Plus, the fairly regular stop-start nature of the Waterloo-Exeter route is not at all suitable for HSTs, which have slow acceleration and a historical propensity to overheat on regular stop services. It is this feature of the West of England route that killed the 50s, after all.
I quite like the idea of them going on to Waterloo - Exeter, given that the capacity is about right, and the incumbent trains could be easily cascaded elsewhere.
With regard to the stop-start issue, is this still the case even with the new engines ? Plus West of Plymouth is also fairly stop-start in nature anyway.
Other thoughts - perhaps more could go on commuter services to areas unlikely to be electrified for a while - i.e. the Cotswold line or Chiltern.
More to bolster XC would be nice as well.
--- old post above --- --- new post below ---
The EPBs have terrible performance compared to the Networkers, which means the timetable would have to account for EPB performance preventing any travel time benefits purchased at great expense from being implemented.
Well, they were obviously being fairly run down by the early 90's, but if they had developed a strategy to use some of the better, newer examples for peak time capacity longer term, there would have been more justification to spend more money on them. Plus they wouldn't have been stretched so much, so perhaps reliability could have been brought nearer to the longer distance slammers.
. Have additional coaches available that the formations can be permanently increased by 1 (if platform length at Queen Street allows) should demand increase sufficiently.