joeykins82
Member
Captive stock should be cheaper to procure as it'll be more widely available European loading gauge.
I think the other thing is who actually owns HS1, I believe it is Canadian teachers pension fund who will obviously want a return on their investment.Both these routes are operated by the same company so they don't really care which route you take, they'll get your money anyway. For longer distance tickets not priced by Southeastern there is no premium.
Absolutely the European gauge will make 3+2 seating actually comfortable and that is before you consider adding a second deckApart from fitting more people in as they can be twice as long as clasic compatibles without having to join and split services, potentially double decker and are wider (so they either get more people in or are more comfortable).

AFAIAA there are no 3+2 trains on the continent, certainly not high speed. I had a friend complaining today that Virgin trains seats were too small for his body builder's butt![]()
I think the other thing is who actually owns HS1, I believe it is Canadian teachers pension fund who will obviously want a return on their investment.
HS2 however I believe will be owned by network rail and charged in a similar if not identical way to the other infrastructure.
Absolutely the European gauge will make 3+2 seating actually comfortable and that is before you consider adding a second deck![]()
Is it officially stated there wont be a premium, or is this more pro-HS2 wishful thinking?
If you book a return from Ashford to London, it's 20% more to use the HS1 service. Why should HS2 be any different?
And why shouldn't the users pay a premium, when the advocates claim they get benefits from time saved?
Less burden for the poor suffering taxpayer (the vast majority of whom will never use it)
who will be lumbered with billions of taxes so that the relatively few can whizz along
Absolutely spot on. Buying captive stock has no advantages.
The HS2 loading gauge isn't going to be that much wider (the Shinkansen gauge is wider).
Its a few inches at most.
The real benefit is the possibility of double decker trains.
That answers that then.
Still, even a few inches can make all the difference. (ooer).
Various Secretaries of State for Transport have said this repeatedly in the House in answer to questions and this is the position that HS2 Ltd use in all economic modelling.
Well we'll see. At present the politicians are promising all things to everybody to try to garner public support
--- old post above --- --- new post below ---
Because there is still a practical way to travel between Ashford and London that isn't HS1.
There will not be such a thing for HS2.
.
I cant grasp this. There will still be practical, direct, services from Leeds to Kings X, Manchester and Birmingham to London
--- old post above --- --- new post below ---
Additionally, providing a seat on HS1 costs rather more than doing so on the conventional line, this situation is reversed for HS2, where it will be cheaper to provide such a seat than on the classic lines running parallel.
Because having a premium service implies there is a non premium service.
Having a non premium service runs counter to the very point of the project, to remove long distance travel from the West Coast Main Line (and East Coast Main Line for that matter) for destinations that are not on the relieved section.
Why would we undermine the scheme by wasting valuable WCML paths on competing services that will do nothing but abstract HS2 revenue?
And is it cheaper to travel from Manchester to Sheffield on the stopper than it is to travel on the Liverpool-Norwich train or one of the TPE 'Express' workings?
.
So you've spent £50bn (or whatever) on which you've got a huge annual capital charge, a fleet of energy hungry trains and no doubt just had a gun to your head by the unions re pay rates (see Boris on the Olympics), and that's cheaper?
Re fares if you look at Peterborough-Kings X or New St.-Euston you'll see that the faster service charges a premium
--- old post above --- --- new post below ---
You really want to make that argument?
Very few people regularly use intercity rail travel at all, why is the taxpayer throwing endless wads of money at it to prop it up?
If you want significant railway travel to survive outside of the south east be careful what you claim to undermine HS2.
.
Is this the latest scaremongering by the pro HS2 lobby-if you don't support HS2 then railway travel outside the SE will be cut?
--- old post above --- --- new post below ---
Its cheaper and you can fit more people on.
That means it has some rather serious advantages.
How can you fit more people on? I accept d/deckers may allow this but no-one can point me to a document that says these are needed or are under consideration.
Similarly 2+3 seating. The Scandinavians have a loading gauge that allows wider trains so forget that. I don't believe anyone on the Mainland has 2+3 seating on high speed services. And you don't get much additional useable width-the TGV Atlantique is only approx. 3 inch wider than a typical BR EMU
The number of people you can fit in depends on the number of carriages, 1st/2nd class mix, seat pitch etc. This will apply to both captive and classic trains.
How is it cheaper? If you're going to have to design a classic-compatible train anyway and set up production, why isn't it cheaper to just run a few more of these off than buy another totally different design with all that implies in terms of staff training, duplicate spares etc. To say nothing of the extra weight of a bigger carriage and consequent higher energy costs. And you'd clearly have lost the flexibility to run "off piste" eg engineering diversions
Could they really be wider? I mean, wouldn't this cause massive issues with classic compatible stock having elephant-sized gaps between the train and the platform edge? Unless they did something clever like interlacing tracks at stations...
Well we'll see. At present the politicians are promising all things to everybody to try to garner public support
I cant grasp this. There will still be practical, direct, services from Leeds to Kings X, Manchester and Birmingham to London
So you've spent £50bn (or whatever) on which you've got a huge annual capital charge,
a fleet of energy hungry trains
and no doubt just had a gun to your head by the unions re pay rates (see Boris on the Olympics)
Re fares if you look at Peterborough-Kings X or New St.-Euston you'll see that the faster service charges a premium
Is this the latest scaremongering by the pro HS2 lobby-if you don't support HS2 then railway travel outside the SE will be cut?
How can you fit more people on? I accept d/deckers may allow this but no-one can point me to a document that says these are needed or are under consideration.
How is it cheaper? If you're going to have to design a classic-compatible train anyway and set up production, why isn't it cheaper to just run a few more of these off than buy another totally different design with all that implies in terms of staff training, duplicate spares etc.
