Very pleased that HS2 has been given the go-ahead. I was in the computer room in English at school, at 3:10, when I found out the news. I was originally on the BBC website to find something for my coursework when I saw it! 
I believe it unlikely that Durham would ever be on the Hs2 route although the staion is well used and there is much demand foir London services. Currently it gets I believe one East Coast service two XC and two TPE services each hour each way. Now if you wanted to access HS2 you could get the train into Newcastle although that is doubling back on yourself if your southbound. Or you could head for Darlington. But these trains cant access both Darlington Bank top and your proposed parkway. So you either have to reduce the running through Bank Top or bring in more local trains which would run to a Teesside Parkway. But then your talking of one or even two local trains per hour running for an appreciable distance along HS2 line,. Unless I miss by guess allowing for slower local trains to join and run and and leave the HS2 line would eat up more space than an actual HS2 train just running along HS2.
Far simpler just to allow the already slowing down stopping HS2 train to run off the HS2 line an into Darlington Bank Top where it can pick up passengers and then rejoin the HS2 line further down. You also save the cost of building and staffing an HS2 parkway station and get more out if an existing asset which you cant get rid of in any normal event.
Looking at the site of Durham Tees Valley airport I am not sure how you would easily combine the runway which runs roughly east west and a not south Darlington Teeside line without needing two stations on the Tesside line, one for the HS2 parkway and another for the airport terminal. You could maybe move the terminal building, but not knowing much about airports and runways not sure how this would d work This might be a moot point as the airport is not doing well and currently only on train a week stops at the airport station. And as said before for the people of darlington you talking of trans in the middle of a field when they could be near the center of town.
As to your idea of it being a parkway fro Teesside. Teesside is not exactly a wealthy area. Walk into the centre and your in the land of Greggs the Bakers and Everything's a Pound. True there are some wealthy areas but consider that that Egglesclif is already a parkway station for Teesside with four Grand Central Trains a day and turn up and go fairs well below that of East Cost and then there are only station stops at Northallerton, Thirsk and York and then runs non stop to London. Yet every time I go through Eaglescliff there is only a sprinkling of passengers getting on Grand Central. Harldy a promising start for an HS2 parkway at Durham Tees Valley which would involve traveling much further and slightly north.
There are wealthy areas such as Gisborough to the south of Middlesbrough but again they already have a station which they can access. Northallerton which has the same Grand Central service and this time you have shaved about 15 min of the journey and its even closer to London. Why would these people want to drive back on themselves to catch a more expensive train at Teesside parkway?
I broadly agree with you that if HS2 is to be extended north to Scotland the way to do it is via the east coast. However I would have to wonder how may trains per hour could be generated north of the Leeds area. Well maybe four or five per hour if the line to Aberdeen is also given an classic compatible service. Nor sure how easy it would be to build and HS2 line between Glasgow and Edinburgh or whether a line from Glasgow by passing Edinburgh would be a better idea. But how much outlay could 5tph justify for and HS2 extension?
Your idea for a Leeds city center terminal looks doable and would have the advantage of being a brown field site but in my opinion its just far enough from Leeds Central to count as a separate station and give connectivity issues for anyone changing between the two.
But tunneling under the river would be expensive and there would as you say be quite a section where the speed is slow.
However if this station was just used as a terminus HS2 could join the ECML south of Doncaster and Scottish bound HS2 trains run up a widened Selby diversion and into York then the widened and upgraded ECML before swinging mildly to the left before Northalleton then across the ECML passing Darlington to the east, Durham to the west and rejoining the ECML south of Chester le Street. depending on capacity it would be possible to demolish a few houses in the ClS area and build a second viaduct and the four tracks alongside the Tyne Yard. Unfortunately the train would have to run slowly through Newcastle until just south of Cramlington then back in on a dedicated HS2 line to Scotland .
I cant imagine that the Scottish people would be to bothered about loosing a direct HS2 connection to Leeds if they get York instead and it would eliminate the slow running though Leeds and the cost of a tunnel.
--------------------------------------------------------------------------------
What will happen to the wcml and ecml once hs2 is built. Will they be shut or will they continue to operate?
Which would be a pointless after modal shift to public transport. You have to think long term.
So at euston for example will they share the platforms with hs2 trains. Sorry i dont know alot on hs2
Continue to operate, though with reduced IC trains on the WCML. I'm not even sure where the ECML comes into this...
When HS2 should be built to Leeds, from 2033 I'd imagine ECML services to Leeds would run less frequently and/or stop more often, and/or terminate earlier.
Can't remember if anyone has said this but... let the long wait begin!![]()
![]()
Well it will allow leeds to maybe hence its service to East Anglia or improve local services on leeds doncaster line. These are the indirect beenfits no one seems to talk about when talking about HS2 (by no one that does not include us lot)
HS2 has effectively unlimited funding.
Inevitably, HS2 cannot be all things to all men. Diverting the line to take in more towns merely slows down what is supposed to be a high speed line. Running fast services alongside stopping trains is a system more appropriate to a Victorian railway than a 21st century one. Putting stopping trains into loops whilst expresses pass by? Why not go the whole hog and make it steam-hauled and light everything with oil lamps. Mixing fast and slow trains (as our great-grandparents knew) only works if you've got four tracks to play with. As this is unlikely to happen, we're stuck with a high speed line with limited stops. Judging by the Dutch experience of this as mentioned in the Telegraph:
http://www.telegraph.co.uk/news/ukn...50m-lesson-for-Britains-rail-enthusiasts.html
We could be in trouble.
Of course slow and fast workings can go together - look at HS1 - SE services calling at Stratford, Ebbsfleet and Ashford, followed by E* services, some running non-stop, some calling at either EBD / AFK. Either way, it works perfectly well!
Of course slow and fast workings can go together

1) There's no space at St Pancras unless you pave over The British Library
2) Routing via Heathrow decreases the CBR significantly thanks to extended journey times, HeX and XR already serve Heathrow
3) M40 Corridor is too curvey for a high speed alignment, and slews very far off route too, extending journey times
4) It IS stopping at the NEC and Birmingham Airport, what does that station next to the M42 look like???
They also mention links into XR at Heathrow Hub, what the hell do you think that massive station at Old Oak Common is for???
Yes, ARUP did propose this, they also said that it would adversely affect journey times, and wouldn't be a recommended alignment unless serving Heathrow was a project specification.Of these factors, the key to success is to route the line directly via Heathrow and to create there what is know as the Heathrow Hub, a new development just to the north of the existing Heathrow perimeter. This is a proposal developed by Arup, the consultants, and others that would in effect be a combined station and check-in terminal at which passengers would disembark, check in, go through security and
then travel - having got rid of their luggage in pods to their designated departure gates within the existing Heathrow layout.
Wrong, it adds 10mins to journey times, as reported by ARUP in the very report he is referencing.All this is so logical it is hard to see why it would be a problem. The Heathrow Hub increases the airport's capacity while reducing its environmental impacts. It makes virtually
no difference to the overall journey time to Birmingham, and will probably work out cheaper in overall construction cost.
This is the route suggested by ARUP, and HS2 Ltd. not any government!Now they are in power, the Conservatives in the Coalition have adopted the route Labour first suggested. Labour's response to this, would you believe, has been to switch its support from the original route once favoured by the Tories. It now backs the Heathrow
hub idea.
It would also require massive tunnelling unless you are going to take it out Paddington.
Isn't that what I just said? OK, to make it clearer, it's a sodding long way to divert via Heathrow or Heathrow Hub... Adds about 10mins onto journey times.
There will be a Heathrow Link, beyond the Heathrow Express and Crossrail links at Old Oak Common by a branch to Heathrow for terminating services WHEN HS2b comes into being.
Just to note, the article contradicts its self, and the reporter clearly doesn't know what he's talking about.
Of course slow and fast workings can go together - look at HS1 - SE services calling at Stratford, Ebbsfleet and Ashford, followed by E* services, some running non-stop, some calling at either EBD / AFK. Either way, it works perfectly well!
Yes, fast and slow trains share the tracks on other high speed lines, and that's my point. If HS2 is to fulfil it's potential as a truly modern railway do we want stopping trains taking up paths? I think once more stations are built there will be, over time, irresistible public pressure to provide a more regular service to them. HS2 won't have unlimited paths, even with moving block signalling. Vigilance will be required to stop HS2 developing the same congestive problems that the present East and West Coast lines suffer. Paths will also need to be preserved for services to and from the extended HS2. The CTRL (HS1) doesn't presently run anywhere near to capacity, so it can easily cope with a mixture of fast and not-so-fast traffic.