• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

How are speed limits set?

Status
Not open for further replies.

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Speed limits around bends are set for passenger comfort. Hence when BR resarch showed that it was possible for trains to go 40% faster round the bends without risk of derailment, they proposed the Advanced Passenger Train with tilt so that it could go 40% faster round the bends.

Technically that's cant deficiency ( the APT showed you don't want 0 cant deficiency because it made people a bit uncomfortable ). There's RSSB documents defining limits & discussing the matter, as usual.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ptreanor

Member
Joined
2 May 2017
Messages
45
Location
Exeter
How long the blocks are , are based on the speed/stopping distance are they not?
That's one of factors.

== Doublepost prevention - post automatically merged: ==

What comes first? Do we say "we want a 100mph railway, design the signals to cope with it" Or do we say "This is where the signals are, how fast can we go?"
Both of these factors are taken into account. The distance between the first caution (yellow) aspect and the associated stop signal should not be less than service (normal) braking distance.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Not impossible to calculate. Just have two scales, one without cant and one with various degrees of cant to 4%.
That's great. Now all we need is an Ordnance Survey map that shows the cant of every curve.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Being purile [sic] is unnecessary on this site. The cant levels would be on a gauge not the map.
I'm sorry, but your original question was about the viability of determining the maximum speed over a curve using only a gauge laid on an OS map. You can't determine the maximum speed of a curve without knowing both the radius and the cant.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,621
Not impossible to calculate. Just have two scales, one without cant and one with various degrees of cant to 4%.

… and various degrees of cant deficiency.

(Pedant alert - cant and cant deficiency on the NR network are measured in mm, or degrees, but not %)
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
(Pedant alert - cant and cant deficiency on the NR network are measured in mm, or degrees, but not %)
However, for standard gauge track, degrees of cant (or of CD) is almost the same thing as inches of cant (or of CD), because there are 57.3 degrees in a radian, which is almost the same as the gauge in inches.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
I’ll save you all the OS Pain - it is not accurate enough to calculate an accurate speed (or even indicative speed) in fact the OS grid system is not accurate enough for long track alignments, hence the boffins at UCL created a thing called Snakegrid. Also for the cant pedants above 25mm of cant is approx 1 degree of rotation of the rails across the track gauge! NR do not have an OS Map with the cant of every curve. However NR in Scotland have programme of running trains with vehicle mounted laser scanners, from which the rails are digitised and strung into strings of Digital CAD points - these all can have radii and existing cant extracted for use in speed calculations.
 
Last edited:

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
I'm sorry, but your original question was about the viability of determining the maximum speed over a curve using only a gauge laid on an OS map. You can't determine the maximum speed of a curve without knowing both the radius and the cant.
You can determine the maximum theoretical speed of any curve by using maximum cant and deficiency values.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
You can determine the maximum theoretical speed of any curve by using maximum cant and deficiency values.
The max theoretical speed also depends on material type also (rail type / sleepers / ballast depth)
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,902
Location
North
… and various degrees of cant deficiency.

(Pedant alert - cant and cant deficiency on the NR network are measured in mm, or degrees, but not %)
Yes I knew that. Why I said percentage I don't know.
Is It possible to determine a speed of curve from a map. I asked the original question because the overall linespeed from Leeds to Harrogate has been 60mph for ever even though heritage DMUs would exit out of the bottom of Bramhope tunnel doing 70mph and hold this speed before braking at Pannal for Crimple Jnc.
In the 1970s I rode in the cab of a late running Deltic+8 empty stock move from Neville Hill for a morning Harrogate-London train. We travelled up to Horsforth at over 70(then 45mph psr at Horsforth) and exited Bramhope at over 80mph. The ride was smooth and with no banging flanges
The Leeds-Harrogate line was resignalled in 2013 with more sections and better signal sighting for shorter headways and increased capacity. It was also claimed in the local media that it was signalled for a linespeed of 75mph. Still no hint of an increase in speed.
What I want to know is will the present curvature+cant allow 75mph regardless of past illegal speeds on the route?
 
