I'm confused, this quote implies that the Manchester HS2 station was planned to be underground but has now been redesigned to be overground. Is that true? I thought the HS2 platforms were always going to be above ground next to the existing station, then when it came to adding more platforms for NPR services there was a suggestion they could be in tunnels but instead they're going to be integrated into the above-ground station. Was there ever a suggestion that the HS2 terminus (i.e. for services from Birmingham/London) would be underground? And is Burnham now saying he wants the entire thing (HS2+NPR) to be underground?
I think your summary of the history is correct. Advocating for a wholly or partially underground station is guaranteed to be unsuccessful with the DfT/NPR/HS2. Perhaps it's a wider strategy of fully expecting to get knocked back on this issue, so using it as leverage elsewhere.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,883
I think your summary of the history is correct. Advocating for a wholly or partially underground station is guaranteed to be unsuccessful with the DfT/NPR/HS2. Perhaps it's a wider strategy of fully expecting to get knocked back on this issue, so using it as leverage elsewhere.
It's crazy that Whitehall isn't taking the underground option seriously. If it's possible for Brussels, Antwerp and Rotterdam, it should work for Manchester.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
I think your summary of the history is correct. Advocating for a wholly or partially underground station is guaranteed to be unsuccessful with the DfT/NPR/HS2. Perhaps it's a wider strategy of fully expecting to get knocked back on this issue, so using it as leverage elsewhere.
Leverage seems to be the key, I reckon. The question is for what? Perhaps investment in an underground metrolink line or simply as a tool to ensure what is planned comes to fruition.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,665
Location
Nottingham
Leverage seems to be the key, I reckon. The question is for what? Perhaps investment in an underground metrolink line or simply as a tool to ensure what is planned comes to fruition.
It could easily backfire - if the government gets cold feet about the cost they could just tell Manchester they'll put it on the back burner for a decade while they design an underground station. Look what happened to Sheffield when they insisted on a service to the city centre.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
It could easily backfire - if the government gets cold feet about the cost they could just tell Manchester they'll put it on the back burner for a decade while they design an underground station. Look what happened to Sheffield when they insisted on a service to the city centre.
They'd need to get cold feet for the whole of the phase 2b West project in that case, but in doing so it makes a white elephant of the whole of HS2.

However there was a response from GMCA and my impression was that it was not petitioning against the surface station, but rather making more of a case for the demolition of gateway House. Only my interpretation though.
 

CdBrux

Member
Joined
4 Mar 2014
Messages
923
Location
Munich
Leverage seems to be the key, I reckon. The question is for what? Perhaps investment in an underground metrolink line or simply as a tool to ensure what is planned comes to fruition.
It's in part being used to say to northern voters that if it was in the south it would be done no question and it's proof the government don't like northerners and the self styled 'King of the North' is on their side...
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
It's in part being used to say to northern voters that if it was in the south it would be done no question and it's proof the government don't like northerners and the self styled 'King of the North' is on their side...
That too. Maybe moreso that perhaps, given the lack of similar noise from a Conservative mayor in the West Midlands. Nobody there is shouting about land take on what is a larger station.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,333
Location
Nottingham
Nobody there is shouting about land take on what is a larger station.
Isn't it more about the double height viaduct that will be needed to the East of Piccadilly that will cut off great areas of East Manchester from each other? When you consider how much care was taken not build such a barrier in London, North of Euston, I think he's got a point
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,034
Location
UK
Was there great care taken? Or is the geography more compatible?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,333
Location
Nottingham
Was there great care taken? Or is the geography more compatible?
In the early days of the HS2 project, they discarded certain station layouts (such as a two level station, AIUI) at Euston because the resulting viaduct would bisect Camden.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
Isn't it more about the double height viaduct that will be needed to the East of Piccadilly that will cut off great areas of East Manchester from each other? When you consider how much care was taken not build such a barrier in London, North of Euston, I think he's got a point
The station will be at the same height as the current station, so I’m unsure how it can be considered to be double height. And it won’t cut off huge areas of east Manchester from each other - where has this fallacy really come from? Viaducts are still permeable too.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
It's crazy that Whitehall isn't taking the underground option seriously. If it's possible for Brussels, Antwerp and Rotterdam, it should work for Manchester.

it’s crazy that anyone thinks an underground station would be preferable.

