A Northern link ought to be considered as part of a third runway plan, even if it opens later. And by a Northern link, I don't mean to HS2, I mean to Uxbridge, or Wycombe and Watford.
A southern rail access ought not to be dependent on a third runway, but I can see LHR being sneaky and making it part of the R3 package to try and get the controversial expansion through the onslaught of opposition it will get when they finally publish proposals for permission, rather than the pre-planning stuff we've seen so far.
-----
The DfT rules out Paddington to Waterloo services unless a load of hoops are jumped through (para 6.6). But it's explicitly Paddington to Waterloo. It doesn't rule out Waterloo to Hayes & H, nor (more importantly) Paddington to Woking, services.
There's a lot of weaseling in the DfT stuff about light rail/other modes. Oddly there can't be level crossings even if we get a tram.
A southern rail access ought not to be dependent on a third runway, but I can see LHR being sneaky and making it part of the R3 package to try and get the controversial expansion through the onslaught of opposition it will get when they finally publish proposals for permission, rather than the pre-planning stuff we've seen so far.
-----
The DfT rules out Paddington to Waterloo services unless a load of hoops are jumped through (para 6.6). But it's explicitly Paddington to Waterloo. It doesn't rule out Waterloo to Hayes & H, nor (more importantly) Paddington to Woking, services.
There's a lot of weaseling in the DfT stuff about light rail/other modes. Oddly there can't be level crossings even if we get a tram.