Either that or the TOCs concerned don't want to enter in to the IEP full service PFI contract, although they may well consider and place an order for class 800/801 SETs
But the requirment to go to tender thorughout the EU could result in different stock getting ordered by the TOCs even if the original intention was the IEP.Either that or the TOCs concerned don't want to enter in to the IEP full service PFI contract, although they may well consider and place an order for class 800/801 SETs
But as I said above, would they really have to be fully compatible with the IEP? Ordering a different fleet of trains for the Plymouth/Penzanace route wouldn't be any less compatible than using HSTs on that route for many years into the future which is a possibility. If there really isn't a good reason for the trains to have to be fully compatible then I'm not sure if specifiying it as part of the contract would be allowed, it could be considered anti-competitive.What other bi-mode multiple units that are fully compatible with IEPs are available?
But the requirment to go to tender thorughout the EU could result in different stock getting ordered by the TOCs even if the original intention was the IEP.
So IEP for Plymouth/Penzance has officially been removed as an option in the contract then rather than the DfT deciding that it will be left to the TOCs to decide if they wish to take it up?
Interesting stuff (and nice to see this thread going back to factual discussion about IEP rather than the well trod "what if" about eVoyagers and the opinionated bashing of IEP that it was in danger of descending in to)
There would need to be a good reason for insisting on compatibility though. In the case of Paddington to Penzance I'm not sure there is since the other possibilites involve having a separate fleet for these services (either HSTs or 222s) so it may well be argued that there is no need for a uniform/fully compatible fleet. Even in the case of the West Coast I seem to remember that another party was under consideration for the new 6 car trains which would have been built if First had won the franchise. I'm not sure if these would have been compatible with the 390s.Ask for a small number of new build trains, each electric and capable of 225km/h but also fitted with an emergency power source and the possibility of conversion to bi-mode. There's very little point in Alstom, Siemens or Bombardier offering to build a very small number of an entirely new design of train to meet this so it's almost certain that Hitachi would be either the only bidder or would be the only sensible bid. In the same way it's unlikely that anyone other than Alstom or Alstom+Bombardier would be able to supply a fleet of mini-Pendolinos as they would need to tilt and be compatible with the existing fleet of 390s and 221s for rescue and operational purposes. Tendering only really works well when it's an entire fleet of new trains being ordered from a new design and where there is little need for interaction with older or other fleets, such as the Thameslink or Crossrail tenders.
As wonderful as the tendering system might be claimed to be it's still reasonably easy to bend the process one way or another without doing anything illegal. Ask for a small number of new build trains, each electric and capable of 225km/h but also fitted with an emergency power source and the possibility of conversion to bi-mode. There's very little point in Alstom, Siemens or Bombardier offering to build a very small number of an entirely new design of train to meet this so it's almost certain that Hitachi would be either the only bidder or would be the only sensible bid. In the same way it's unlikely that anyone other than Alstom or Alstom+Bombardier would be able to supply a fleet of mini-Pendolinos as they would need to tilt and be compatible with the existing fleet of 390s and 221s for rescue and operational purposes. Tendering only really works well when it's an entire fleet of new trains being ordered from a new design and where there is little need for interaction with older or other fleets, such as the Thameslink or Crossrail tenders.
There would need to be a good reason for insisting on compatibility though. In the case of Paddington to Penzance I'm not sure there is since the other possibilites involve having a separate fleet for these services (either HSTs are 222s) so it may well be argued that there is no need for a uniform/fully compatible fleet. Even in the case of the West Coast I seem to remember that another party was under consideration for the new 6 car trains which would have been built if First had won the franchise. I'm not sure if these would have been compatible with the 390s.
I understand Siemens are re-mooting the Venturio concept for the UK. Members might remember is Venturio as an original HST replacement in the early 00's. But now in the form of a pure EMU and not a DMU. Could be interesting, perhaps not for GWML but for the MML!?
