Do they? And your missing the point anyway - the issue isn't Great Yarmouth, it's Maglev's inability to serve towns or even cities which don't justify the building of a new line to them either initially or longer term.
Not with a single seat service, no.
But with the cross platform interchanges that people on this forum are always going on about, it can serve as wide a set of destinations as conventional HSR and do it faster.
As far as im aware it isn't any cheaper than conventional HSR and even if it was, you'd lose those savings having to build a larger network. Maglev might be faster but that does not make it better, especially when the core reason for building high speed lines in this country is to relieve the existing network.
Chris
The core reason for building high speed lines in this country is to provide connections between a very small number of points, such as London to Manchester/Birmingham/Leeds.
The much vaunted "classic compatible" services are just political point-scoring by HS2 Ltd in an attempt to spread the appeal of the service.
They are almost certainly not going to be viable without swingeing cuts to the normal classic services which would never be tolerated.
High speed rail can't serve places like Rugby, Coventry and Leicester because they don't justify lines connecting to them.
I also have to question where on earth the capacity on the northern main lines is going to come from to support all these duplicate services that they talk about running. (Especially since they love promising freight paths and new local train paths to everyone, which they can't possibly provide)
Either the southern ECML and WCML have to become a commuter line or they are going to have to spend billions on upgrades, upgrades that should be included in the price of the project if they include classic compatible trains in the specification. (And note I am not some Anti-HS2 person, I am broadly pro HS2 but I don't like people weaseling with figures).
I absolutely agree. I'd say suppliment the existing network, but that's a question of semantics. If we were starting from scratch (say Lunar Railways) then I'd start with a maglev, but we aren't.
The vast majority of the traffic on high speed lines in this country will be entirely on high speed metals (as HS2 will not use conventional tracks anywhere on the 'Y').
This rather removes the often cited network effect.
And since there is no need for interworking between the Norwich-London line and the rest of the network (since it doesn't happen) then there is little to be lost in building a testbed route to get actual data rather than subjective statements.
The potential journey time reductions surely make it an option that has to be seriously considered (less than half an hour to Norwich even with a couple of stops if you don't divert the line to serve Diss/Stowmarket), not dismissed almost out of hand in a report by the government in 2007.