To say nothing of the extra weight of a bigger carriage and consequent higher energy costs.
And you'd clearly have lost the flexibility to run "off piste" eg engineering diversions
Re fares if you look at Peterborough-Kings X or New St.-Euston you'll see that the faster service charges a premium
How can you fit more people on? I accept d/deckers may allow this but no-one can point me to a document that says these are needed or are under consideration.
How is it cheaper? If you're going to have to design a classic-compatible train anyway and set up production, why isn't it cheaper to just run a few more of these off than buy another totally different design with all that implies in terms of staff training, duplicate spares etc. To say nothing of the extra weight of a bigger carriage and consequent higher energy costs. And you'd clearly have lost the flexibility to run "off piste" eg engineering diversions
The lack of any south facing HS2 to Classic connections means that the only section of line that could actually be bypassed is Crewe to Manchester (excluding the Crewe-Wigan connection which is only operated by CC stock anyway).
Everything else would require the trains to run all the way to London on the classic line which is untenable because you would have to start axing commuter trains on the WCML to get them paths.
And I am not really sure how you could run a train from Leeds into Euston using only electrified railways that aren't HS2.
Not really tied into any thread of discussion but can someone answer me why does it seem to be a given that CC stock can't tilt? I realise tilt gear adds weight but if running a double decker is viable?
Clearly there is higher cost in terms of energy used per seat but running north of Crewe at 110 instead of a possible 140 seems like a terrible idea?
Finally getting 140 running seems like some easy political capital too
Not really tied into any thread of discussion but can someone answer me why does it seem to be a given that CC stock can't tilt? I realise tilt gear adds weight but if running a double decker is viable?
Clearly there is higher cost in terms of energy used per seat but running north of Crewe at 110 instead of a possible 140 seems like a terrible idea?
Finally getting 140 running seems like some easy political capital too
HS2 is designed on the basis of proven technology, for example the published timings are based on an Alstom AGV. There is no proven design of tilting train available that could match the top speed necessary to keep up with other trains on the London-Birmingham section. I seem to remember Germans have had major problems with tilting high speed trains, and I'm not sure if anyone else has tried.
Unless someone comes up with a 360km/h tilting train, the only option would be to slow down the whole HS2 network to run at the speed of the fastest tilting train available.
Not really tied into any thread of discussion but can someone answer me why does it seem to be a given that CC stock can't tilt? I realise tilt gear adds weight but if running a double decker is viable?
Clearly there is higher cost in terms of energy used per seat but running north of Crewe at 110 instead of a possible 140 seems like a terrible idea?
Finally getting 140 running seems like some easy political capital too
However even if diversions were needed then, as it would likely be late night/at a weekend passenger numbers are proberbly going to be low enough that the existing network could cope with a few extra trains per hour and/or longer trains than normal to make up for a lot of the loss in capacity
Not really tied into any thread of discussion but can someone answer me why does it seem to be a given that CC stock can't tilt? I realise tilt gear adds weight but if running a double decker is viable?
Could you not disable the tilt between London and Manchester run at 360kph? Then just enable it and go for it.
As you allude, double decker is possible but allows for more seating, tilting only provides speed so cost per seat is higher. 140 on classic lines will require In cab signalling and an extra portion of capsasity because other trains are moving slower.
Not really tied into any thread of discussion but can someone answer me why does it seem to be a given that CC stock can't tilt?
To ask Her Majesty's Government, in respect of the first phase of the proposed High Speed 2 line, what is the expected journey time from London to Glasgow using HS2 with and without tilting on the conventional network, compared with existing journey times.
Earl Attlee: At this early stage in the Government's proposals for a high-speed rail network, no decisions have been made regarding the detailed specification of rolling stock. At this point however, the Government do not anticipate that trains operating on HS2 will be capable of tilting, either on the high-speed network or on the conventional network. This is because tilting trains are necessarily heavier than non-tilting trains, and increasing the weight of a vehicle ultimately results in a reduction of maximum speed. This means that a tilting train would not be able to operate at speeds of 225 mph or 250 mph as required by the HS2 route.
We tested our assumptions on tilting trains both with train manufacturers and with our technical challenge panel, who agreed with our conclusions. It is possible that future technology would permit a tilting high-speed train to be built, but no manufacturer could visualise and offer either credible costs or likelihood of successful commercial development of such a product. There are currently no tilting high-speed trains anywhere in the world.
Services running off HS2 onto the west coast main line to continue to Scotland would be speed-limited by the curvature of the route in a number of locations. However there is scope for increasing the non-tilt line speed from 110 mph to 125 mph or higher at a number of locations. Between Lichfield-where HS2 rejoins the WCML-and Glasgow, the difference in time between a non-tilting 110 mph train and a tilting 125 mph Pendolino is estimated to be 13 minutes. HS2 Ltd believes that by reviewing the assumptions behind the WCML upgrade works it should be possible to run non-tilting trains at 125 mph for lengthy sections, and thereby regain 6 or 7 of the lost 13 minutes. Similarly from Lichfield to Manchester a 110 mph non-tilt train would lose two minutes, of which we believe one minute could be regained. The HS2 business case is based on these journey time assumptions.
A high level assessment of journey times indicates that the London to Glasgow journey would take four hours using a London to the West Midlands high-speed line, reducing to three hours and 30 minutes once the Y network became operational. This compares to a current, standard journey time of four hours and 30 minutes.
Lord Berkeley raised this in the Lord's back in 2011:
Chris
If the CC trains were pendolinos and upgraded for higher speeds on the HS2 stretch, could they not achieve the timings mentioned by Lord Attlee?
Surely, for the duration, through trains to Scotland are bound to be CC and not captive?
I am probably remiss here so put me right please.