If I remember rightly, DB's Class 411 and 415 tilting ICE trains are Venturios-maybe something similar could be used for 125mph MML running? Here's the link to the ICE T: http://en.wikipedia.org/wiki/ICE_T
Interesting indeed, I feared financial viability of removing the engines from bi-modes would delay such an exercise until a half-life overhaul (let's say 15yrs after introduction). 10 years isn't quite so bad, but (assuming 2019 introduction for IEP) wiring the likes of Hull, Harrogate, Weston-Super-Mare and Cheltenham in the 2020-2024 timeframe would still leave at least 5 years of under-wires running for bi-modes. That might still see such schemes delayed by 5 years or so to co-incide with the end of the engine lease.Firstly, Hitachi confirmed that the MTU power units for the Class 800 (I did not ask with regard to the Class 801) are on a 10 year lease. At 10 years, Agility Trains can then extend the lease or return the power units to MTU. This would happen if (more likely when) the Class 800s became Class 801s due to the expansion of electrification in CP6-7. Very interesting and logical contracting I thought.
IC125s to live on then, but 91s not so? Makes no sense to me, keep the 91s also (if I had to replace either, I'd probably go with the Penzance IC125s, but I think replacing either is wrong (all IC125s other than the Exeter/Plymouth/Penzance etc. route should go though)).Secondly, the follow on orders within the original IEP specification/tender are cancelled/voided/over (I forget the specific term used). By follow on orders I mean the GWML Newbury-Penzance
Hang on, that sounds more like the decision on whether these options would be taken on has been transfered from DfT to the TOCs, rather than being ruled out altogether.Hitachi stated that the relevant operators would be responsible for ordering more Class 800/801 for these services if they thought they were an operational requirement.
Interesting to see a full list of the options, and particularly interesting to see Aventra on it as the Derby offering rather than the 110mph Electrostar order.Thirdly, within FGW DfT remit to source EMU units for the electrified GWML there are two sorts of requirements. One which can be addressed by Class 319s, Adventra's, Desiro City's or AT100/200 half breed (Hitachi's wording by taking the benefits of the AT 100 and 200 to make a bespoke unit for the GWML Class 165/166 replacements).
Yes, interesting. I had assumed the current thinking was that Oxford fasts would be covered by the same 100-115mph units proposed to replace the 165s/166s. Aren't the high-density micro-buffet IC125s primarily intended for the Oxford fasts though, meaning a 5-car unit wouldn't cut it.The other requires a 125/140 mph EMU for the Oxford fasts which are currently a HST diagram. Thus FGW/DfT can order the proposed 5 Car Class 801s first required within the IEP deal, but now as a separate order through a ROSCO at reduced cost. This would then allow for Hereford/Worcester 5 car Class 800 services to be doubled with a 5 car Class 801 between Paddington and Oxford. Again, very interesting and logical.
Ah, that explains why Thor is dead! I find it hard to believe though, how can not having to build new bodyshells etc. not save money over a new-build train? The 220/221/222 to receive a pantograph/transformer coach would need a total re-build of the entire train.Operation Thor would match the cost for a like for like brand new EMU!
How many 125mph EMUs do they need? I guess if class 801 is a contender then I guess guage-clearance is considered quite cheap on the MML route. If that's the case, then sharing an IEP fleet with East Coast would seem sensible (the ICEC depot for IEP is Doncaster isn't it?). Then the excess bi-modes on the EC franchise if/when Hull/Harrogate are wired could be used on EMT's off-wire London services, without having two seperate bi-mode micro-fleets, and the surpluss 'electric' IEPs ordered to replace IC225s which don't need replacing can be used on the MML.EMT did not say which 125mph EMUs they were considering, but noted that the Class 801 is a contender.
If they are intermediate cars to be inserted into existing sets to make them useful lengths for XC services (with legroom and seat-window alignment improved as a bonus) then maybe it would be a good idea. Otherwise, bad idea.Build a Voyager-type unit? Hands up anyone who think more vehicles to that design are a good idea...
