High Speed Two (HS2) discussion

Status
Not open for further replies.

Mex

Member
Joined
6 Dec 2009
Messages
64
A mock funeral? Clearly it WAS a publicity stunt, and a pretty poor taste one at that, so is it any surprise some people walked out upon realising that nobody was going to listen to anything they said?

Millions of visitors to the Chilterns won't be put off by a narrow railway line that in most places won't be visible. And plenty will actually find it quite pleasant to see a modern train gliding through the countryside anyway - and that isn't just railway enthusiasts.

I wonder how these millions of visitors get to the area each year? By car or by train? Do they have a problem with the existing railway, or the motorway?

You need to remember that motorways cause no environmental disruption whatsoever during construction, and are completely invisible when completed. Also, you're forgetting that motor vehicles are completely silent and invisible, and cause no pollution at all.

I'm somewhat surprised, not to say disappointed, that you have failed to recall these rather important considerations.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
According to the news today:

Alcohol-related crime is estimated to cost the economy around £11bn a year including £2.7bn to the NHS alone.
http://www.telegraph.co.uk/news/ukn...er-up-in-drunk-tank-and-pay-400-to-leave.html

In which case if the proposals for drunk tanks and the like could save the government just 1/5th of the £11bn then it would pay for HS2 at zero extra cost to the tax payers. Therefore solving the funding issue which is often raised by those opposing HS2, whilst allowing the government to carry on spending on the rest of the network at the current rate.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
There are two asumptions here. Firstly that there will be enough classic compatible trains built to replace all those trains currently run by Virgin. Now whilst this would be wonderful news in that they could be used to run all over the network i.e. Manchester to Bristol the impression I get is that this won't be the case

Since we are talking something like 2026 when the London - Birmingham/ Lichfield servics will be running (?), the 390s are going to be getting quite old.

Some are going to be needed for fast services on the Milton Keynes route anyway, of course, so it wouldn't need to be a "one for one" replacement.

Classic Compatible trains are going to be needed in reasonable number longer-term for services to Liverpool/ Newcastle etc anyway, though I don't know the exact numbers.

The second asumption is that there will be no growth on the WCML north of Lichfield. Not only that but we won't be able to run the additional trains from Manchester to the South that serve the Trent Valley et al. You also need to bear in mind that not all trains to Cheshire run non stop.

There probably will be growth north of Lichfield, agreed (though probably not as much as growth south of Lichfield) - but we can only build one stretch of HS2 at a time.

At the moment the departure board at Euston shows:



  • xx.00 - Manchester service - first stop is Stoke so could run via HS2 line south of Lichfield
  • xx.03 - Birmingham service
  • xx.07 - Liverpool service - first stop is Stafford so could run via HS2 line south of Lichfield
  • xx.10 - Chester/ Holyhead service
  • xx.20 - Manchester service
  • xx.23 - Birmingham service
  • xx.30 - Lancaster/ Glasgow service - first stop is Warrington so could run via HS2 line south of Lichfield
  • xx.40 - Manchester service - first stop is Crewe so could run via HS2 line south of Lichfield
  • xx.43 - Birmingham service

...so that's four services an hour that could run via HS2 from London to Lichfield and take up their "old" path north of Lichfield - which would mean a faster service for Manchester/ Liverpool etc and free up a few extra paths for Milton Keynes/ Northampton etc each hour.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
You need to remember that motorways cause no environmental disruption whatsoever during construction, and are completely invisible when completed. Also, you're forgetting that motor vehicles are completely silent and invisible, and cause no pollution at all.

I'm somewhat surprised, not to say disappointed, that you have failed to recall these rather important considerations.

I'll go and stand in the corner. :oops:
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
How pathetic, fortunately us normal people can see through that pathetic attempt to spoil valid and respectful discussion, especially for those locals who did actually want valid and respectful discussion

A valid and respectful discussion was probably not in the interest of the more bombastic element of the anti campaign.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
A valid and respectful discussion was probably not in the interest of the more bombastic element of the anti campaign.

Yes so they had to ruin it for those who wanted to air valid concerns and ask valid questions. Unfortunately it seems like they are the losers and they may have lost their oppertunity to do so
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
Yes so they had to ruin it for those who wanted to air valid concerns and ask valid questions. Unfortunately it seems like they are the losers and they may have lost their oppertunity to do so

They can think about that when construction starts. At best they might be able to delay HS2 another few years, but it's going to be built one way or another.

