tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
There just aren't the paths on HS2 to allow this to say nothing of the fact that HS2 won't provide the fast links to MK etc. (a major growth area for employment)

As previously explained, HS2 will improve things for MK since it'll free up a lot of capacity for more services to stop there.

At the moment there's dozens of services a day that pass through Milton Keynes without stopping, which don't benefit the place but stop other services from stopping there.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
11th Largest...... (Wikipedia makes Stoke 16th Largest Urban Area but anyway)

It being eleventh largest or sixteenth or what not does not automatically entitle it to anything.
It is not clear that it really could justify such services by itself.

And define 'proper' First Class service?
It would likely be comparable to the service which is provided to Portsmouth or Southampton, which are part of a drastically larger Urban Zone.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Scotrail currently provide 4x 6-car services per hour between Edinburgh and Glasgow on the 'E&G'. They could provide 2x 12-car.

12 car services will never be able to run on the E&G because Queen Street is only ever going to be 8x23 car long at most, unless you want to demolish half the city centre. Very few places outside the main Intercity or ex-NSE lines have platforms anywhere near long enough for 12 car services.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,034
There just aren't the paths on HS2 to allow this to say nothing of the fact that HS2 won't provide the fast links to MK etc. (a major growth area for employment)

Scotrail currently provide 4x 6-car services per hour between Edinburgh and Glasgow on the 'E&G'. They could provide 2x 12-car.

Merseyrail runs 4x 3-car services to Chester. They could run 2x 6-car.

In both cases why do they run more frequent but shorter trains? Because they stimulate demand. You suggest that the 11th largest city in the UK should get a paltry 2tph semi-fast with no real first class service. For £30bn.

Bargain of the century.....

Train frequenies depend on what is available, where there is space for shorter more frequent services then its worth doing if it is better (i.e. more passengers), however for every example like that there are a number of services which are run full length to cope with the demand along the line.

Coverntry and MK will benefit a lot from HS2, I can even see them keeping some form of service not to dissimilar to the IC service they currently enjoy. As there will be a number of fairly substantial settlements which are being bypassed by HS2 and/or only having a limited service. As such it is likely that there could well be farily well used services.

For example. in the South East you just need to look at the stopping services to London, from places like Basingstoke, which take 20 minutes longer than the expresses. They are still well used, because all though they only run to the more minor stations (some of which are little more than villages) as there is enough demand for all those minor stops, either between those minor stops or from the larger settlements to them or so that a change is removed from the journey.

In the same way post HS2 there will be demand from the stations between the HS2 stations. Some traveling from between London & Birmingham to both places, some to places further north (where a change to HS2 and back again would make no differenance in journey time or is not possible), and even some travelling from Birmingham to some of the more minor HS2 stations as it is "wastes" less time (i.e. they don't need to leave quite so early but still get where they need to go before they need to, rather than taking HS2 and waiting around for 45 minutes).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,612
Location
Nottingham
Have a read of Appendix A in this document: https://www.gov.uk/government/uploa...on_of_the_service_patterns__January_2013_.pdf

I count 3tph semi-fast Coventry-London (2 starting at Birmingham New St and 1 from Liverpool Lime St) alongside the enhanced XC and local service

I also count 6tph London-MKC either fast or calling only at Watford Junction.

There is a later document dated October 2013 that I linked to above. Although in that document the figure I mentioned only includes "long distance" services so there may be some extra ones to places like Coventry aimed mainly at shorter journeys.
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
I think Milton Keynes will get 3* as many trains to London so i don't understand how it is loosing out.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I think Milton Keynes will get 3* as many trains to London so i don't understand how it is loosing out.

The only people in Milton Keynes losing out are the local trainspotters who enjoy watching 125mph services whoosh non-stop through the station (which limits the number of semi-fast services that can stop at MK).

For the vast majority, it'll be a benefit.
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,726
Location
Milton Keynes
MK currently gets 5xLM services to London and 3xVirgin (except peaks). I expect there to be an increase but I doubt it'll be 3xcurrent ICWC or the combined total. 6xICWC would be fine, especially if they call during the peaks
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,863
Location
UK
The only people in Milton Keynes losing out are the local trainspotters who enjoy watching 125mph services whoosh non-stop through the station (which limits the number of semi-fast services that can stop at MK).

They can surely find some nice spots along HS2 and get even better snaps and videos, no?
 
Joined
9 Feb 2009
Messages
807
The Ham said:
Coverntry and MK will benefit a lot from HS2, I can even see them keeping some form of service not to dissimilar to the IC service they currently enjoy. As there will be a number of fairly substantial settlements which are being bypassed by HS2 and/or only having a limited service. As such it is likely that there could well be farily well used services.

In which case there won't be the room for additional commuter and freight services. You can't have both else we would be able to do it now.

HSTEd said:
11th Largest...... (Wikipedia makes Stoke 16th Largest Urban Area but anyway)

Coventry...

Out of curiosity, what solution to the capacity issues on the WCML would you favour?

Quite simple - a more easterly route with stops at MK, Coventry and Stoke. Phase 1 would be London - Atherstone (avoiding the single down line between Brinklow and Attleborough) with a branch to Coventry and there are a myriad of options for the route into Brum. With the exception of Watford Junction, all the existing services could transfer to the route with no less of links, frequency or speed.

Phase 2 may result in the loss of direct HS trains to the likes of Macclesfield but they would at least be able to connect into the HS services (which the current plan doesn't allow for). Th easterly route allows a Leeds branch via Leicester freeing capacity on the MML (which HS2 doesn't) and/or you can use freed WCML capacity to run Euston - Leicester via a re-opended Brampton Valley line creating direct links from Leicester/Nottingham/Derby to Northampton/MK/Watford.

I think Milton Keynes will get 3* as many trains to London so i don't understand how it is loosing out.

What about north? I mentioned fast links to MK. Under NR's "connections" report, Stoke to MK would increase by approximately 35 minutes making it likely unviable.

If MK had fast, frequent links from both the north and London, then it is far more likely that jobs would start heading northwards out of London - HS2 will bring them southwards.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
In which case there won't be the room for additional commuter and freight services. You can't have both else we would be able to do it now.



Coventry...



Quite simple - a more easterly route with stops at MK, Coventry and Stoke. Phase 1 would be London - Atherstone (avoiding the single down line between Brinklow and Attleborough) with a branch to Coventry and there are a myriad of options for the route into Brum. With the exception of Watford Junction, all the existing services could transfer to the route with no less of links, frequency or speed.

Phase 2 may result in the loss of direct HS trains to the likes of Macclesfield but they would at least be able to connect into the HS services (which the current plan doesn't allow for). Th easterly route allows a Leeds branch via Leicester freeing capacity on the MML (which HS2 doesn't) and/or you can use freed WCML capacity to run Euston - Leicester via a re-opended Brampton Valley line creating direct links from Leicester/Nottingham/Derby to Northampton/MK/Watford.



What about north? I mentioned fast links to MK. Under NR's "connections" report, Stoke to MK would increase by approximately 35 minutes making it likely unviable.

If MK had fast, frequent links from both the north and London, then it is far more likely that jobs would start heading northwards out of London - HS2 will bring them southwards.

It gets those too with WCML manchester london services stopping at more places. Seriously have you read anything linked to in last page?
 
Joined
9 Feb 2009
Messages
807
It gets those too with WCML manchester london services stopping at more places. Seriously have you read anything linked to in last page?

Yes, a lot more than you obviously have as I was quoting the NR 'better connections' report which is more authorative than HS2 ltd.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Quite simple - a more easterly route with stops at MK, Coventry and Stoke. Phase 1 would be London - Atherstone (avoiding the single down line between Brinklow and Attleborough) with a branch to Coventry and there are a myriad of options for the route into Brum. With the exception of Watford Junction, all the existing services could transfer to the route with no less of links, frequency or speed.

Phase 2 may result in the loss of direct HS trains to the likes of Macclesfield but they would at least be able to connect into the HS services (which the current plan doesn't allow for). Th easterly route allows a Leeds branch via Leicester freeing capacity on the MML (which HS2 doesn't) and/or you can use freed WCML capacity to run Euston - Leicester via a re-opended Brampton Valley line creating direct links from Leicester/Nottingham/Derby to Northampton/MK/Watford.



What about north? I mentioned fast links to MK. Under NR's "connections" report, Stoke to MK would increase by approximately 35 minutes making it likely unviable.

If MK had fast, frequent links from both the north and London, then it is far more likely that jobs would start heading northwards out of London - HS2 will bring them southwards.