Last edited:

CEN60

Member
Joined
17 Dec 2018
Messages
299
Yes I knew that. Why I said percentage I don't know.
Is It possible to determine a speed of curve from a map. I asked the original question because the overall linespeed from Leeds to Harrogate has been 60mph for ever even though heritage DMUs would exit out of the bottom of Bramhope tunnel doing 70mph and hold this speed before braking at Pannal for Crimple Jnc.
In the 1970s I rode in the cab of a late running Deltic+8 empty stock move from Neville Hill for a morning Harrogate-London train. We travelled up to Horsforth at over 70(then 45mph psr at Horsforth) and exited Bramhope at over 80mph. The ride was smooth and with no banging flanges
The Leeds-Harrogate line was resignalled in 2013 with more sections and better signal sighting for shorter headways and increased capacity. It was also claimed in the local media that it was signalled for a linespeed of 75mph. Still no hint of an increase in speed.
What I want to know is will the present curvature+cant allow 75mph regardless of past illegal speeds on the route?
After a recent change to the relevant NR Standard unless you know the type and age of rail, sleepers, sleeper spacing, clips etc - you cannot calculate the theoretical maximum speed a curve with a set amount of cant can achieve.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
After a recent change to the relevant NR Standard unless you know the type and age of rail, sleepers, sleeper spacing, clips etc - you cannot calculate the theoretical maximum speed a curve with a set amount of cant can achieve.
However, all those are things that are far easier and cheaper to change than the radius of the curve. Changing the radius of the curve is likely to involve land purchase and statutory processes.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
However, all those are things that are far easier and cheaper to change than the radius of the curve. Changing the radius of the curve is likely to involve land purchase and statutory processes.
Correct - but the issue was calculating speed from a map - my statement still stands - ie a map does not give you all the info you need.
 

Lurcheroo

Established Member
Joined
21 Sep 2021
Messages
1,239
Location
Wales
What comes first? Do we say "we want a 100mph railway, design the signals to cope with it" Or do we say "This is where the signals are, how fast can we go?"

We say the former (and we want this timetable with these trains so make sure it can accommodate that too please).
Out of curiosity, surely if a brand new rail line was being built and it was planned for a certain end to end running time then it would be determined what speeds would need to be achieved and therefore what sort of signal spacing you need to have ‘service breaking distance’, as well as some other factors like wether you have 3 or 4 aspect signalling and signal sighting.

But if you were just looking to improve journey times on an already built line with functional signalling then you use the “this is where the signals are, how fast can we go” method ?

Don’t work in signalling at all, just my electrical engineer brains way of thinking so apologies if it’s totally off!
 

CarrotPie

On Moderation
Joined
18 Mar 2021
Messages
1,128
Location
Out of curiosity, surely if a brand new rail line was being built and it was planned for a certain end to end running time then it would be determined what speeds would need to be achieved and therefore what sort of signal spacing you need to have ‘service breaking distance’, as well as some other factors like wether you have 3 or 4 aspect signalling and signal sighting.

But if you were just looking to improve journey times on an already built line with functional signalling then you use the “this is where the signals are, how fast can we go” method ?

Don’t work in signalling at all, just my electrical engineer brains way of thinking so apologies if it’s totally off!
Essentially, yes, unless there's unless money around to change that (or, more likely, remodel junctions and stations to achieve a similar effect).
 

Lurcheroo

Established Member
Joined
21 Sep 2021
Messages
1,239
Location
Wales
Essentially, yes, unless there's unless money around to change that (or, more likely, remodel junctions and stations to achieve a similar effect).
Ahh ok that’s cool ! Yeah of course, kind of forgot that it’s possible to re-signal an area if it’s needed as part of the improvements haha !
Thanks for the info :D
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,902
Location
North
After a recent change to the relevant NR Standard unless you know the type and age of rail, sleepers, sleeper spacing, clips etc - you cannot calculate the theoretical maximum speed a curve with a set amount of cant can achieve.
The majority of the line between Horsforth and Harrogate was relaid with cwr on concrete sleepers between 1970-1976 when I was a daily commuter. As Harrogate-London trains are no longer loco-hauled and other services predominantly DMU operated, I presume stress and wear on the rail is much less on curves than it was so curving speed could be higher on current track. Is that logical?
 
Last edited:

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,792
Location
West is best
Ahh ok that’s cool ! Yeah of course, kind of forgot that it’s possible to re-signal an area if it’s needed as part of the improvements haha !
Thanks for the info :D
In many cases, the documentation for the signalling system already has enough information for the maximum speed to be calculated.

For lines that existed before colour light signalling was installed, the speed is determined by money. As in the amount of investment that was used to build the line, the cost of on going maintenance and the type of trains using the line (no point designing, building and maintaining a line for 110MPH if the fastest trains normally using it are limited to 75MPH).

Lines with higher speeds cost more in both design of the permanent way and the cost of on going maintenance.