It's the general public that will suffer from further delays of course, including many of the people moaning today.

Once it goes ahead, and the local residents finally accept it, they'll be the first to start complaining that their existing train service is getting more and more congested and why is it taking so long for HS2 to open!
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
At the moment the departure board at Euston shows:



  • xx.00 - Manchester service - first stop is Stoke so could run via HS2 line south of Lichfield
  • xx.03 - Birmingham service
  • xx.07 - Liverpool service - first stop is Stafford so could run via HS2 line south of Lichfield
  • xx.10 - Chester/ Holyhead service
  • xx.20 - Manchester service
  • xx.23 - Birmingham service
  • xx.30 - Lancaster/ Glasgow service - first stop is Warrington so could run via HS2 line south of Lichfield
  • xx.40 - Manchester service - first stop is Crewe so could run via HS2 line south of Lichfield
  • xx.43 - Birmingham service

...so that's four services an hour that could run via HS2 from London to Lichfield and take up their "old" path north of Lichfield - which would mean a faster service for Manchester/ Liverpool etc and free up a few extra paths for Milton Keynes/ Northampton etc each hour.

Also the services diverted via HS2 could stop at Birmingham Interchange on the way up/down HS2 which would offer additional journey oppertunities for people wanting to access Birmingham Airport, the NEC or even Birmingham itself (via International) to/from Manchester, Liverpool and Glasgow.
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,726
Location
Milton Keynes
Also the services diverted via HS2 could stop at Birmingham Interchange on the way up/down HS2 which would offer additional journey oppertunities for people wanting to access Birmingham Airport, the NEC or even Birmingham itself (via International) to/from Manchester, Liverpool and Glasgow.

I thought Birmingham Interchange is going to be on the opposite side of the airport from NEC/International?
 

trainplan1

Member
Joined
6 Dec 2010
Messages
115
I thought Birmingham Interchange is going to be on the opposite side of the airport from NEC/International?

Don't think so, thought it was the other side of the NEC not the airport? I think the HS2 station would connect the NEC, International and the Airport by a people mover of sorts?
 

GingerSte

Member
Joined
26 May 2010
Messages
292
However, I think that HS3 should actually be the section from Birmingham to Leeds. I'm not a fan of the current design for this leg, and I think that this section should be sent back to the drawing board. It can be added later if necessary.

Actually I would have to say I disagree, I think HS2 is well thought out.

It is not starting till 2018 as it is designed to start after crossrail has finished, too late for me but economics wise, this makes sense.

There is no point building legs of HS2 piecemeal, this is one of the reasons construction in the UK is typically expensive, we don’t plan long term, we build piecemeal additions and this costs more to stop and start work. Building the whole HS2 over 10 years makes sense.
The Birmingham to leeds leg I think works fine, it can be used as a cross country route as well. I understand why they went to meadowhall instead of Sheffield centre.
If you read the documentation on the DoT website it explains the rationale behind all the decisions.

I would be interested on what incremental upgrades you think would work

I've read the information on the rationale behind Leeds New Lane and Sheffield Meadowhall. I understand the reasons behind them. I just don't agree. I would be happy to list my reasons, but they would be better suited to the HS2 thread (in fact I probably will, but it may be later tonight or tomorrow). Suffice to say that I would prefer HS2 to be as integrated with existing transport hubs as possible, and I don't think the current scheme does this.

(The above quotes are taken from the HS3 thread, but the arguments are better suited to this one.)

As I said on the HS3 thread, I would prefer that HS2 is as integrated with existing public transport as possible, and I don't believe the current stations at Meadowhall and Leeds New Lane do this. (I believe the same about Toton, but have less local knowledge about this area, so will save my comments.)

Leeds New Lane is not integrated with either bus or onward train transport. The travelators to me seem like a "fudged" solution, and would be one of the easiest things to drop in the desire to save money. I wouldn't count on the travelators being built. You would then be left without proper connection between trains.

