• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

How long will the Class 158 & 159 soldier on for?

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,522
Location
Taunton or Kent
There is no reason not to use BEMUs for lines with a top speed of 85 or 110 or any other top speed.

New diesel units should not be considered. The current cheap railway diesel will not be available forever. New 3rd rail doesn't strike me as a good idea either.

For Waterloo-Exeter services, the solution (in my view) is to install OHLE around Exeter, and use this combined with the existing 3rd rail to charge batteries for the remaining section. The OHLE around Exeter can also be used by the existing 80x services and to charge BEMUs used on the other lines from Exeter, giving more benefit for the infrastructure investment.
I'd add another such OHLE island through Salisbury, which both ensures a mid-journey top-up for Waterloo-Exeter trains and can feed BEMUs on the Cardiff-Portsmouth route as well.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RealTrains07

Established Member
Joined
28 Feb 2019
Messages
1,905
SWR should have done the 158s and 159s refurbishment years ago, whats the point of doing it now when the both fleets realistically will be going in the next 5 - 10 years.
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
SWR should have done the 158s and 159s refurbishment years ago, whats the point of doing it now when the both fleets realistically will be going in the next 5 - 10 years.
Well if it's 10 years then it's worth doing.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,192
Location
West Wiltshire
Well if it's 10 years then it's worth doing.
Thats only partly true

If start the refurb and find extra work such as corrosion repairs, then it changes the equation of repair or replace.

Take as an example, if look at it, and think only got 2-4 years before major work needed. Then think what happens if actually do major work eg replace corroded sections or have to buy new engines because current ones won't last another 10 years. But also realise repaired lifespan might only be about 7-8 years (by time actual do the train), so might be poor value spending a fortune to give only few extra years use.

And thats if it is actually possible to do corrosion repairs on a part steel, part aluminium train at an economic price, and retain structural integrity. If it becomes so complicated or specialist task doing it, and also doing a refurb, then might be say third of cost of a new train.

In blunt terms it is cost of corrosion work, buying parts for engines to keep them running for 7-10 years, and refurbishing for another 7-10 years usage versus not doing the work and expediting replacements.

Although I am not familiar with proposed refurb, I have heard stories that one has been taken for appraisal and work needed has turned out to be far more extensive (and presumably expensive) than expected. So much extra needs doing to extend life, that work has been halted as uneconomic. Maybe someone else can advise if a unit is actually on hold instead of refurb progressing.
 

Tetragon213

Member
Joined
14 Oct 2024
Messages
699
Location
West Midlands
SWR should have done the 158s and 159s refurbishment years ago, whats the point of doing it now when the both fleets realistically will be going in the next 5 - 10 years.
Strangely, I think the existing interior design is actually just fine on the 159s. While yes, the legroom is a smidge lacking, the seats are still extremely comfortable (far more comfortable than the torture racks provided on modern units), and the number of luggage racks are in keeping with the amount of luggage that gets stored on board.

It's actually quite extraordinary how well the interiors are holding up, even on the oldest SWT ones, after all this time.

If the mechanics were better looked after, I could see these things going on for as long as the HSTs.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,192
Location
West Wiltshire
SWR have issued a tender for 3 years, September 2026 - September 2029 to provide spares, including engines and bogies for 158 & 159, value upto £70m

1 buyer​

Description​

Provision of Spare parts and train engines for trains (SMA Bogies - Class 158/159)

CPV Codes​

  • 34300000 - Parts and accessories for vehicles and their engines
  • 34600000 - Railway and tramway locomotives and rolling stock and associated parts

Indicators​

  • Renewals are available.

If they are considering having to spend nearly £1m per vehicle for parts in just 3 years, then have to wonder about the economics of not replacing them at current time. At that rate will be spending upto £4m per vehicle over 13 years.

£4m per vehicle is getting close to a new vehicle cost, which would have a design life of nearer 35-45 years, so 3 times as long.

So I do wonder about the whole life equivalent cost of continuing to patch up its old diesel fleet that were built 33-37 years ago, rather than replacing them before too many parts wear out completely.
 

swrcommguard

Member
Joined
22 Feb 2024
Messages
27
Location
Salisbury
Are they? Reliability is not what it once was but they’re hardly 180s. The onboard environment of a Northern 150 is totally different to a 159.
The problem is a reliance on ****ty reconditioned engines that fail all too regularly and a lack of spare parts - some components now have to be hand made.

