I was setting the record straight for what was a baseless assumption.
The whole 'making better use of WCML capacity (sic)' is supposed to be about providing more services to the likes of Northampton and faster services to the likes of Hemel.
You do remember the recent '10 busiest services in the south east' ? Two of which were Northampton trains. Given how busy the services are currently and the predicted growth in rail use (used to justify HS2 in the first place), you don't see the contradiction in suggesting less capacity on the route?
It's also possible that with the total electrification of the Manchester to Bournemouth route and likely electrification of the remainder of the XC long-distance routes by the time HS2 is operational that the pendos could be cascaded there.
Do you think that Pendos could be modified to go on the third-rail section between Southampton and Bournemouth (at lower speed, obviously) or have I missed an announcement?
Is it? I thought electric spine went only as far as Southampton. That's (good) news to me!Electric Spine is going to see conversion between Bournemouth and either Southampton or Poole from 750V third rail to 25kV AC.
To ease power supply issues, allow expansion of freight operations and because it is apparently cheaper to convert than to renew the current high power 750V installation.
Is it? I thought electric spine went only as far as Southampton. That's (good) news to me!
Oh wait, sorry, I messed up.
I got confused between Bournemouth and Basingstoke.....
(in my defence it is 0432...).
I do believe that conversion to Bournemouth or even Weymouth has been floated as an add-on however, as it would rather nicely take care of that entire "arm" of the system in one move.
BBC said:The proposed budget for the HS2 railway has risen by nearly £10bn to more than £40bn, the transport minister has said.
Patrick McLoughlin told the Commons the new projected cost of £42.6bn, up from £33bn, would include a large "contingency" fund. He said the final cost could be lower than the new estimate, but said revising the figure was "right". Some Conservative MPs are expected to vote against the High Speed Rail (Preparation) Bill later. The new high-speed railway line is intended to link London to Birmingham by 2026, with branches to Manchester and Leeds, via Sheffield, planned by 2032. The first phase budget is now £21.4bn, with £21.2bn for phase two. These figures include a contingency fund of £14.4bn across the scheme. (See More)
A rise in the estimated cost nearly a quarter at a very early stage in the project. If it wasn't one already, HS2 would be turning into a white elephant!
One MP demanded that a station be built at Crewe as an interchange (similar to that in the detailed plans, perhaps?)
What hope do we have.
Your current signature is most relevant at this moment!
Erm, the 'plans' don't include a station at Crewe. HS2 dives under. A spur takes CCs into the existing station. This is what the man is on about:
ignored by HS2 Ltd. https://www.gov.uk/government/upload...-for-crewe.pdf
The contingency does seem to be inordinately large now.
I think they are just setting it up to come in "under budget" to get a positive spin from it.