HS2 Progress near Kenilworth

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,608
A new HS2 newsletter, Chiltern area winter 2025 has just been released


Towards the end is a section on construction to working railway, and it states a 50 mile test section for trains will include the Warwickshire section (it defines it as Washwood Heath to Wendover Green tunnel north portal), so this is now priority section for construction so overhead, track and signalling can be installed for train testing.

Burton Green - Kenilworth is close to middle of this testing section.
I make that section more like 70 miles than 50, are they rounding?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
A new drone video of HS2 construction where the line crosses the existing rail line near Berkswell station. Earthworks appear to be progressing to bring the trackbed to level of the structures.

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
New video from north of Kenilworth of the HS2 construction

This shows progress on the viaduct near Truggist Lane (near Balsall Common) with some views into the distance.

 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,948
Location
Mold, Clwyd
That is very close to Berkswell station, which you can see in the trees to the west. The two routes cross (WCML underneath HS2) just to the south.

The Google Map of this area looks almost up to date, and yet the Old Oak Common area still shows the Heathrow Express depot before it was demolished so that work on the HS2 site could start - must be 3 years old at least.
The Colne Valley Viaduct hardly makes an appearance yet, either.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
3 new drone videos of HS2 construction progress have been posted
Quite a lot of the embankments and cuttings are now grassed

Kenilworth - Coventry gap
Kenilworth - Burton Green
Burton Green - Balsall Common



 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
Couple of new drone videos of HS2 construction,



And near Southam (where there is little evidence yet of anything resembling a trackbed, but hugely wide earthworks)

 

MrJeeves

Established Member
Associate Staff
Senior Fares Advisor
Joined
28 Aug 2015
Messages
4,723
Location
Burgess Hill
And near Southam (where there is little evidence yet of anything resembling a trackbed, but hugely wide earthworks)
Worth considering this footage was from Oct/Nov 2025, yet only published recently.

Not sure how much more progress has been made since.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
New drone video of HS2 construction in Crackley and Burton Green area. Parts of Burton Green tunnel are now covered, but still seem to be doing lots of earthmoving

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
HS2 have announced that Burton Green tunnel is now structurally complete, the link includes a video

HS2 engineers have installed the final roof segment on the 700-metre-long Burton Green tunnel - illustrating the progress being made on the West Midlands section of Britain’s new railway.

The 16-metre-wide twin-box-shaped tunnel will carry high-speed trains beneath the village of Burton Green, near Kenilworth. The internal wall separates trains travelling north to Birmingham, Manchester and Scotland, and south towards HS2’s two London stations in Old Oak Common and Euston.

Now structurally complete, engineers and ecologists will turn their attention towards the tunnel’s 500-metre-long ‘green roof’, to ensure the structure blends seamlessly into the natural landscape, with ample green space above for local communities to enjoy

 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,126
Location
Birmingham
The A452 between Hampton-in-Arden/Meriden and Balsall Common is now routed over the new alignment & bridge that will take the A452 over the HS2 alignment. Still a bit of work to do as the route is only one side of the new alignment and single lane
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
A series of 3 new drone videos of HS2 construction in Kenilworth, Burton Green, Balsall Common area 1st August 2026

Looks like majority of trackbed is now complete, number of bridges are in use, and looks like landscaping is principally the work currently going on in this area.

Doesn't seem to be much earthmoving equipment on this section anymore, and the giant construction compounds look rather empty nowadays



 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,314
It seems to be taking a heck of a long time to reinstate the road bridge in Burton Green, it’s looked almost finished for about a year now…
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,045
Location
Surrey
A series of 3 new drone videos of HS2 construction in Kenilworth, Burton Green, Balsall Common area 1st August 2026

Looks like majority of trackbed is now complete, number of bridges are in use, and looks like landscaping is principally the work currently going on in this area.

Doesn't seem to be much earthmoving equipment on this section anymore, and the giant construction compounds look rather empty nowadays



Great set of drone videos still feel the land take was unnecessarily large and it now leaves a lot of remediation to complete. Certainly going to be a surplus of site accommodation blocks available.

Given the track is going on precast concrete segments I wonder whether there just laid on the haul road or is there another level of preparation work that has to be undertaken before that can happen?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
A new drone video, (multiple videos linked in one long flight) from Kenilworth / Burton Green area through to A45 just before Interchange station showing HS2 construction progress

The trackbed is now fairly obvious for majority of this section, with remaining earthworks mainly around the bridges, and some areas where landscaping has been partly left

 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,045
Location
Surrey
A new drone video, (multiple videos linked in one long flight) from Kenilworth / Burton Green area through to A45 just before Interchange station showing HS2 construction progress

The trackbed is now fairly obvious for majority of this section, with remaining earthworks mainly around the bridges, and some areas where landscaping has been partly left

Given good progress along this section you have wonder how Wilde tells Public Accounts Committee a couple of weeks ago that hopes to start track relaying in 2030. To my mind they should be in a position by 2030 to get mast foundations and steelwork up.
 

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
299
Given good progress along this section you have wonder how Wilde tells Public Accounts Committee a couple of weeks ago that hopes to start track relaying in 2030. To my mind they should be in a position by 2030 to get mast foundations and steelwork up.
I wouldn't be surprised if he gives dates later than at this current rate, just in case there's a hiccup and he has to delay a certain section. Means less bad press!
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,774
Given good progress along this section you have wonder how Wilde tells Public Accounts Committee a couple of weeks ago that hopes to start track relaying in 2030. To my mind they should be in a position by 2030 to get mast foundations and steelwork up.
Quite common elsewhere for the masts to be up before the tracklaying. But another 3.5 years before they can start tracklaying seems unbelievable, although not in the context of this farce
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,268
Location
West Wiltshire
Quite common elsewhere for the masts to be up before the tracklaying. But another 3.5 years before they can start tracklaying seems unbelievable, although not in the context of this farce
Unless I have completely missed it, HS2 hasn't yet ordered the plain line track, or the medium speed station throat turnouts

From memory (and apologies if wrong) HS2 did order (about 3-5 years ago now), the specialist very long high speed points, due to known long lead times. The crossovers and high speed junction points. They are rated at something like 220km/h (137mph) or higher, and possibly only one factory that can machine them
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,045
Location
Surrey
Unless I have completely missed it, HS2 hasn't yet ordered the plain line track, or the medium speed station throat turnouts

From memory (and apologies if wrong) HS2 did order (about 3-5 years ago now), the specialist very long high speed points, due to known long lead times. The crossovers and high speed junction points. They are rated at something like 220km/h (137mph) or higher, and possibly only one factory that can machine them
Correct Voest Alpine were awarded the contract three years ago for 250 high-speed, low-speed and depot points plus associated point machines. Another contract that will have penalties for prolongation potentially which makes slowing down HS2 a bizarre choice.
 
Last edited: