What would 6 x 165 have done in the SW area (I assume those are 3 x 2 car). The Romsey line was RR at the time wasn't it?
Reading-Basingstoke was main one, but until the Solent lines were electrified in 1990, the DEMUs (and some 33/1 + 4TC) did some odd first train and late evening workings too.
From memory there were workings in early 1990s to Woking, Eastleigh etc, possibly to allow power to be off for few hours overnight if required.
Going back to the main thread topic, the youngest of the 158, 159, 165, 166 fleet is now 33 years old, and some are now around 37 years old. An aluminium bodied carriage on a steel underframe is not the easiest type to weld in a bit if it is rusting, even harder if got corroded aluminium joined to steel.
It is already proving difficult to source enough spares to keep the whole fleet going. Can probably keep 90-93% of each fleet going 4 or 5 years (with others as spare parts donors).
I suspect the overhauls and maintenance costs are already close to point where adding in extra repairs for life extension is worst financially (on a 30-35 whole life basis) than replacing them asap. Actually I would not be surprised if already beyond that point and the cost of not being able to withdraw a few for spares (which can't yet be done due to lack of alternatives for each line) is making keeping 100% in service a very expensive short term option.