• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

HS2 Consolation Prizes No Longer Speculation

Status
Not open for further replies.

JohnElliott

Member
Joined
15 Sep 2014
Messages
275
Undoubtedly some interesting ideas announced. Looks like further electrification of trans-pennine as an example.

Mentions train line reopenings in the North, although none are actually mentioned by name (Ivanhoe line is mentioned for ) so would want to know what lines they're committing to.

Similarly with the rather nebulous "rail improvements in the SW" mentioned (would have been a good opportunity to mention Tavistock).

The Government would have been in a stronger position with this announcement if it had made some attempt to run the existing railway over the past couple of years.
There is a page on gov.uk giving the full list of projects: https://www.gov.uk/government/news/find-out-about-every-new-transport-project-in-your-region

They include:
  • Reopening stations: Communities in the North East will be reconnected, including a new station at Ferryhill, Co Durham. The Leamside line, closed in 1964, will also be reopened.
  • Reopening train lines: Communities will be reconnected, including through the restoration of the Don Valley Line between Stocksbridge and Sheffield Victoria, and new stations at Haxby Station, near York, Waverley, near Rotherham, and the Don Valley Line from Sheffield to Stocksbridge.
  • Opening more railway lines: between Cullompton and Wellington.
  • A new station built at Tavistock: connecting it with Plymouth. Plus, five miles of track will be reinstated.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Arkeeos

Member
Joined
18 May 2022
Messages
293
Location
Nottinghamshire
This is unfortunately not a serious document, there is likely a poor business case for much of the reopening's, and they are uncosted and have no timescales. Liverpool Manchester Leeds connection doesn't even seem worth to give a moment of time because there just isnt anything there. Is someone seriously going to tell me that reopening the Don Valley line will have a better business case than phase 2a, really?
 
Last edited:

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,330
Location
Nottingham

West Midlands​

  • Reopening closed Beeching lines: including the Stoke to Leek line
Sunak is going to get torn to shreds if a properly briefed journalist gets the chance to interview him on these promises.
 

NoOldEngine

Member
Joined
29 Jun 2020
Messages
22
Location
Leeds
This is unfortunately not a serious document, there is likely a poor business case for much of the reopening's, and they are uncosted and have no timescales. Liverpool Manchester Leeds connection doesn't even seem worth to give a moment of time because there just isnt anything there. Is someone seriously going to tell me that reopening the Don Valley line will have a better business case than phase 2a, really?

Probably just remodel the railway lines at Leeds and Piccadilly stations. Nothing else will happen. Don't expect anything new like additional lines or even stations.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Given that TPRU is now expected to top £11bn, that should provide some frame for reference of how much to expect for the various schemes.
 

stibz

Member
Joined
7 May 2014
Messages
83
Hi, On the subject of HS2 all the toubles come as no surprise, we can't do infrastructure at a decent cost in the uk.. anyone listened to this report
 

Arkeeos

Member
Joined
18 May 2022
Messages
293
Location
Nottinghamshire
Hi, On the subject of HS2 all the toubles come as no surprise, we can't do infrastructure at a decent cost in the uk.. anyone listened to this report
It basically just repeats some allegations that have already been addressed, there’s not much of worth in it.
 
Status
Not open for further replies.

Top