Actually, it's not. The latest Treasury estimate is that HS2 will cost £73bn.It's not an £80bn project though, that's an outright lie by the Institute for Economic Affairs
Actually, it's not. The latest Treasury estimate is that HS2 will cost £73bn.It's not an £80bn project though, that's an outright lie by the Institute for Economic Affairs
Actually, it's not. The latest Treasury estimate is that HS2 will cost £73bn.
so I can't buy the "starve other railways" argument.
adjusted for inflation, £43bn at either today's prices or possibly those from a few years back. i.e. they have estimated inflation which is never a good idea
It's probably a bad time for me to also say that I am a firm believer that we need to also upgrade a lot of our road network too.
God knows what anyone against high-speed rail would say to that suggestion!!
(Actually, they might prefer it if they can use those roads themselves)
TBF, the M1 seems (in places) quite a lot better than I remember it from a few years back. However, the A14 certainly needs sorting out
Since when is Lichfield 'Birmingham'? I guess it is like the M1 ending in Leeds - having bypassed the city and merged into the old route to further north, only Lichfield is much further away from Birmingham than Hook Moor is from Leeds.Phase 1 does finish in Birmingham.
Assuming you are talking about Birmingham, rather than the fork-junction at Lichfield, then this is thanks to anti-HS2 flavour-of-the-month Darling (and others) blocking Birmingham City Council/Arup's Grand Central plans.It finishes in a way which integrates poorly with the existing rail services.
All of them will - otherwise Curzon Street will quickly fill up with trains...When Phase 2 arrives, are services going to run into Birmingham and out again - not very many of them, if any.
That's incredibly deliberate, with the exception of at stations (where passengers can transfer between lines), it is far far better to be separate as much as possible. It keeps costs down, it keeps existing passengers from being inconvenienced, it allows better routes than our Victorian forebears chose.You could look at the proposed HS rail network and see that the design is meant to be independant of the existing rail network.
So what you are saying here is that this disgraceful 2-network plan can't be implemented and it will not function as a separate network*. Well surely either this point is a good one, or your last one is - you can't have both as they are mutually incompatible.So we will end up with two networks, the HS network and the "old" network, with the HS network running over some old network lines because we cannot afford to develop a full network (the North east, Scotland).
<citation needed>What will happen in the long term is that the old network will be starved of funds and suffer accordingly.
Actually, it's not. The latest Treasury estimate is that HS2 will cost £73bn.
Just heard Angela Eagle on BBC News talking about their support for what she kept calling "the north/south railway". I wonder if the pro-lobby has forced (paid?) her to stop using "HS2" ?
I am anti-HS2. £80bn for a London-Birmingham shuttle bus is obscene
Just heard Angela Eagle on BBC News talking about their support for what she kept calling "the north/south railway". I wonder if the pro-lobby has forced (paid?) her to stop using "HS2" ?
You still have not answered the point about how much your upgrades to the existing infrastructure would cost and exactly how much benefit it would bring. If you think HS2 is such a waste of money surely you have done a cost to benefit ratio of upgrading the WCML? Could you please provide with those figures. Otherwise your claims are completely meaningless.
Plus this is complete rubbish its £43bn for the full Y network your statements make your argument even more disingenuous.
TBF, the M1 seems (in places) quite a lot better than I remember it from a few years back. However, the A14 certainly needs sorting out
Treasury figures are within my range, see above.
I would spend small and focused. So £10m on five new stations, and then a controlled budget thereafter on focused areas across the network. I won't spend £80bn on a cross-fingered experiment.
I would spend money on new rolling stock. I would connect existing towns to the network. I won't spend money on a London-centric expressway.
And how will that tackle overcrowding on the WCML?
Apologies at this stage it is around 10% and will remain at the till completion (source Dft website) it started at 66%. And they have added another 23% contingency to that so we should be okay in terms of pricing they are going high now with the hope that when its done they can go, look we did it for 6 billion less aren't we geniuses?
If HS2 is scrapped then this country is doomed pretty much. It will show that we can't do big infrastructure projects as the antis will just get in the way all the time. The same thing is happening for power at the moment. People don't want wind turbines ("blot on the landscape"), dont want nuclear ("scared of it"), dont want fracking ("causes earthquakes and damage to water supply") so how are we supposed to feed our insatiable desire for electricity? Same is happening with rail. We are the laughing stock of the world with our transport network. And the main heart of our rail network, the WCML is near bursting point.
So the antis say that it is a "white elephant" and will cost far far too much and won't provide value for money. Current cost is £43bn with around £7bn contingency fund not £80bn which is a figure that has been cobbled together and includes Cross rail 2 which probably won't even go ahead!!
Can the antis please provide proof that your idea to upgrade the WCML to will cost less than HS2 and provide the same capacity benefits (ie a better cost to benefit ratio), and can you also please show that these capacity benefits will be good enough to last the next fifty years or so. If you cannot show that then your arguments are meaningless.
Oh please, having HS2 or not is not going to make us the laughing stock, having a £40bn version of Ciudad Real, will make us a laughing stock. We are a small country, with a high population, and population densities and distributions that are not ideal for high speed rail.
The optimised alternative costs £2.062bn, so even if it overspends by a factor of 20 it's still below the current estimated cost of HS2, with a BCR of 5.17.
I think you are missing the point of what a BCR is. Having a larger or smaller BCR does not mean the benefits are the same, its the ratio of benefits to costs.
One question whos 25 year passenger figures are right, DfT, Network Rail or HS2? ok we won't know for 25 years and you may as well throw darts at paper on a dart board, but to turn your statement round, if you can't show the capacity step change is needed over and above what can be cost effectively got out of the current network, there is no argument for HS2.
We are a small country, with a high population, and population densities and distributions that are not ideal for high speed rail.
That's true. What we really need is to build a new high-capacity line then.
Oh, wait...
Expand the WCML where possible.
That's true. What we really need is to build a new high-capacity line then.
Oh, wait...
PR1Berske said:We can explore where and how to explore widening/exploring the WCML where possible.
Bonemaster said:We are in a country that has excellent links too and from London, travelling East to West or vice versa is abysmal, i'm quiet firmly in the camp that if we are going to spend £40bn on railway infrastructure, we can do pinch point alleviation, rolling stock enhancement, and several smaller projects, get better BCR, provide enhanced spread of the economic benefits and get a better engine for growth through our railway system, and provide enhanced social economic benefits.
Can you work out where, and what benefits it will bring.
How new stations will affect paths, how you increase capacity, and how you do it in stages (often requiring a load of work just to move existing things to keep stuff moving, like when you widen a road like the M25 and M1 - and that's often just moving concrete lane dividers, not tracks and overhead wires) without bringing things to a standstill?
Then put a rough cost to it. Oh, and perhaps ask Mr Darling and the IEA what they think, as you obviously think their thoughts are valid in bashing HS2 so it would be rude not to consult with them. The IEA wants to reduce all expenditure and reduce taxes - so it's pretty obvious that they'll give a resounding NO to your WCML idea anyway, or triple the cost.
Also, check that you won't have all the residents and businesses around the WCML setting up protest groups and saying 'No to WCML upgrade' - or factor in the legal challenges that will follow.