Stafford will recieve 1 HS2 service per hour in each direction. On London - Liverpool trip from phase 2.
not if the Liverpool Phase 2 services join HS2 at Crewe not Lichfield; as has been confirmed by Oakervee.
Stafford will recieve 1 HS2 service per hour in each direction. On London - Liverpool trip from phase 2.
not if the Liverpool Phase 2 services join HS2 at Crewe not Lichfield; as has been confirmed by Oakervee.
"Never let the facts get in the way of a good story". There was a similar fuss in Letchworth when the Hitchin flyover was built.
Yes, there will be 2tph from liverpool, one connecting at crewe one connecting at lichfield via stafford.
Look at DFT ecnomic case for HS2.
Let me get this right, are they now thinking of connecting HS2 at Crewe instead if the original plan of Lichfield?.
Has anybody seen a map of this route?
Looks like the current plans *officially* have grown..."the HS2 high speed rail link is to be extended to North West and West Yorkshire" according to the BBC from the Autumn statement by Osborne.
I think you'd be correct in assuming that.@xolotl: "Does anyone know what this could be? It wouldn't surprise me if it simply refers to the announcement for the route of phase 2."
Why does there need to be a new station? Doesn't sound like an integrated transport policy. Unless it's next to the bus station.
Why does there need to be a new station? Doesn't sound like an integrated transport policy. Unless it's next to the bus station.
The existing station simply doesn't have the room or the capacity - HS2 will need a number of 400m platforms built to the same standards as the rest of the high speed network, served by lines built to a larger european loading gauge.
Chris
4. Central's taken: There's plans for a several hundred millionpond redevelopment of the West End that would cost far too much to buy out. Not only would you have to buy the land, you'd have to demolish many high-vale office buildings, and still have the access problems above.
I thought Leeds Central had now become the Ilkley/Skipton terminating platforms plus the multi storey car park?
The station build at Crown Point will, with a connecting footbridge over the Aire, be about 200m from City station. It's not a problem.
IF you are going to put a station in Leeds, then a) it needs to be a through station, IMHO and b) it needs to serve the north of the city centre. Dropping people off in Crown Point will serve no one except those wishing to visit Argos. For both those points, one should realise that the expansion of Leeds into a "financial centre" in the 90's stalled badly around 8 years ago. Government and commercial interests are pulling back to London.
A really imaginative and helpful site for an HS2 station would actually be in neighbouring Bradford. More space, more opportunity for redevelopment, more workforce. And a more sensible onward route round the South and East of Leeds. As either of the South Leeds sites would require additional rapid transit provision to get anyone where they actually needed to be, the similar requirements for Bradford would not be too much extra.
IF you are going to put a station in Leeds, then a) it needs to be a through station, IMHO and b) it needs to serve the north of the city centre. Dropping people off in Crown Point will serve no one except those wishing to visit Argos. For both those points, one should realise that the expansion of Leeds into a "financial centre" in the 90's stalled badly around 8 years ago. Government and commercial interests are pulling back to London.
A really imaginative and helpful site for an HS2 station would actually be in neighbouring Bradford. More space, more opportunity for redevelopment, more workforce. And a more sensible onward route round the South and East of Leeds. As either of the South Leeds sites would require additional rapid transit provision to get anyone where they actually needed to be, the similar requirements for Bradford would not be too much extra.
Oh I am sorry where is the extra couple of billion going to come from to build a high speed underground through route?
I think it's in the same room as the realisation of most people in the forum that is lacking for the realisation of the additional regulations and costs surrounding sub surface railway stations?
Speaking to people at engineering firms recently it has been leaked to them that the station is to be built over the current station.
For my HS2 proposal at uni i slotted it in that big bit of derelict land where leeds central used to be with low level platforms for A&W and harrogate lines to free up space at Leeds.
--- old post above --- --- new post below ---
There is no route out of the North of Leeds. Trust me i have spent hours trawling through map after map after map. Only solution i came up with was to build track over the existing to neville hill depot. Decided against it.
But it doesnt need to be a through station. Newcastle trains are not intending on stopping at Leeds. It seems to me the spur will be built to York sout of leeds but north of sheffield.