That is what HS2 ltd is quoting although I doubt it would actually happen but it does mean that a supposed 'freed path' isn't.
Those are not the paths I am referring to, the paths I am referring to are possible efficiencies on the Manchester/Birmingham routes.
The trains going north of Manchester are frankly a rounding error compared to that.
HS2 trains aren't planned to stop anywhere between Preston and Carstairs.
Have you actually read any of the HS2 documents?
Those are not choices for HS2 Ltd to make, those are choices that will be made by the eventual franchisee.
There is no engineering reason that the train will not stop additionally as they do now, so you can't really attack the project for it.
The stopping pattern is merely representative of what they think would happen, not that they are going to "force" the franchisee to implement.
Should the Manchester HS2 service not have restaurant services because they are 'only' 68 minutes? I didn't say restaurant service - simply first class.
It should probably not have a full restaurant no, simply because the length of the journey does not really allow a restaurant service to be efficiently used.
I would expect catering but nothing as extensive as what is provided now.
And there would be a far smaller proportion of first class seats as a percentage of the total provided.
Find me somewhere else on the rail network where a train with maximum travel times of an hour that have full restaurants?
And first class on the Class 350s will be fairly reasonable, it could easily be of the standard of the Class 185s that TPE run.
Firstly, what are The service provided by LM on the 350s is simply not up to the standard expected by the numerous first class passengers on the route.
Who said they would be LM Class 350s?
I would expect today's London Midland to not exist after HS2 opens, there will likely be a unified ICWC-South franchise.
They would likely have interiors similar to TPE ones, or if it such a problem you could just have 444-esque multiple units.
It isn't just Coventry, there is Wolverhampton, Milton Keynes (particularly northbound) and Rugby. Network Rail's indicative plan has 3tph ICWC to Birmingham...
Wolverhampton passengers will for some reason chose to ride all the way to Birmingham on a slow train that takes 85 minutes for the final leg rather than making a ten minute transfer to a train that will take <50 minutes for the same journey?
As to Rugby.... going south London will only be five minutes further away than it is now, which is not really a major sacrifice. (110mph Class 350s take 56 minutes instead of 51).
And Milton Keynes will still have plenty of northbound trains either way.....
And Network Rail has to develop a plan based upon the premise that the NIMBYs win... that is their duty.