Modron
Member
- Joined
- 5 Feb 2019
- Messages
- 202
I will accept constructive criticism on these:
My post is in two main parts, the first is increases in services to Cardiff Central in the morning (as currently the services on offer are limited and cramped) and the second is for a number of other routes:
Part One
Service 2E00 from Cardiff Canton to Bridgend (ECS) is made up of 2 x Class 150 units. Upon arrival at Bridgend at 06:36, the train then divides with a new service being formed - the 06:42 to Aberdare (2A08) will still run as planned, but the front two coaches will form the 06:39 from Bridgend to Cardiff Central calling at Pencoed (06:46), Llanharan (06:51) and Pontyclun (06:56) before arriving at Cardiff Central (07:14) on Platform 4. This service would then couple up with the 2B55 service and work as the 07:16 Cardiff Central to Swansea.
A new service (5XXX - not too overly familiar with available headcodes) works ECS from Cardiff Canton to Maesteg at 04:40 (arrival at Maesteg at 05:35) and then works as a service to Manchester Piccadilly which will then couple up with the existing 1W48 service from Carmarthen to Manchester Piccadilly at Bridgend. The service from Maesteg would call at Maesteg Ewenny Road (05:43), Garth (05:45), Tondu (05:55), Sarn (05:58), Wildmill (06:01) and Bridgend (06:05). 1W48 would couple up and then be the rear unit of the two. The service would then operate as already advertised.
Would it also be possible to get the 06:15 from Carmarthen to call at Pencoed and Pontyclun again?
Service 1F03 from Cardiff Central to Portsmouth Harbour to start from Swansea at 05:24 and to call at Neath (05:34), Port Talbot Parkway (05:42), Bridgend (05:57) and Cardiff Central (06:21) before continuing to Portsmouth Harbour as currently advertised.
Part Two
New early morning service from Nottingham to London Kings Cross (as Leeds to London St. Pancras is currently allowed, and takes some passengers and therefore revenue from Virgin, perhaps this could be an off-set?). Service departs Nottingham at 05:00, Grantham (05:27) and London Kings Cross at 06:34. Possibility of a return train from London Kings Cross at 20:07 calling at Peterborough (20:50), Grantham (21:15) and Nottingham (21:45)
...and now an interesting one...
Service 5S35 from Bristol Barton Hill to Bath Spa will instead travel directly to Swindon and the 1S35 service to Glasgow Central will start from there instead (thus Swindon and indeed the County of Wiltshire joins the Cross Coutry family). Service departs Swindon at 05:50 and calls at Bath Spa (06:05) and Bristol Temple Meads (06:20) with a new stop at Gloucester (bypassing Bristol Parkway) at (06:55).
At Gloucester, 1S35 would couple up with a Voyager service from Cardiff Central to Blackpool North which starts at Cardiff Central at 06:00 and calls at Newport (06:15) and Gloucester (06:53). The combined service would then depart Gloucester at 07:00, 1S35 at the front with the Blackpool North portion at the rear, bypassing Cheltenham Spa as the service will need to make up time in order to fit the current diagram and then calling at Birmingham New Street at 07:56.
At Birmingham New Street, the service would split and 1S35 would continue to Glasgow Central as currently advertised. The Blackpool service would then depart prior to an ECS movement to Wolverhampton via Tame Bridge Parkway (so roughly 08:09-08:11) and call at Stafford (08:43), Preston (09:55) and Blackpool North (10:15). This service would then run as ECS to Manchester Piccadilly via Crewe and then form the front unit of the 1V55 12:05 service from Manchester Piccadilly to Exeter St. Davids.
Like I mentioned, these are just ideas, so please feel free to comment or add suggestions/amendments if I've overlooked something (I've used Real Time Trains to the best of my ability and tried not to hold existing services up if at all possible!)
My post is in two main parts, the first is increases in services to Cardiff Central in the morning (as currently the services on offer are limited and cramped) and the second is for a number of other routes:
Part One
Service 2E00 from Cardiff Canton to Bridgend (ECS) is made up of 2 x Class 150 units. Upon arrival at Bridgend at 06:36, the train then divides with a new service being formed - the 06:42 to Aberdare (2A08) will still run as planned, but the front two coaches will form the 06:39 from Bridgend to Cardiff Central calling at Pencoed (06:46), Llanharan (06:51) and Pontyclun (06:56) before arriving at Cardiff Central (07:14) on Platform 4. This service would then couple up with the 2B55 service and work as the 07:16 Cardiff Central to Swansea.
A new service (5XXX - not too overly familiar with available headcodes) works ECS from Cardiff Canton to Maesteg at 04:40 (arrival at Maesteg at 05:35) and then works as a service to Manchester Piccadilly which will then couple up with the existing 1W48 service from Carmarthen to Manchester Piccadilly at Bridgend. The service from Maesteg would call at Maesteg Ewenny Road (05:43), Garth (05:45), Tondu (05:55), Sarn (05:58), Wildmill (06:01) and Bridgend (06:05). 1W48 would couple up and then be the rear unit of the two. The service would then operate as already advertised.
Would it also be possible to get the 06:15 from Carmarthen to call at Pencoed and Pontyclun again?
Service 1F03 from Cardiff Central to Portsmouth Harbour to start from Swansea at 05:24 and to call at Neath (05:34), Port Talbot Parkway (05:42), Bridgend (05:57) and Cardiff Central (06:21) before continuing to Portsmouth Harbour as currently advertised.
Part Two
New early morning service from Nottingham to London Kings Cross (as Leeds to London St. Pancras is currently allowed, and takes some passengers and therefore revenue from Virgin, perhaps this could be an off-set?). Service departs Nottingham at 05:00, Grantham (05:27) and London Kings Cross at 06:34. Possibility of a return train from London Kings Cross at 20:07 calling at Peterborough (20:50), Grantham (21:15) and Nottingham (21:45)
...and now an interesting one...
Service 5S35 from Bristol Barton Hill to Bath Spa will instead travel directly to Swindon and the 1S35 service to Glasgow Central will start from there instead (thus Swindon and indeed the County of Wiltshire joins the Cross Coutry family). Service departs Swindon at 05:50 and calls at Bath Spa (06:05) and Bristol Temple Meads (06:20) with a new stop at Gloucester (bypassing Bristol Parkway) at (06:55).
At Gloucester, 1S35 would couple up with a Voyager service from Cardiff Central to Blackpool North which starts at Cardiff Central at 06:00 and calls at Newport (06:15) and Gloucester (06:53). The combined service would then depart Gloucester at 07:00, 1S35 at the front with the Blackpool North portion at the rear, bypassing Cheltenham Spa as the service will need to make up time in order to fit the current diagram and then calling at Birmingham New Street at 07:56.
At Birmingham New Street, the service would split and 1S35 would continue to Glasgow Central as currently advertised. The Blackpool service would then depart prior to an ECS movement to Wolverhampton via Tame Bridge Parkway (so roughly 08:09-08:11) and call at Stafford (08:43), Preston (09:55) and Blackpool North (10:15). This service would then run as ECS to Manchester Piccadilly via Crewe and then form the front unit of the 1V55 12:05 service from Manchester Piccadilly to Exeter St. Davids.
Like I mentioned, these are just ideas, so please feel free to comment or add suggestions/amendments if I've overlooked something (I've used Real Time Trains to the best of my ability and tried not to hold existing services up if at all possible!)
Last edited: