brake problem this morning at Hull and runs 30+ late to KX and returns 20+ late start from KX - was going to terminate Doncaster but didnt quite make it finally giving up the fight at Bawtry - single line working ecml heavy delays and multiple cancellations ensue.
3 paths per hour in each direction over slw - 180113 hopefully to assist failure to Doncaster.
--- old post above --- --- new post below ---
1H04 has now assisited 1H03 into Doncaster but multiple cancellations and delays in excess of an hour to NXEC and GC services - just shows doesnt take much to make it go wrong - 4 track mainline anyone.
3 paths per hour in each direction over slw - 180113 hopefully to assist failure to Doncaster.
--- old post above --- --- new post below ---
1H04 has now assisited 1H03 into Doncaster but multiple cancellations and delays in excess of an hour to NXEC and GC services - just shows doesnt take much to make it go wrong - 4 track mainline anyone.