The station as planned is not in the centre of Leeds, and would require a lot of land purchase. As I understand it, the UK HQ of ASDA is on part of this site, and I don't imagine them giving it up without a lot of compensation. It also straddles one of the main arterial routes into and out of Leeds (from the M621 and Beeston). Construction of the station in this location would cause a huge amount of disruption, and the compo for business/residents affected in the short term would be a huge part of the cost.

In my opinion, the Leeds terminus should be at the existing station, using the land to the north of platform 1 currently used as car park. I've included a quick plan and section below. I would also note that this station could cantilever over the River Aire to an extent (say 3 or 4 metres): this would be more suitable for platform/office space than railway loading. The HS2 portion of the station would be at "High Level", as would some of the new HS2 concourse. This would mean demolition of the existing multi-storey car park, but this could be re-located north of the River Aire. I admit that the aerial photo above is old and there have been changes, but can't remember what they are, so apologies if there's a building in the way of the new MSCP now.

The new concourse would be situated in the pick up / drop off and delivery area behind the MacDonalds and Starbucks (I think, going from memory). These outlets may be lost in the process, but they would probably be replaced on the new concourse.

It has been mentioned that there may already be plans to build a number of extra platforms at ground level in this location, presumably to serve the Harrogate lines. A high level station may limit the number of platforms that could easily be accommodated without light becoming a problem, but it wouldn't preclude this.


Plan view of suggested station site


Section through suggested station showing two possible options

For the approach, I would use the land over Whitehall junction, and then utilise the Leeds-Castleford line as far as the M1 in Hunslet. The two sets of tracks would diverge somewhere between Wakefield Road and the M1 (or wherever the existing bridges allow for it). I realise that this would limit capacity somewhat, but it shouldn't be too onerous. You would only need 3 HS2 services per hour (per direction), and assuming 3 classic services per hour on Leeds-Castleford only takes up 6 paths per hour.

I acknowledge that track improvements, gauge clearance and electrification work would be required on the section of Leeds-Castleford line used for HS2, but the cost/disruption of this would be at least an order of magnitude less than the cost of a station at New Lane. This could also be staged to minimise such disruption. I would note that if some bridge decks need to be replaced to allow gauge clearance / electrification, it may prove more cost-efficient to increase the span of the bridge and allow four tracks instead of two. This would reduce the mileage of track shared by HS2 and classic trains. I would also note that, as there are no stations on this shared stretch of track, there shouldn't be as much of a problem allowing HS2 captive sets to use it, rather than restricting to classic compatible sets. I may be wrong on this, though.

The speed from Hunslet to Leeds Station would be slower than ideal, but I wouldn't expect the time penalty to be too large. I would argue that the reduction in cost of the station and approach using my suggestions above would outweigh the time penalties from using this line. The fact that it's close to a terminating station means I would expect the speed in this area to be relatively low anyway.

The ideas above are obviously not fully developed, and would require a lot of development.

I do have opinions on Sheffield as well, but I'll leave them for a later post.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
(The above quotes are taken from the HS3 thread, but the arguments are better suited to this one.)

As I said on the HS3 thread, I would prefer that HS2 is as integrated with existing public transport as possible, and I don't believe the current stations at Meadowhall and Leeds New Lane do this.

(I do have opinions on Sheffield as well, but I'll leave them for a later post

Living in Sheffield (and on the far side of Sheffield from that big shopping centre), I'm okay with a station at Meadowhall - it could be a lot worse (the site of the old Sheffield Victoria, Nunnery Square, the site of the old Sheffield Airport) - Meadowhall is integrated into the local trains/ trams/ buses without needing to build whole new systems like at Totton.

I certainly don't see Sheffield justifying its own "spur", and it'd be hard to argue with a station at Sheffield Midland - given the costs caused by squeezing a High Speed line through Sheffield's valleys/ hills.
 

GingerSte

Member
Joined
26 May 2010
Messages
292
Living in Sheffield (and on the far side of Sheffield from that big shopping centre), I'm okay with a station at Meadowhall - it could be a lot worse (the site of the old Sheffield Victoria, Nunnery Square, the site of the old Sheffield Airport) - Meadowhall is integrated into the local trains/ trams/ buses without needing to build whole new systems like at Totton.

