How silly would it be if someone proposed a service calling Royston-Meldreth-Foxton-Cambridge and Royston-Shepreth-Cambridge? At least a few people in all three would be very annoyed, even if they only ever go to London or Cambridge.
I doubt there are many people in Bedwyn wanting to go to Pewsey.It seems they should naturally have services linking them!
Faster acceleration plus some modest line speed improvements is how they could be 20 minutes faster.
I dont think the current version Agility and Dft are working on is anything remotely like that first announced with specs in the public domain. Anyway last time I heard the details of the new Bi-mode discussed it was two unpowered driving cars with three powered coachs each using three underfloor diesel aux power units of approx 250-350hp.
If it isn't going to run west of Newton Abbot though it doesn't need the same power as an HST when on diesel. Underfloor engines also remove the need for generator coaches which woudl cose some space. Remember that Voyagers use underfloor engines and are quite succesful when compared to an HST for power.5 Carrages? Why does a doubled up 5 carrage unit with less power per tonne than a pacer is a good idea for an intercity unit? It needs the same power per tonne on diesel as an IC125 set
If it isn't going to run west of Newton Abbot though it doesn't need the same power as an HST when on diesel. Underfloor engines also remove the need for generator coaches which woudl cose some space. Remember that Voyagers use underfloor engines and are quite succesful when compared to an HST for power.
In July 2009 with the original electrification announcement, it said work on the electrification would begin immediately. That of course didn't happen. So let's hope now it's not long before the actual physical evidence of work on the electrification going ahead.
Above the floor and below the roof. That's the advantage of multiple units, put the equipment under the floor and on the roof without losing any space for passengers.Erm, multipule engines per coach? And transformers and invertors, and power electronics, where are the passengers going again?
Yes sounds very similar to that Starry though on the IEP they would be generating power for electrical motors rather than a mechanical transmission for each axle.
Nym, the equipment for converting 25kv would be in the driving cars with the pantos while the APU equipment would be in the powered cars. Essentially as your not having each motor directly drive the axles you need much less torque and you can use several smaller lighter generators in parallel compared to the single large one in a normal DMU.
Or, removable generator modules under the floors of the coaches, for the standard APU, just have a couple somwhere in the set
You lose passenger space by having a generator coach. Underfloor engines allow for the full length of the train except the crumple zones to be used by passengers. Seeing as the units are going to be five coahes, you need all the passenger space you can get. When the train is off the wires, the diesel engines will be supplying power for the traction motors so I wouldn't have thought they could be described as auxilliary power units.In that case couldn't we have a bank of generators in the 'generator coach'
I hope you are not saying there are going to be diesel APUs running when the train is under the wires.Your right, they would be auxillary to OHLE operation
So one of the three would be powering the auxilliary systems then both when the train is under or off the wires with the other two powering the traction motors but switched off when under the wires?One of the three in operation while under the wires has been mentioned.
But it is one way to be Euro IIIii compliant, (use bus engines that drink fuel like it's going out of fassion)
The lower emissions engines in buses tend to drink more fuel than the older ones.
It won't be using as much as it would if it was supplying power for the traction motors. As I said it would allow all of the OHLE power to go to the traction motors and with engines to cart around you are going to need as much as you can get.Yes, but waste how much diesel? When under OHLE all diesel should be OFF or warming up.
That's where one of the diesel engines power the auxilliary systems when under the wires will have its use. It will allow the OHLE power that would have been for the auxilliary systems to go to the traction motors so the train will still have good acceleration.I try not to be nagative from the outset over anything but this is going to be a complete mess. Carting around diesel engines wherever they're mounted is nonsense.
If there hadn't been a sudden increase in demand in September 2002 (in part due to Virgin's agressive marketing) we may well be saying now what a success the introduction of the Voyagers was. The trains were half length but they doubled the frequency on the core route. Bristol Temple Meads will get twice as many trains to Paddington under the plans announced.5 car Intercity trains?