There are lengthy periods when up to a third of the West of England fleet is up on blocks. Just look at the number of short formations over the last few weeks - 18 carriages down on Mobday and 13 on Tuesday.

So while I am not criticising these units historic reliability, unfortunately they can no longer be relied on.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,606
SWR have issued a tender for 3 years, September 2026 - September 2029 to provide spares, including engines and bogies for 158 & 159, value upto £70m



If they are considering having to spend nearly £1m per vehicle for parts in just 3 years, then have to wonder about the economics of not replacing them at current time. At that rate will be spending upto £4m per vehicle over 13 years.

£4m per vehicle is getting close to a new vehicle cost, which would have a design life of nearer 35-45 years, so 3 times as long.

So I do wonder about the whole life equivalent cost of continuing to patch up its old diesel fleet that were built 33-37 years ago, rather than replacing them before too many parts wear out completely.
I read it as the tender value being in the category of between £0 and £70m, not that the value was £70m!
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,389
Location
Yorks
The third rail 'islands' plan has bitten the dust. The national grid also kyboshed the plan when they were approached by NR.

The solution will have to be more diesels or a bi-mode that can use the 3rd rail between Waterloo and Worting Junction and then switch to diesel.

If diesel only, it's possible that they will stop going all the way to Waterloo and may terminate/turn at Woking (due to London clean air legislation).

I have heard talk of plans to change the xx.47 Salisbury to Waterloo stoppers to Yeovil to Reading services (probably from Dec 2027 or poss May 2028)

Nearly all Salisbury crew now sign Basingstoke to Reading and Yeovil depot will be learning it, too.

That all sounds very unsatisfactory. Through services to London need to be maintained somehow.
 

Tetragon213

Member
Joined
14 Oct 2024
Messages
699
Location
West Midlands
A brief look at an old document from TfW's order of units...

1779972101325.png
Looking purely at the Class 231 order, it looks to be approx £7.5mil per unit. Let's extrapolate that to 38 units (8 Class 158s + 29 Class 159s in their current fleet, plus 1 that was written off during Salisbury Tunnel Jn), and you're looking at about £284 million. I think there should be some serious consideration of new Stadler FLIRTs for the WoEML.

Strictly theoretically, if you took the Class 756 order, transferred across the approx. £2mil from Sim/Mock up prices to the 756 cost, then divided that by the number of units (24), then multiply that across to 38 units, and finally multiply by 1.073 (to account for the 7.3% inflationary rise between 2023 and now), you get about £340 million. Surely it's not impossible to install a DC-AC invertor and a step up transformer from 750 to 25k? (edit due to maths error)
 
Last edited:

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,788
Location
SW London
A brief look at an old document from TfW's order of units...

Surely it's not impossible to install a DC-AC invertor and a step up transformer from 750 to 25k? (edit due to maths error)
Why would you need to do that? As i understand it any unit taking an AC supply - even one using AC motors suich as a FLIRT - has to rectify it to DC to remove the 50Hz carrier before generating the variable frequency AC needed for traction.

So why convert a DC supply from the live rail to AC, only to convert it straight back to DC again?
 

Tetragon213

Member
Joined
14 Oct 2024
Messages
699
Location
West Midlands
Why would you need to do that? As i understand it any unit taking an AC supply - even one using AC motors suich as a FLIRT - has to rectify it to DC to remove the 50Hz carrier before generating the variable frequency AC needed for traction.

So why convert a DC supply from the live rail to AC, only to convert it straight back to DC again?
Every day's a school day! Never knew the current was converted into DC and then back into AC!

Regardless, that should mean that converting a Class 756 to run on 3rd Rail actually a bit easier potentially. For £350 million ish, that's a decent way to a) get some new rolling that that is actually quite liked, and b) take advantage of the existing 3rd rail supply to Worting Junction.

Imo they'd be best off electrifying with batteries down to Exeter via Salisbury. You get lower capital costs involved than building OLE/3rd rail, the whining NIMBY brigade of Salisbury won't get their proverbial underpants in a twist, and you can still keep the diesels on board for redundancy. Hopefully, in this theoretical world where they do this, they can also look into re-doubling the line to Exeter, as I do think there's untapped potential for getting traffic off the congested A303 via the WoEML.
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,194
Regardless, that should mean that converting a Class 756 to run on 3rd Rail actually a bit easier potentially. For £350 million ish, that's a decent way to a) get some new rolling that that is actually quite liked, and b) take advantage of the existing 3rd rail supply to Worting Junction.
Do you mean converting the existing TfW units to add third rail pickup - and presumably moving them on to SWR - or new build?
 