I certainly don't see Sheffield justifying its own "spur", and it'd be hard to argue with a station at Sheffield Midland - given the costs caused by squeezing a High Speed line through Sheffield's valleys/ hills.

I did come up with a bit of a plan to get HS2 platforms into the existing Sheffield station. I may have accidentally deleted it, though. In any case it was on my home computer and I'm at work now, so wouldn't be able to access it in any case. Essentially it involved a bit of heavy engineering on the north throat to fully separate the two lines heading out that way, turning the single H shaped island platform (2-5) into 2 H-shaped islands (using the two sets of through tracks currently used for stabling on either side, and connecting the bays on 2-5), and 4-tracking the southern approach from Dore. HS2 would then make use of the existing approach lines between Dore (or somewhere near) and Brightside. Grade-separated junctions would then allow HS2 and the MML to diverge. It did involve curtailing Shrewsbury Road and Granville Road, though. It would have also meant compulsory purchase of the MacDonalds on Farm Road, along with that business premises next to it.

At the Select Committee hearings into HS2 a few weeks/months back, the representative from Sheffield (not sure which group) mentioned that putting HS2 through Sheffield CC would cost an extra £1 billion, but would provide an extra £4 billion of benefits. I've not looked into that too closely, but if true it would provide a compelling case (especially if that price tag were lowered).

I realise that Meadowhall is well connected into the existing infrastructure, and this is why I feel less strongly about this than I do about Leeds New Lane. The proximity of Meadowhall to the M1 also works in it's favour. However, I am still of the opinion that HS2 would be best serving city centres rather than out-of-town locations.
 

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
Leeds New Lane is not integrated with either bus or onward train transport. The travelators to me seem like a "fudged" solution, and would be one of the easiest things to drop in the desire to save money. I wouldn't count on the travelators being built. You would then be left without proper connection between trains.

The station as planned is not in the centre of Leeds, and would require a lot of land purchase. As I understand it, the UK HQ of ASDA is on part of this site, and I don't imagine them giving it up without a lot of compensation. It also straddles one of the main arterial routes into and out of Leeds (from the M621 and Beeston). Construction of the station in this location would cause a huge amount of disruption, and the compo for business/residents affected in the short term would be a huge part of the cost.

Hi there,
I'm not sure I agree with you. Have a look at the official map of the station plan:
Big pdf file

The site is as close to the city centre as possible and it is (once cleared of existing buildings) a flat a level building site. The plan also cleverly threads the station onto low rise and older existing buildings. The main site needed at the end of the terminus station is the Hindle Valves Ltd stuff. These are older buildings and businesses are generally far easier to persuade to move with a suitable cheque than more emotional homeowners.

None of the existing larger buildings are required to go. OK, there will be a challenge to overcome with the traffic and roads but that's going to happen wherever you build a city centre location.

The north end of the proposed HS2 station is actually then quite close to the new southern entrance of the current Leeds station and the proposed walkway between them looks quite feasible for general interchange.


The problem of using the site to the north of the existing station is that it is harder to get to in terms of threading the new tracks in and it's a far more complex build being multi-storey, multi functional and over the water.

I think the proposal is good compromise of functionality, interchange and cost.

For the approach, I would use the land over Whitehall junction, and then utilise the Leeds-Castleford line as far as the M1 in Hunslet. The two sets of tracks would diverge somewhere between Wakefield Road and the M1 (or wherever the existing bridges allow for it). I realise that this would limit capacity somewhat, but it shouldn't be too onerous. You would only need 3 HS2 services per hour (per direction), and assuming 3 classic services per hour on Leeds-Castleford only takes up 6 paths per hour.

That's pretty much the alignment proposed if I remember by Leeds geography. The official map Another big pdf shows the HS2 tracks alongside the Leeds-Castleford line. It seems there will be some realignment to make the existing 2 tracks and the new separated HS2 tracks fit but no major deviations.



Cheers,
Jason
 

GingerSte

Member
Joined
26 May 2010
Messages
292
Hi there,
I'm not sure I agree with you. Have a look at the official map of the station plan:
Big pdf file

The site is as close to the city centre as possible and it is (once cleared of existing buildings) a flat a level building site. The plan also cleverly threads the station onto low rise and older existing buildings. The main site needed at the end of the terminus station is the Hindle Valves Ltd stuff. These are older buildings and businesses are generally far easier to persuade to move with a suitable cheque than more emotional homeowners.