So for existing lines, the signalling is designed for the current requirements within the limits of the permanent way and taking certain other things into account (e.g. junctions, terminal or complex stations). The signal spacing and type (two aspect, three aspect, four aspect) is also determined by the type of train (stopping services, fast/express services, high speed services, freight) and how many trains per hour have been specified for that section of line.

There are solutions for signals that may have insufficient sighting distance (banner signals for example). Although an alternative signal position may also be considered, as there may be some "wiggle room".

For new lines, then yes, the requirements will be determined for what is required to meet the specification. Both the permanent way and the signalling will be designed to meet the specification.

Just as the cost of the permanent way is affected by the specified line speed, the cost of the signalling is also partly determined by the line speed. However, the required line capacity (trains per hour) has a bigger effect on costs. You can have a 125MPH line using two aspect signalling. You can't have an intensive commuter line with two aspect signalling if that line is also a high speed line or it has mixed traffic...

When a line or area is resignalled, again, cost is a major factor. A lower cost scheme will often reuse existing signals/structures/signal positions. A more expensive scheme may completely redesign the signal spacing and signal positions. Especially if work is being done to raise line speeds.
 

John Smith 19

On Moderation
Joined
13 Aug 2023
Messages
6
Newby here. One of the members has mentioned that 80 or more factors are used to set a speed limit and I just wondered is there anywhere they are actually listed?
Also does the list of factors consider lengthen as the speed rises? So I know over 100mph you have to move safety cabins further away from the line and IIRC anything over 125 requires in cab signalling. I'm wondering if there's a baseline list then a series of "contours" that lengthens it as the speed rises.
The other thing I wonder about is whether there is a formal system that reviews speed limits. With about 10 000 miles of track there's got to be a lot speed restrictions to track. It seems way to big a job for a spreadsheet. I read that the Birmingham/Manchester track distance is 80m65ch and the average journey time is 1:39. That's just under 49mph, yet all the trains that run it can hit 125mph. What's going on? High speed rail is nice, but why can't we have full speed rail in the meantime?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,287
Location
Glasgow
That's just under 49mph, yet all the trains that run it can hit 125mph.
Just because they can achieve 125mph doesn't mean they can run at 125mph though. The exit from Birmingham New Street and the line on to Wolverhampton in particular isn't very fast.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,078
Location
Wilmslow
I read that the Birmingham/Manchester track distance is 80m65ch and the average journey time is 1:39. That's just under 49mph, yet all the trains that run it can hit 125mph. What's going on? High speed rail is nice, but why can't we have full speed rail in the meantime?
HS2 is the solution, but Rishi didn't think it was necessary so he cancelled it.

More realistically, Birmingham-Manchester has too many station calls and too many speed restrictions along the route. And it's not sensitive to the time it takes - if you eliminate the station stops you get fewer passengers because they're well used and few people care about the end-to-end journey time, which still compares well with the road journey. Marginal improvements have been made over time, so it's no longer 85mph maximum Stafford-Cheadle Hulme as it was in the 1970s, but having some parts of that route capable of 100mph makes little difference.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,621
One of the members has mentioned that 80 or more factors are used to set a speed limit and I just wondered is there anywhere they are actually listed?

There is a Railway Standard on the subject. It lists the factors,with the proviso ‘this is not an exclusive list’


Also does the list of factors consider lengthen as the speed rises?

Sort of, in that some issues only kick in at certain speeds, however you will still need to demonstrate that the risk is managed. For example, raising the speed through a platform you would need to demonstrate that any additional risk to waiting passengers is mitigated, and depending on what is on the platform you may need to do aerodynamic assessments. If it is on a curve, it would need gauging checks for the new kinematic envelope. If the proposed new linespeed is over 125mph, the platform can not be open to passengers while trains pass, and you would have to demonstarate how that would be achieved.


The other thing I wonder about is whether there is a formal system that reviews speed limits.

Each speed restriction is reviewed on a case by case basis as and when someone decides to look at it for a business reason.
 

John Smith 19

On Moderation
Joined
13 Aug 2023
Messages
6
Just because they can achieve 125mph doesn't mean they can run at 125mph though. The exit from Birmingham New Street and the line on to Wolverhampton in particular isn't very fast.
My point exactly. Drivers I've spoken to at New Street say there's a different speed limit leaving every platform.

This seems to me to be a circular argument. "The line cannot support faster trains so we need faster trains running on a new line." New rolling stock can take years to get authorised and more years to get built. It's not like we don't know how to speed up a line.

