. I have read phrase "the answer's Hitachi, now what's the question".
I'm confused as to why you now accept bi-mode for the Cotswolds but not for very similar routes (mainly less than or equal to 100mph, plenty of stops, etc) - you then lose quite a lot of the benefit by only having one standard thing, which surely underpins your whole argument for an all electric EC.
Which similar routes I you refering to? Part of my reasoning for accepting bi-mode IEP on the Cotswolds is that arround half the route is to be electrified and the remaining half is a considerable distance (so would need a fair few locos for drags or alot more wires to completely electrify). Another reason is that the split frequency (hourly to Worcester, but with some continuing to Hereford) pushes it some way down the list in terms of electrification priorities. Conversely, Cheltenham and Weston-Super-Mare will probably see an hourly IEP service which would require a relatively short extension of OHLE to convert to electric traction. As things stand, the PAD-Penzance route would have such a small percentage of electrification that the savings under the wires would likely be outweighed by increased fuel consumption required for IEP's more rapid acceleration compared with an IC125. Over that distance, there's also the comment from First Great Western about passengers not wanting the underfloor engine noise of class 222s on that route.
I'm intrigued to know what difference you think you can personally make.
Me too. I'd like to, but there was an 'if' in that sentance. Maybe it should have been a very big 'if'. Writting letters/e-mails is the only weapon I have.