  • Unless you want to stop every single train on HS2 at these stations then they will represent a loss in paths. That would mean at least 10tph of full 400m long sets stopping for the sake of the frankly tiny numbers (percentage wise) of people who are interested in getting on and off at these stations.
  • You could build the stations but then end up not serving them as much as they should be, which would make them white elephants. All the HS2 stations are being built because they know the future demand will justify them. The cost of the stations won't be able to be reduced too much because they'll still need 400m GC gauge platforms on the straight and level, whether you only build two platform faces or four.
  • Unless you want to demolish a large section of these towns, the stations would be out-of-town constructions which would make them more difficult to get to than the existing ones. Journey time savings by having trains servicing these large towns/small cities would be eaten away by the connection time and the fact that they will slow down all HS2 trains to service them will reduce the overall journey time benefit.
  • Milton Keynes is too close to London to justify HSR and it has a mostly commuter travel market at the moment, not an InterCity one.
  • In general, these markets are nowhere near big enough to warrant 400m long sets. HS1 local services are run with 120m/240m long highish-speed commuter trains and this seems to be more than enough. These still have to leave the line to fill up across Kent. 2% of the entire population of Macclesfield will be able to sit down on a single HS2 train.
  • Every time you introduce another connection to the existing network you will impact reliability and punctuality more and more. HS2 is meant to be as much an island of complete stability - separated from freight train breakdowns, level crossings and flat junctions - as is possible and these connections are very expensive.
  • The closer HS2 is built to where people actually live the more the cost of mitigating effects on other people rises. HS2 could have been designed as an enormous viaduct over the top of the existing mainlines and from a technical standpoint been perfectly fine but it would cause millions of people to be affected. For no real gain whatsoever. Better it go where no one lives (the UK is either countryside or towns/cities, there's really nothing else) and very much annoy a few very vocal little Englanders than cause chaos for millions.
I would have no problems if these towns could make the business case for a Javelin-sized service which would run on a combination of upgraded, reopened and new lines. The problem is though that the costs of this are going to be just as high per kilometre as HS2 itself but without the national benefit. Maybe once the InterCity pressure is off the existing lines will there be changes to improve them - you never know, we might even have moving block ECTS level 3 by then! I also imagine that you could still run trains at full line speed so long as they just stop at stations rather than blast through so the journey times aren't going to be that bad.

There is simply no justification for forcing the millions of passengers who want to go between major, international-scale cities to have to slow down and stop for the sake of a few hundred thousand people on smaller towns along the line. That is why there are no and will be no stupid, ill-thought-out pointless little Haute-Picardie-Anglaises along the line.
 
Joined
9 Feb 2009
Messages
807
There is simply no justification for forcing the millions of passengers who want to go between major, international-scale cities to have to slow down and stop for the sake of a few hundred thousand people on smaller towns along the line. That is why there are no and will be no stupid, ill-thought-out pointless little Haute-Picardie-Anglaises along the line

Birmingham - London represent a minority of users on the EBW services.

Unless you want to demolish a large section of these towns, the stations would be out-of-town constructions which would make them more difficult to get to than the existing ones. Journey time savings by having trains servicing these large towns/small cities would be eaten away by the connection time and the fact that they will slow down all HS2 trains to service them will reduce the overall journey time benefit.

You don't need a new station at Coventry, MK is just about doable and Stoke has plenty of spare land to form an interchange station with the existing line.

I don't see you having a problem with Toton which has all the issues you mention...

Coventry and Stoke are cities (310,000 and 260,000 respectively) yet Crewe at 70,000 will be served with most places that might connect there (Runcorn, Warrington etc.0 are due to have direct services anyway.

Isn't it funny how when anyone suggests an alternate way to provide capacity, suddenly the speed argument gets trotted out despite 'HS2 not being about speed'....
--- old post above --- --- new post below ---
There is simply no justification for forcing the millions of passengers who want to go between major, international-scale cities to have to slow down and stop for the sake of a few hundred thousand people on smaller towns along the line. That is why there are no and will be no stupid, ill-thought-out pointless little Haute-Picardie-Anglaises along the line.

Yet you don't suggest removing stops on the current services...

Preston and Toton are major international-scale cities?:lol:

What part of HS2 allows connections between the East Midlands (Notts, Derby, Leicester) and Milton Keynes. I guess we'll have to keep that M1 full....
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,612
Location
Nottingham
Yes, a lot more than you obviously have as I was quoting the NR 'better connections' report which is more authorative than HS2 ltd.

I reviewed that on behalf of a client when it was issued last summer and came to the conclusion it was no more than a set of examples of what might be possible. Some of the suggestions were mutually exclusive. Therefore I would put more weight on the HS2 publications on released capacity, since these do at least represent a coherent timetable albeit one designed for testing as a business case rather than actually implementing.

This quote from the NR website page linking to the report rather gives the game away:

sets out a number of approaches to how the capacity freed up by HS2 could be used. The feedback we receive on this report will be used to look in more at the opportunities HS2 presents.