None of the existing larger buildings are required to go. OK, there will be a challenge to overcome with the traffic and roads but that's going to happen wherever you build a city centre location.

The north end of the proposed HS2 station is actually then quite close to the new southern entrance of the current Leeds station and the proposed walkway between them looks quite feasible for general interchange.


The problem of using the site to the north of the existing station is that it is harder to get to in terms of threading the new tracks in and it's a far more complex build being multi-storey, multi functional and over the water.

I think the proposal is good compromise of functionality, interchange and cost.



That's pretty much the alignment proposed if I remember by Leeds geography. The official map Another big pdf shows the HS2 tracks alongside the Leeds-Castleford line. It seems there will be some realignment to make the existing 2 tracks and the new separated HS2 tracks fit but no major deviations.



Cheers,
Jason

Hi, Jason.

Looking at the map, you're right about it not affecting the ASDA HQ. It will go over their car park a bit, but not the building. I can also agree with you on the buildings that would be removed under that scheme being less of a challenge.

A substantial portion of that terminus building (more than I thought) is going to be over the road, though. That is an extremely busy thoroughfare. I don't think building such a large structure over the road is going to be feasible in any way. You might get the foundations and columns in with limited road closures, but after that you're stuck. You wouldn't be able to lift in any of the beams or slabs/floor plates without taking possession of the road. It would be closed for months!

Plus you've got boatloads of services in the roads and footpaths round that area. I can't see them wanting a station overhead (or the railway wanting them underneath). Service diversions alone would eat millions.

As I see it, this site is a huge challenge that will eat money and deliver a less than ideally placed station.

I agree that threading the tracks into a terminus just north of Leeds Station would be difficult. The solution I outlined went over Whitehall junction (part of the reason behind a high-level station). However:
1. The land is controlled by Network Rail (who will be a lot more amenable to possessions for HS2 than whoever runs the road under New Lane Station (either Leeds CC or the Highways Agency).
2. This has been done before. See the bridge over the triangular junction just west of Stratford Station. This one carries a road instead of a railway, but the gist is the same.

Re: your point on complexity. New Lane Station would be multi-storey and multi-functional, and over the main road. I have shown my suggestion over the water as I'm not sure of the width of the car park, but it might not be the case. Even if it was, cantilevering a few metres over the River Aire will be far easier than over the road. The river is not trafficked. You can put pontoons on the river if necessary. Plus all the reasons I've mentioned for the road.

All the best.

Ginger.
 

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
Hello Ginger,

A substantial portion of that terminus building (more than I thought) is going to be over the road, though. That is an extremely busy thoroughfare. I don't think building such a large structure over the road is going to be feasible in any way. You might get the foundations and columns in with limited road closures, but after that you're stuck. You wouldn't be able to lift in any of the beams or slabs/floor plates without taking possession of the road. It would be closed for months!

It's really not as much of an issue as you think. The HS2 station is going to be some 8 to 10 meters above the existing land so it'll be built on a viaduct. This actually poses less trouble to build than you'd imagine.

One possible technique is to build the platform next to the area you want it to be in and then slide/push it into place. The plans show the station is due to go above a busy junction (I know it reasonably well). What you could do is clear the Hindle Valves site, build support beams there and with limited road alterations on the other side of the road junction. You then build the platform on the Hindle Valve site then once it's complete close the road for 24 hours and slide it into place above the road junction. You then build the next structure in the same place but this time it doesn't move.

The site has plenty of scope for this to happen to cross over all of the roads in the area. Done well, and I don't doubt the contractor's abilities, there would be minimal road disruption and maybe less than 48 hours road closure. Frankly it'd be less disruptive than the gas pipe works that have been going on there this year.

There are numerous examples of this technique but there are some good pictures and videos on the Nottingham tram extension website
showing what can be done.

EDIT:
Oh my, I didn't know something. They didn't even close the road underneath the Nottingham bridge whilst they slid it into position!

Cheers,
Jason
 
Last edited by a moderator:

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
How does this design allow HS2 Phase 3 trains to run to Newcastle without reversing?