Actually, that's a very interesting example. Before the ICWC franchising mistakes came out, it seemed Virgin were making use of that to ensure Alstom Pendolinos would be the new stock. However First were supposedly in negotionations with multiple potential train builders (CAF and Alstom being the front runners if I remember correctly).In the same way it's unlikely that anyone other than Alstom or Alstom+Bombardier would be able to supply a fleet of mini-Pendolinos as they would need to tilt and be compatible with the existing fleet of 390s and 221s for rescue and operational purposes.
There are certainly aspects of the class 800/801 which sound good. Unlike some, I don't think choosing Hitachi was a bad thing (although it will be a shame if the Derby factory is lost).Whether you agree or not with the Intercity Express Programme, the product being delivered for Agility Trains by Hitachi in the form of the Super Express Train/Class 800/801 is a fantastic high quality, modern, technologically advanced goddess of the rails.
Mock-ups? Or has there been some construction progress of the prototype sets?(We were shown images from Japan of the cabs, stunning train!)
My experiences riding Voyagers and Meridians show them to be superior to HSTs, which is what I am proposing they should have replaced, ten years ago or more.
HSTs should never have made it into the 21st Century in front line service.
Either that or the TOCs concerned don't want to enter in to the IEP full service PFI contract, although they may well consider and place an order for class 800/801 SETs
Rhydgaled said:Interesting indeed, I feared financial viability of removing the engines from bi-modes would delay such an exercise until a half-life overhaul (let's say 15yrs after introduction). 10 years isn't quite so bad, but (assuming 2019 introduction for IEP) wiring the likes of Hull, Harrogate, Weston-Super-Mare and Cheltenham in the 2020-2024 timeframe would still leave at least 5 years of under-wires running for bi-modes. That might still see such schemes delayed by 5 years or so to co-incide with the end of the engine lease.
IC125s to live on then
Aren't the high-density micro-buffet IC125s primarily intended for the Oxford fasts though, meaning a 5-car unit wouldn't cut it.
There are certainly aspects of the class 800/801 which sound good. Unlike some, I don't think choosing Hitachi was a bad thing (although it will be a shame if the Derby factory is lost).
However, the way DaFT have ordered and specified the new trains is a let down in some respects, most noteably:
Train length of some sets, resulting in a reduction in capacity on some Great Western services
Porportion of bi-mode based on current/committed electrification with no allowance for potential expansion of electrification immediately after introduction of the trains (although 10 years before conversion from bi-mode to electric becomes feesible is better than the 15 years I had feared)
Inclusion of wasteful, un-necessary, IC225 replacement component
Removal of hot food from standard class
All DaFT's fault as far as I'm aware, Hitachi for their part will probably deliver a decent product.
But as I said above, would they really have to be fully compatible with the IEP? Ordering a different fleet of trains for the Plymouth/Penzanace route wouldn't be any less compatible than using HSTs on that route for many years into the future which is a possibility.
Indeed, no one knows. The issue I have is that, because nobody knows, DaFT have specified a number of bi-modes assuming no more electrification takes place. Things like this need to be planned ahead better, we need to know what electrification will happen in CP6 so we know how many diesel trains vs electric ones we need to introduce in CP5.Then again, it might not. Since post 2019 electrification schemes have yet to start emerging, no-one knows.
So Hull Trains might even electrify one of the routes IEP bi-mode is intended for before IEPs reach squadron service on East Coast? Doesn't that sound silly to you?IEP is going to start running in 2017. And Hull may be wired in the next few years if Hull Trains can pull it off.
Exactly, a cost. And who will pay that cost? My fear is nobody will want to pay it and as such electrification will be defered until that cost is gone.The engines can be removed at any time, if no longer required. It is just the lease that runs for 10 years, a lease that presumably has a clause allowing Hitachi to end it sooner, at a cost.
I know they get to lots of places, but I assumed the need for capacity and reduced need for catering facilities applied to PAD-Oxford more than any other route, and hence inspired the introduction of micro-buffet sets.No, the high-density micro-buffet sets get to lots of places in FGW-land, except to Devon and Cornwall as a rule, but low-density HSTs do get to Oxford and on up the Cotswold Line if that's what's available for the diagram in question.