Tetragon213

Member
Joined
14 Oct 2024
Messages
699
Location
West Midlands
Do you mean converting the existing TfW units to add third rail pickup - and presumably moving them on to SWR - or new build?
New build, I was thinking. A fleet of Class 756 units with the pantograph and 25kV equipment replaced with the equipment required for compatibility with Third Rail DC and maybe battery chargers west of Worting Junction.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,272
A brief look at an old document from TfW's order of units...

View attachment 204948
Looking purely at the Class 231 order, it looks to be approx £7.5mil per unit. Let's extrapolate that to 38 units (8 Class 158s + 29 Class 159s in their current fleet, plus 1 that was written off during Salisbury Tunnel Jn), and you're looking at about £284 million. I think there should be some serious consideration of new Stadler FLIRTs for the WoEML.

Strictly theoretically, if you took the Class 756 order, transferred across the approx. £2mil from Sim/Mock up prices to the 756 cost, then divided that by the number of units (24), then multiply that across to 38 units, and finally multiply by 1.073 (to account for the 7.3% inflationary rise between 2023 and now), you get about £340 million. Surely it's not impossible to install a DC-AC invertor and a step up transformer from 750 to 25k? (edit due to maths error)

The TfW numbers don’t translate because they are just the purchase price of the initial spares, not the annual cost of consumable spares nor the annual cost of repairable items.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,299
Location
Paignton
Likely to be off to the North East for Northern once released to boost capacity, and releasing 156s back to Newton Heath to boost capacity in the West.
Why go to Landore? Looking at it; it is only running as required so probably will not.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,299
Location
Paignton
Scrap metal, perhaps? I've seen tale that the 158s have been vulnerable to corrosion (as SWR are finding out trying to refurbish their own fleet)...
Bristol will get the Exeter 158s when the 175s prove reliable. Bristol might want some TFWs 158s as well to strengthen services there. which badly need it.
 

DS25

Member
Joined
30 Jul 2024
Messages
121
Location
UK
Scrap metal, perhaps? I've seen tale that the 158s have been vulnerable to corrosion (as SWR are finding out trying to refurbish their own fleet)...
Northern or GWR, or TfW may want to keep them for a bit longer on a different route?
 

Sporty60

Member
Joined
5 Aug 2019
Messages
89
Corrosion and spare parts aside these are great for me on the Devon Metro and Exeter to Waterloo services.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,522
Location
Taunton or Kent
If GWR, SWR and Northern all get their respective fleet order's approved before TfW's 158s go off-lease, at best I think they will be parts' donors to keep the other 158s going while the new fleets are in production. The exist of ETCS kit and the time taken to properly incorporate a cascaded fleet, even where existing classmates are already in use, will not make their introduction into service elsewhere worthwhile.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,439
Location
Somerset
Why does the little voice inside my head say “until about 9 months before any of their replacements are ready “?!
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,194
If GWR, SWR and Northern all get their respective fleet order's approved before TfW's 158s go off-lease, at best I think they will be parts' donors to keep the other 158s going while the new fleets are in production. The exist of ETCS kit and the time taken to properly incorporate a cascaded fleet, even where existing classmates are already in use, will not make their introduction into service elsewhere worthwhile.
Unless memory fails me, Phase 1 of Northern's Class 780 / 781 will be replacing Class 150, Class 155, Class 156 and Class 769 only. Phase 2 will be needed to see off the Class 158s.
 

RUK

Member
Joined
5 Aug 2009
Messages
481
Location
East of England
As far as I am aware, new replacement rolling stock procurement has started for Northern, GWR, Chiltern, and TfW to replace their Sprinters, Super Sprinters, and Networker Turbos, but there are no current plans for EMR’s Class 158s, which are of a similar age, to be replaced. When do you think this will happen?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
In a fairly recent magazine interview with EMRs MD it was mentioned sometime in the early 2030s for the 158s and why that fleet was only being refreshed rather than refurbished. He wouldn’t be drawn on whether their replacement would be new build or a cascade as obviously he has no idea.
 

Top