Confused.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,293
How does this design allow HS2 Phase 3 trains to run to Newcastle without reversing?

Confused.

They don't go into Leeds, they proceed directly to York diverging on a branch south of Leeds station.
 

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
Fine, so what about Leeds-Newcastle HSR connectivity?

Hi there,
At the moment there isn't any.

The view seems to be that HS services would go from Sheffield and go onto conventional tracks at Church Fenton so if you're going Leeds <--> Newcastle you may as well use the existing services.

This map Really big pdf shows the "Y" junction layout just south of Leeds.

I believe there is an effort to at least make provision for a chord so that when/if HS3/4/5/6/7/etc is put in place northwards that it is possible to access Leeds, albeit with a reversal.

Cheers,
Jason
 

GingerSte

Member
Joined
26 May 2010
Messages
292
Hello Ginger,



It's really not as much of an issue as you think. The HS2 station is going to be some 8 to 10 meters above the existing land so it'll be built on a viaduct. This actually poses less trouble to build than you'd imagine.

One possible technique is to build the platform next to the area you want it to be in and then slide/push it into place. The plans show the station is due to go above a busy junction (I know it reasonably well). What you could do is clear the Hindle Valves site, build support beams there and with limited road alterations on the other side of the road junction. You then build the platform on the Hindle Valve site then once it's complete close the road for 24 hours and slide it into place above the road junction. You then build the next structure in the same place but this time it doesn't move.

The site has plenty of scope for this to happen to cross over all of the roads in the area. Done well, and I don't doubt the contractor's abilities, there would be minimal road disruption and maybe less than 48 hours road closure. Frankly it'd be less disruptive than the gas pipe works that have been going on there this year.

There are numerous examples of this technique but there are some good pictures and videos on the Nottingham tram extension website
showing what can be done.

EDIT:
Oh my, I didn't know something. They didn't even close the road underneath the Nottingham bridge whilst they slid it into position!

Cheers,
Jason

I didn't realise that the road was kept open either. (Was it kept open, or was that just construction traffic?) I imagine the risks were lower, as the road is such a small proportion of the overall span, so the cantilever would be a fraction of the size of the back-span.

The bridge slide you linked to was the steel skeleton of the bridge. The permanent formwork and slabs were added later. The span over the road might have been different, but that wasn't the difficult cantilever span anyway. Possessions will be required to put in the permanent falsework and probably to cast the slab too (assuming a composite steel-concrete bridge).

With Leeds New Lane, instead of a bridge you will have a building. As for Nottingham you might be able to slide a steel skeleton out, but not a whole building with platforms, slabs under tracks, walls, electrics, plumbing, etc. All of that would have to be added later, or you'd be risking cracking of any finishes as the cantilever deflects. So a small proportion of the work could be done by sliding, but the majority of the station construction would need to be done in-situ. Unless you had a massive crash deck underneath (spanning over the road), you'd be risking dropping all sorts of stuff on Joe Public.

Two other things (which I've just remembered):

That roundabout is a very small area for such a large construction site. Getting materials on and off site, and storing them is going to be fun!

You would also have fun with the traffic using the station when it opens. That's going to cause a lot of problems on its own.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
I did come up with a bit of a plan to get HS2 platforms into the existing Sheffield station. I may have accidentally deleted it, though. In any case it was on my home computer and I'm at work now, so wouldn't be able to access it in any case. Essentially it involved a bit of heavy engineering on the north throat to fully separate the two lines heading out that way, turning the single H shaped island platform (2-5) into 2 H-shaped islands (using the two sets of through tracks currently used for stabling on either side, and connecting the bays on 2-5), and 4-tracking the southern approach from Dore. HS2 would then make use of the existing approach lines between Dore (or somewhere near) and Brightside. Grade-separated junctions would then allow HS2 and the MML to diverge. It did involve curtailing Shrewsbury Road and Granville Road, though. It would have also meant compulsory purchase of the MacDonalds on Farm Road, along with that business premises next to it.

At the Select Committee hearings into HS2 a few weeks/months back, the representative from Sheffield (not sure which group) mentioned that putting HS2 through Sheffield CC would cost an extra £1 billion, but would provide an extra £4 billion of benefits. I've not looked into that too closely, but if true it would provide a compelling case (especially if that price tag were lowered).