Really, with no standing passengers at all, for entire diagrams?And off-peak, a five-car set would be able to handle the loads on some Oxford fasts perfectly happily.
Nevertheless, the 91s are an asset that will not be life expired in 2020 and replacing them with new traction is more (wasted, in my opinion) expendeture.IC225 - The coaches may well keep on going elsewhere, with new traction. The 91s are a small, complex loco fleet that is not cheap to run, again as pointed out to you previously.
Options required by DfT, but apparently (going on draft layouts (yes, I know they are drafts)) they have now decided that the snack trolley is the option they wish to provide for standard class passengers.Hot food - is it so hard to remember all that stuff I posted just last weekend (page 3 of this thread, post 43) about the range of options for catering arrangements. Options that were required by DfT
I expect Southern required compatibility so that the units could work with others if the need were to arise but a new fleet of say 9 car trains for use on the Paddignton to Plymouth/Penzance route is not going to need to work with other units so I'm not sure the trains would have to be compatible. Also by not requiring compatibilty I expect other train builders would be more interested and some may be able to offer a cheaper alternative.Shouldn't be a problem - after all, if Southern can specify compatibility with their existing fleet for the 377/6 order, despite them only working with each other in normal service and replacing incompatible 455/456 units, then then there's no reason why a FGW order to replace HSTs couldn't require compatibility with the IEP fleet.
I expect Southern required compatibility so that the units could work with others if the need were to arise but a new fleet of say 9 car trains for use on the Paddignton to Plymouth/Penzance route is not going to need to work with other units so I'm not sure the trains would have to be compatible. Also by not requiring compatibilty I expect other train builders would be more interested and some may be able to offer a cheaper alternative.
So Hull Trains might even electrify one of the routes IEP bi-mode is intended for before IEPs reach squadron service on East Coast? Doesn't that sound silly to you?
Exactly, a cost. And who will pay that cost? My fear is nobody will want to pay it and as such electrification will be defered until that cost is gone.
No, not necessarily. I'll say it again. Nothing has been decided about stock for the West Country expresses. If Hitachi and a leasing company come up with a keen price for more IEPs, what do you think an operator is going to do? Buy a new train that is compatible with the rest of its fleet, or try to keep a 1970s one going for another decade, which won't come cheap?
Really, with no standing passengers at all, for entire diagrams?
Nevertheless, the 91s are an asset that will not be life expired in 2020 and replacing them with new traction is more (wasted, in my opinion) expendeture.
Options required by DfT, but apparently (going on draft layouts (yes, I know they are drafts)) they have now decided that the snack trolley is the option they wish to provide for standard class passengers.
So Hull Trains might even electrify one of the routes IEP bi-mode is intended for before IEPs reach squadron service on East Coast? Doesn't that sound silly to you?
Really, with no standing passengers at all, for entire diagrams?
I expect Southern required compatibility so that the units could work with others if the need were to arise but a new fleet of say 9 car trains for use on the Paddignton to Plymouth/Penzance route is not going to need to work with other units so I'm not sure the trains would have to be compatible.
Yes, I am aware of portion working, but my opinion is that is should only be used with gangwayed-units like class 158s. With units like IEP, if used in multiple they should only be coupled/uncoupled out-of-service at the ends of services. But even then, I think some of them will end up running along at times when they don't provide enough capacity because at peak times the whole lot might need to be doubled, and I don't think there are enough units to run all diagrams doubled for part of the day.You are aware of portion working? Off-peak 5-car sets will be the norm but in the peak doubled up 10-car sets will be. You seem to be clinging to the notion that these trains will run as 5-car sets all the time. This will not be the case.
Not on East Coast. That franchise I think only has 10 diagrams that extend beyond the wires at present. Unless Grand Central go bust/pull-the-plug like Wrexham and Shropshire did and the East Coast franchise takes over the services.Not really, there would still be plenty of routes which would need it.