From http://www.networkrail.co.uk/improvements/high-speed-rail/
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
So we must never do anything because we might lose a small flow to the roads?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,863
Location
UK
Everyone will get lost to the M6 at some time. Some may stay on the M6 for many, many hours!
 

Francis

Member
Joined
22 Dec 2011
Messages
184
Location
Chorley, Lancs
The French TGV trains seem able to call at intermediate stations, by turnout loops, where necessary, or to run via high speed avoiding lines when no stops are required.

Why can HS2 not provide an hourly service north from a Chilterns Parkway, for example, somewhere near High Wycombe or Aylesbury? It might help to buy off some of the local opposition to the project if the locality actually had some benefit, and not just the negatives. It would need turnouts and passing loops.

Secondly, HS2 needs to be plumbed in to the existing system further north: near Colwich, for example, so that Manchester via Stockport, Stoke and Macclesfield to London services can use it, and at Crewe, so that Chester and N Wales, and Liverpool services can run on to it. A link to Stafford would allow Stafford/Shrewsbury services to use it. Is Birmingham Curzon St going to be connected by a travelator or something similar to New St? Otherwise it will be inconvenient for anyone wanting to switch to suburban services there.

The failure to serve Coventry is also puzzling. Maybe an alternative line following the old GC to a point on the LNW between Coventry and Rugby would permit this for some services, to then take the conventional route to Coventry, Birmingham Int. New St and Wolverhampton.

Maybe these are additions for once the main spine has been completed. But an HS2 hermetically sealed off from the rest of the network will be of diminished usefulness.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Maybe these are additions for once the main spine has been completed. But an HS2 hermetically sealed off from the rest of the network will be of diminished usefulness.

HS2 isn't isolated and never has been, the connection at Lichfield as part of Phase 1 is proof of that, how do you think HS2 Phase 1 trains will get northbound?
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Birmingham - London represent a minority of users on the EBW services.

You don't need a new station at Coventry, MK is just about doable and Stoke has plenty of spare land to form an interchange station with the existing line.
  • Coventry: Either you build your HS2 station in a box underneath it, which would basically close that section of the WCML for several years, or you have to demolish houses for the approach lines on either side. 400m is not much less than the distance between the two junctions either side of the station and the HS part would need to be operationally separate so you would have a huge amount of work rebuilding this station. Absolutely no where else on the line other than at Euston would this level of reconstruction of existing lines be needed. The amount of land required isn't just for the end result but for the construction - just have a look at the Environmental Statement map books to see just how much is required. Any HS2 line through Coventry would destroy entire rows of residential houses, quite like what it would be to four/six/eight track the WCML as proposed by the antis.
  • Milton Keynes: I agree, the layout of the town is pretty well suited for a HS station but the fact still remains that it would not be significantly faster to London than the existing routes. Since the vast majority of people will be going to London, there isn't much point building a station here. How many people are going to visit Milton Keynes from the North? Not very many. Is that more than can fit on a normal train? No.
  • Stoke: Unless you want to much of industrial Stoke you would have to put it in a station box and tunnel. These are very expensive things, strangely enough. Which trains would you stop at Stoke? Just the Manchester ones? Who would pay for the station box? - remember that the Airport stop is going to be funded partly by the private sector.
I don't see you having a problem with Toton which has all the issues you mention...
Toton is a difficult choice to make but there has to be a compromise made between Derby and Nottingham. Serving one but not the other wouldn't do as much good overall as doing what they're doing at Toton. By the time HS2 opens we will have had almost 15 years of extremely rail-oriented transport policy so there will be better connections than ever before - the links between the two cities will get even stronger because they both need to link to Toton.
Coventry and Stoke are cities (310,000 and 260,000 respectively) yet Crewe at 70,000 will be served with most places that might connect there (Runcorn, Warrington etc.0 are due to have direct services anyway.
The WCML either side of Crewe is straight and direct enough that it makes perfect sense to reuse a lot of the alignment. Crewe is only being served by means of a simple connection between the HS2 and WCML lines just south of the station before HS2 goes into tunnel. If Stoke were that position instead it is highly likely HS2 would have served there instead, but it isn't.
Isn't it funny how when anyone suggests an alternate way to provide capacity, suddenly the speed argument gets trotted out despite 'HS2 not being about speed'....
Capacity alone isn't enough to justify the new route, and neither is pure speed. Both together are what makes it possible. Every compromise taken at the southern end to suit a small-ish number of people does much more damage as you go further north. The overarching goal of our HS network must be to diminish the role of the domestic air market as much as possible and that is made so much more difficult if you try to make the line do everything for everyone by serving more places than absolutely necessary.
Yet you don't suggest removing stops on the current services...
If Virgin can make a Glasgow or Carlisle train even faster then they will, but they have franchise obligations to make.
Preston and Toton are major international-scale cities?:lol:
By removing any intermediate stops whatsoever you do reduce the passenger numbers enough to make a real impact. From Preston it is then possible to connect to much of the north of England.
What part of HS2 allows connections between the East Midlands (Notts, Derby, Leicester) and Milton Keynes. I guess we'll have to keep that M1 full....
How many people want to go there? Is it enough to warrant stopping a 400m train?
--- old post above --- --- new post below ---
The French TGV trains seem able to call at intermediate stations, by turnout loops, where necessary, or to run via high speed avoiding lines when no stops are required.