I realise that Meadowhall is well connected into the existing infrastructure, and this is why I feel less strongly about this than I do about Leeds New Lane. The proximity of Meadowhall to the M1 also works in it's favour. However, I am still of the opinion that HS2 would be best serving city centres rather than out-of-town locations.

If we are worrying about the disruption caused by closing some roads in Leeds over a weekend, then this scheme would close most of Sheffield Midland for months.

Meadowhall is good enough for me, especially as i means not needing to shut anything down in Sheffield
 

billio

Member
Joined
9 Feb 2012
Messages
575
Hi there,
[Leeds - York - Newcarstle]
At the moment there isn't any.

The view seems to be that HS services would go from Sheffield and go on to conventional tracks at Church Fenton so if you're going Leeds <--> Newcastle you may as well use the existing services.

That's interesting because according to the HS2 representatives at a meeting on Monday, HS2 will eliminate standing passengers in the rush hour into Leeds. I fail to see how a service to Sheffield Meadowhall and beyond will achieve this.

A reduction in London trains from the Leeds City station might free up some capacity on the line to Wakefield, but practically all existing trains will have to run to serve the places not covered by HS2.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,293
You wouldn't have much end to end traffic on the XC services since the Birmingham-Newcastle trains won't run through Leeds city any more.
 

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
Hi there,
At the moment there isn't any.

The view seems to be that HS services would go from Sheffield and go onto conventional tracks at Church Fenton so if you're going Leeds <--> Newcastle you may as well use the existing services.

This map Really big pdf shows the "Y" junction layout just south of Leeds.

I believe there is an effort to at least make provision for a chord so that when/if HS3/4/5/6/7/etc is put in place northwards that it is possible to access Leeds, albeit with a reversal.

Cheers,
Jason

Thanks Jason.

Well that seems like a deeply shortsighted view: Euston to New Street (112m 73ch) is comparable to Newcastle - Leeds via York (105m 62ch) - so the current best time of 83 mins (0645 ex-Newcastle) could be expected to fall to a similar value of Euston to New Street via HSR of 49/50 mins.

Now, it may be that the 4 mins to change ends at Leeds and double back down the HSR is the most cost effective way of providing the service, but the costs are going to be pretty high anyway, so I wonder why HS2 are proposing this rather than a through station at Leeds, clearly setting their sights on Newcastle and Edinburgh.

At 82 mins to Leeds (New Lane) 4 mins dwell and 50 mins to Newcastle, a total HS time of 2h 16m is an improvement on the 2h 47m best (and generally 3h 15m) in the public timetable ex-London (1800 dep KX). But perhaps less well then you might expect - I suppose it illustrates that the extra distance c. 325m vs ECML 268m 56ch.

Interesting times!

Tobbes
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Especially, if this report is to be believed, the average London-Newcastle time will be 2h 35m when IEP comes into operation, down from 2h 52m; 3h 15m is the slow service. Currently the Flying Scotsman is timetabled for 2h 37m with a 91, so I don't know what that will go down to. A whole new phase of HS2 to achieve 2h 16m doesn't seem worth it, to be honest.

https://www.gov.uk/government/news/...ht-for-more-state-of-the-art-intercity-trains
 
Last edited:

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
Especially, if this report is to be believed, the average London-Newcastle time will be 2h 35m when IEP comes into operation, down from 2h 52m; 3h 15m is the slow service. Currently the Flying Scotsman is timetabled for 2h 37m with a 91, so I don't know what that will go down to. A whole new phase of HS2 to achieve 2h 16m doesn't seem worth it, to be honest.

https://www.gov.uk/government/news/...ht-for-more-state-of-the-art-intercity-trains

I expect it will come down to the C-word again. Capacity. Certainly routing London-Newcastle-Edinburgh trains via Birmingham is never going to be the most efficient route, but if we need to free up ECML capacity for regional/commuter/freight services, punting the Intercity stuff onto HS2/3, even via Birmingham, might be a viable prospect.

Of course, it's not just about London journeys, an HS line from Leeds on to NCL/EDB would permit fast services to/from Birmingham.

As an aside, how far south is the Y-split? Specifically, will it be worthwhile/possible to run HS trains between Manchester and Leeds?
 