Can you fit a microwave in the trolley stowage area (the size of a standard toilet I think) given the trolley needs to fit in there too? And why can't they do something like swapping the Kitchen with the first class section of the composite coach, so that the kitchen/buffet is between first and standard like on the IC125 and IC225 fleets.Trollies do not mean that passengers can't have hot food at their seats, as it could be possible for there to be a microwave in the catering facilitiy in stadard class
I am still not convinced that portion working without split destinations is worth it. (So for example Liverpool-Norwich with 4 cars LIverpool-Nottingham and 2 cars Nottingham-Norwich)
Once you consider the operational problems and the additional costs it starts to look like a false economy, additional staff, additional vehicles, reduced capacity over the 'busy' end of the route and all that.
The marginal savings seem to be just that, pretty marginal.
But when you start regularly leaving people at Manchester Piccadilly and Stockport it suddenly becomes worth it.
I am still not convinced that portion working without split destinations is worth it. (So for example Liverpool-Norwich with 4 cars LIverpool-Nottingham and 2 cars Nottingham-Norwich)
Once you consider the operational problems and the additional costs it starts to look like a false economy, additional staff, additional vehicles, reduced capacity over the 'busy' end of the route and all that.
The marginal savings seem to be just that, pretty marginal.
You find me some more units then. Then i will agree.
I'd say there could be a fair saving with Portion working - Take SWT's 159 fleet at Salisbury
Assuming all services are strengthen it's a potential saving of at least 8 units
I am still not convinced that portion working without split destinations is worth it. (So for example Liverpool-Norwich with 4 cars LIverpool-Nottingham and 2 cars Nottingham-Norwich)
Once you consider the operational problems and the additional costs it starts to look like a false economy, additional staff, additional vehicles, reduced capacity over the 'busy' end of the route and all that.
The marginal savings seem to be just that, pretty marginal.
The Exeter is a special case which is rather unlike the system anywhere else.
Rhydgaled said:The issue I have is that, because nobody knows, DaFT have specified a number of bi-modes assuming no more electrification takes place.
So Hull Trains might even electrify one of the routes IEP bi-mode is intended for before IEPs reach squadron service on East Coast? Doesn't that sound silly to you?
Exactly, a cost. And who will pay that cost? My fear is nobody will want to pay it and as such electrification will be defered until that cost is gone.
I know they get to lots of places, but I assumed the need for capacity and reduced need for catering facilities applied to PAD-Oxford more than any other route, and hence inspired the introduction of micro-buffet sets.
My Quote:
And off-peak, a five-car set would be able to handle the loads on some Oxford fasts perfectly happily.
Really, with no standing passengers at all, for entire diagrams?
Nevertheless, the 91s are an asset that will not be life expired in 2020 and replacing them with new traction is more (wasted, in my opinion) expendeture.
Options required by DfT, but apparently (going on draft layouts (yes, I know they are drafts)) they have now decided that the snack trolley is the option they wish to provide for standard class passengers.
HSTEd said:For instance journey time from Oxford to Great Malvern is only 90 minutes.
That implies a total of 3 hours end to end from Paddington.
it can have other advantages- take the split working for the Kings Cross (and peak Liverpool Street) to Kings Lynn services. These split at Cambridge, with the rear 4/8 terminating, as north of Cambridge passenger demand is much lower and several stations are 4-car only.
There's also peak Kings Cross-Cambridge services that split at Royston having run to there fast, with the front section continuing fast to Cambridge only, whilst the rear becomes a stopping service (again, short platforms), destination Cambridge!
Nevertheless, the 91s are an asset that will not be life expired in 2020 and replacing them with new traction is more (wasted, in my opinion) expendeture.
The current deal has Agility Trains building and maintaining and the stock for under Public Private Partnership rather than leaving it for the TOCs to maintain. The contract for this did contain an option to extend this to the Plymouth/Penzance route so if it was wanted to guarantee beyond all doubt that there would be a uniform fleet of trains then they option should have been taken up.Though of course if they are compatible they can use existing maintenance facilities, existing training facilities (for both crew and fitters) and during disruption can swap diagrams with other trains.
Honestly since when did EU tendering law require companies to disadvantage themselves by forcing them to abandon long established principles of operating uniform train fleets whenever possible?