I can't shake the feeling that there does not seem to be much "joined up" thinking going on.

== Doublepost prevention - post automatically merged: ==

There is a Railway Standard on the subject. It lists the factors,with the proviso ‘this is not an exclusive list’

Interesting. OK interesting to me. Do you have it's name or number? Could I find it on the RSSB website?


Sort of, in that some issues only kick in at certain speeds, however you will still need to demonstrate that the risk is managed. For example, raising the speed through a platform you would need to demonstrate that any additional risk to waiting passengers is mitigated, and depending on what is on the platform you may need to do aerodynamic assessments. If it is on a curve, it would need gauging checks for the new kinematic envelope. If the proposed new linespeed is over 125mph, the platform can not be open to passengers while trains pass, and you would have to demonstarate how that would be achieved.
Thought that might be the case. 100mph seems to be the point at which all sorts of stuff has be re-considered. It's just that average line speed is so far below what the existing rolling stock can manage. Yes I know a lot of the network shares lines between freight and passengers. But various reports from Lithuania Railways and the Germans reckon a key parameter here is raising the speed of the slowest train on the line.
AIUI top speed on freight hasn't been reviewed since the late 60's, following a single train derailment when a freight with unsprung cars and caboose/locomotive braking only derailed. This is (AIUI) still common in the US but was phased by the mid 80's at the very latest. No UK freight has run like that in close to 40 years.
If that's right then a key reason for that top speed no longer exists, and hasn't for quite a while.
Each speed restriction is reviewed on a case by case basis as and when someone decides to look at it for a business reason.
So hypothetically there could speed restrictions that have not been reviewed for decades, regardless of the improvements in brake technology over the decades?
 
Last edited:

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
This seems to me to be a circular argument. "The line cannot support faster trains so we need faster trains running on a new line." New rolling stock can take years to get authorised and more years to get built. It's not like we don't know how to speed up a line.
We do, and (for example) Eastern Region knew how back in the 70s, but I'm not really sure what your point is.
It's just that average line speed is so far below what the existing rolling stock can manage.
If you're referring to Birmingham-Manchester again, by the time you've made 5 stops and got through the Birmingham-Wolverhampton section that's added 25mim to a theoretical nonstop time. Then there's awkward restrictions at Stafford, Stone, Congleton and Cheadle Hulme... there was another at Norton Bridge but NR spent a vast amount to improve the junction there.
Yes I know a lot of the network shares lines between freight and passengers. But various reports from Lithuania Railways and the Germans reckon a key parameter here is raising the speed of the slowest train on the line.
Agreed - so a 75mph freight and a stopping passenger maintain similar times.
AIUI top speed on freight hasn't been reviewed since the late 60's, following a single train derailment when a freight with unsprung cars and caboose/locomotive braking only derailed.
I think you have misunderstood. The 60s issues were about short-wheelbase 4-wheel wagons, which (among other things) didn't take kindly to continuous welded rail and to higher speeds. A great deal of work went into producing freight stock that would perform well at 75mph (leading BTW to the Pacer railbus!).

No UK freight has run like that in close to 40 years. If that's right then a key reason for that top speed no longer exists, and hasn't for quite a while.
And no (?) UK freight is timed for anything less than 60mph, while intermodals are 75mph typically.
So hypothetically there could speed restrictions that have not been reviewed for decades, regardless of the improvements in brake technology over the decades?
Not sure brake technology is the issue so much as vehicle performance.

And the freight operators would be pushing for limits to be relaxed if there was an engineering and business case. And for better pathing so they didn't sit in loops for hours. But rebuilding junctions or whole sections of line for higher speed is expensive and disruptive - hence the idea of building new lines....

PS welcome to the forum!
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,621
My point exactly. Drivers I've spoken to at New Street say there's a different speed limit leaving every platform.

The drivers you are speaking to are either winding you up, or not competent. The speed on departure from every platform at Birmingham New St is 10mph, and has been for over half a century.

== Doublepost prevention - post automatically merged: ==

So hypothetically there could speed restrictions that have not been reviewed for decades, regardless of the improvements in brake technology over the decades?

If rolling stock with different braking characteristics is used on a line, and the operator has requested it, the linespeeds will have been reviewed.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,126
West of Swansea, line speeds seem to be on the slow side - maximum of 75mph I think - even on straight sections such as Cockett to Llanelli and Carmarthen to Whitland.
 
Status
Not open for further replies.

Top