Why can HS2 not provide an hourly service north from a Chilterns Parkway, for example, somewhere near High Wycombe or Aylesbury? It might help to buy off some of the local opposition to the project if the locality actually had some benefit, and not just the negatives. It would need turnouts and passing loops.
TGV trains have the advantage that they are completely compatible with any electrified mainline in France, including platforms and so on. Anything that we build to serve with most HS2 services has to be built bigger otherwise we lose the benefit of double-decker trains. The French also did not have as developed a classic rail system as ourselves so they don't have much choice whereas we will still have a 110mph/125mph WCML, MML and ECML once HS2 is finished. The only difference is that services will stop more often. 125 Aventra commuter EMUs are in the pipeline and in-cab signalling so services aren't going to decrease massively in speed or frequency.

The Chiltern region isn't densely populated enough and the route HS2 follows is far from existing transport links. If they want a station, they wouldn't want the traffic changes that would result. They would by a large margin use HS2 to commute to London, even though the trains are going to be when they run on Phase 1 and no one will be getting off at this Chiltern Parkway. They would benefit much more overall by upgrading the Chiltern mainline with electrification and speed increases.
Secondly, HS2 needs to be plumbed in to the existing system further north: near Colwich, for example, so that Manchester via Stockport, Stoke and Macclesfield to London services can use it, and at Crewe, so that Chester and N Wales, and Liverpool services can run on to it. A link to Stafford would allow Stafford/Shrewsbury services to use it. Is Birmingham Curzon St going to be connected by a travelator or something similar to New St? Otherwise it will be inconvenient for anyone wanting to switch to suburban services there.

The failure to serve Coventry is also puzzling. Maybe an alternative line following the old GC to a point on the LNW between Coventry and Rugby would permit this for some services, to then take the conventional route to Coventry, Birmingham Int. New St and Wolverhampton.

Maybe these are additions for once the main spine has been completed. But an HS2 hermetically sealed off from the rest of the network will be of diminished usefulness.

Phase 1 has a grade separated link to the WCML fast lines at Lichfield.
Phase 2 has another just south of Crewe and one just south of Wigan, while there is a link to the ECML at Church Fenton, just south-west of York.

The more links you provide to the classic network the more HS2 will cost (each one has to be grade-separated at both ends and built to the same standard as HS2 itself) and the more chance of classic network problems infecting the HS network.

HS2 only needs to serve the places which will overwhelm the WCML, of which Coventry is not one. It tries to do one thing and do it well. If Coventry grows enough to justify a new line in the future it will be decades away and it will be perfectly possible just to build another line. HS2 is not the endgame for the British rail network - it is just the start (otherwise they may as well call it HSΩ).
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
Everyone will get lost to the M6 at some time. Some may stay on the M6 for many, many hours!


Others may cruise a long at 120 mph on the M6 toll and think what's the point of catching the train? Done that, got the badge. But surely that's not the point of HS2?
--- old post above --- --- new post below ---
So we must never do anything because we might lose a small flow to the roads?

Either that or you write off anything which falls outside of Manchester / Birmingham / London. Do that at your peril.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,034
In which case there won't be the room for additional commuter and freight services. You can't have both else we would be able to do it now.

Coverntry and MK could retain there current IC services whilst still allowing a number of the existing IC services to be removed from the network (as there are a lot of services which call at neither or any other station south of Birmingham) which would allow more frequent non IC and freight services to run.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,863
Location
UK
Others may cruise a long at 120 mph on the M6 toll and think what's the point of catching the train? Done that, got the badge. But surely that's not the point of HS2?

Ah, the toll road is another story. Lovely road, but only empty because clearly a lot of people won't/can't use it over the horrible 'old' road.
 