Much more expensive, would add at least 5 years to the project, probably twice that, and for no discernible benefit compared to what will be built.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
it’s crazy that anyone thinks an underground station would be preferable.

Much more expensive, would add at least 5 years to the project, probably twice that, and for no discernible benefit compared to what will be built.
This. I find getting advocates for an underground station to identify the benefits to be almost as hard as getting someone to tell me the benefits of brexit.

If anyone can give specific benefits of an underground HS2/NPR station in Manchester, I’d love to hear them. Someone convince me that my opinion that a surface 6-platform terminus station is the best approach, is actually incorrect.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
I can't really make sense of the HS2 2b plans with regards the Leeds line provisional allowances. Do I have it right that the "Manchester to Leeds junction" marker points to the Eastbound line only which would run along the top of the "box" in one direction and land in the middle of the HS2 running lines just before the station S&C in the other? Then the Westbound would do the same, but inside the "box"?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I can't really make sense of the HS2 2b plans with regards the Leeds line provisional allowances. Do I have it right that the "Manchester to Leeds junction" marker points to the Eastbound line only which would run along the top of the "box" in one direction and land in the middle of the HS2 running lines just before the station S&C in the other? Then the Westbound would do the same, but inside the "box"?
Delete "in the middle of" from your description.

HS2 trains terminating at Manchester would approach and leave through the box and use middle platforms at Piccadilly High Speed.

Trains from Birmingham or Liverpool to Leeds, reversing at Manchester, would approach on HS2 through the box, use southern platforms at Piccadilly High Speed, leave on the southernmost track, and go over the box on the way out, crossing over to the north side of the line towards Leeds.

Trains from Leeds to Liverpool or Birmingham, reversing at Manchester, would approach on the southern track from Leeds, go through the box alongside HS2, into platforms on the north side of Piccadilly High Speed, and then go through the box on their way out onto HS2.

I've seen diagrams and will try to find one for you, but I often have trouble navigating the jungle of HS2 documents.

Edit: See figure 4 in this document:


It's on page 28 as shown by the document's internal page numbering, or page 31 as shown by the PDF reader in my browser. It's looking from the east towards Piccadilly. The words "eastbound" and "westbound" are swapped in the key to the diagram! Green is really towards Leeds and red is from Leeds.
 
Last edited:

adamedwards

Member
Joined
4 Apr 2016
Messages
796
Having seen the image of what is planned, this is a bit like the way the Southeastern Javilins leave St Pancras on the CTRL relief line and then cross under the UP CTRL to reach the Down CTRL.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
Trains from Birmingham or Liverpool to Leeds, reversing at Manchester, would approach on HS2 through the box, use southern platforms at Piccadilly High Speed, leave on the southernmost track, and go over the box on the way out, crossing over to the north side of the line towards Leeds.

Trains from Leeds to Liverpool or Birmingham, reversing at Manchester, would approach on the southern track from Leeds, go through the box alongside HS2, into platforms on the north side of Piccadilly High Speed, and then go through the box on their way out onto HS2.
Perfect, thank you. I didn't bother reading the environmental statements as I would never expect them to contain this sort of information!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
Thank you for that. That's really helpful to understand what's going on. I had understood that the line towards Leeds was going to occupy a bigger structure than that.
I think they risk alienating people unnecessarily by using exaggerated names for things. When I saw “box” I immediately thought Stratford International, or Old Oak Common. Why not just say flyover?
 

bnc2018

Member
Joined
14 May 2021
Messages
51
Location
Banbury, Oxfordshire
I think they risk alienating people unnecessarily by using exaggerated names for things. When I saw “box” I immediately thought Stratford International, or Old Oak Common. Why not just say flyover?
I believe its because 'box' refers to two different types of structures. One is a station box, which creates a box-shaped underground structure for a station, whereas the box that's being referred to here is a way of building bridges that are very skewed, like here. The beams are placed at a right angle to the thing being crossed and that ends up creating effectively a box shaped tunnel, like the replacement for the flyover at Bletchley.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
I think they risk alienating people unnecessarily by using exaggerated names for things. When I saw “box” I immediately thought Stratford International, or Old Oak Common. Why not just say flyover?
It's more akin to the Bermondsey or Werrington dive-unders surely?

Physically it is a concrete box, and in the absence of the start of construction for NPR that's all it will be. It's obviously not going to be the size of a station box.
 