Another weekend and more progress.
At Bamford the eastbound turnout went in just outside the station.
At Dore the new bridge spanning the River Sheaf alongside Abbeydale Industrial Hamlet was in by 6 am on Sunday morning. (It should have gone in last November.) Hard to get a picture so these two are long distance shots from Abbey Lane road bridge and Beauchief Gardens.
View attachment 128942 View attachment 128943
Elsewhere construction of the new Principal Supply Point (PSP) on the railway triangle has started. Details of that are in the Sheffield planning application Ref 22/01767/FUL at;
https://planningapps.sheffield.gov....ils.do?keyVal=RBF02WNYIME00&activeTab=summary Described as follows
"The proposed Dore PSP is required infrastructure to provide new signalling systems, power supply and
equipment storage space to support the wider Hope Valley Capacity Scheme, which received consent
through a Transport and Works Act Order (TWAO) which was made on 18th April 2018 (TWAO reference
(TWA 3/1/4/66)).
View attachment 128944