This probably sounds daft, but I had a dream about this and it worked in the dream :p where you have a high speed train running at 250mph from London to Glasgow - as it reaches the midlands, the couplers split, with the front half still going 250mph, and the rear end just coasts with no power and lands in Birmingham. Not sure how they'd get back!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
This probably sounds daft, but I had a dream about this and it worked in the dream :p where you have a high speed train running at 250mph from London to Glasgow - as it reaches the midlands, the couplers split, with the front half still going 250mph, and the rear end just coasts with no power and lands in Birmingham. Not sure how they'd get back!

The GWR was ahead of you on that one! :D

GWslip.jpg


(From Weymouth Model Rail Association website)
 

Ivo

Established Member
Joined
8 Jan 2010
Messages
7,307
Location
Bath (or Southend)
Just thinking about that South Coast idea, what chance is there of a 140mph route on the South Coast alignment? Rather than go into Portsmouth though, why couldn't it skirt around the north of the area and stop somewhere around Cosham?

Having said that though, I wouldn't fancy its chances in Brighton. I think a linespeed upgrade would be better, and then have almost exclusively fast trains into Brighton and also the slows into Hove - except for a local service to probably Haywards Heath only, which would be timed to leave BTN and HHE just after the Express would. But anyway, back on the main topic...

This probably sounds daft, but I had a dream about this and it worked in the dream :p where you have a high speed train running at 250mph from London to Glasgow - as it reaches the midlands, the couplers split, with the front half still going 250mph, and the rear end just coasts with no power and lands in Birmingham. Not sure how they'd get back!

I've had ideas like that from dreams before now :p

Remember this folks?
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
This probably sounds daft, but I had a dream about this and it worked in the dream :p where you have a high speed train running at 250mph from London to Glasgow - as it reaches the midlands, the couplers split, with the front half still going 250mph, and the rear end just coasts with no power and lands in Birmingham. Not sure how they'd get back!

That was the Brighton Railway's idea!
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,408
Location
Taunton or Kent
I'd like to see a MAGLEV high-speed line built here. :D

But, knowing costs, and testing requirements, it would probably take a very long time before it's even proposed.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,863
Location
UK
Even if we built a super highway for cars that was 6 lanes wide, you'd still get idiots hogging lanes 5 and 6, so you'd still get nowhere unless you undertook everyone.

I'd fancy my chances better with rail travel taking lots of cars off the road - so we could make do with smaller roads (and perhaps more of them) than fewer massive motorways that work okay until something happens and you don't move for hours.

As mentioned above, any new super fuel could surely be used by rail (and air). I am sure battery technology will have advanced significantly by 2030, so we'll have batteries that last longer and charge quicker (even perhaps using inductive charging as you drive) and can worry about producing electricity at a single source than lots of engines in the vehicles themselves. I may of course be totally wrong!
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Even if we built a super highway for cars that was 6 lanes wide, you'd still get idiots hogging lanes 5 and 6, so you'd still get nowhere unless you undertook everyone.
Not if they were all driverless cars. By the time any new fuel source is ready to completely take over it's likely that cars will be driverless. This will not only result in a road having the potential for more capacity but also higher speeds.
--- old post above --- --- new post below ---
I'd fancy my chances better with rail travel taking lots of cars off the road - so we could make do with smaller roads (and perhaps more of them) than fewer massive motorways that work okay until something happens and you don't move for hours.
It's not just cars that would need taking off the road though, quite a few motorways are often full of trucks.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Not if they were all driverless cars. By the time any new fuel source is ready to completely take over it's likely that cars will be driverless. This will not only result in a road having the potential for more capacity but also higher speeds.
--- old post above --- --- new post below ---

It's not just cars that would need taking off the road though, quite a few motorways are often full of trucks.

Driverless cars would have to conform to such high engineering and maintenance standards that it is unlikely they could ever be owned and maintained as a car today is.
Probably far more like those experienced by aviation than conventional ground transport.
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
I want to state that there's problems with a HS line from London to Glasgow. Trains always stop at Preston on the WCML and York on the ECML and due to a lack (it would be pointless) of through tracks, I'm presuming that 6 and 7 at PRE and whatever at York would need dramatic modifications.
I would also support the idea of Lancaster-Newcastle/Sunderland operated on a straight line by Northern Adelantes and one of the Callie sleepers. (there's two so we're fine). This could be operated by HS2 or a future HS3.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
I want to state that there's problems with a HS line from London to Glasgow. Trains always stop at Preston on the WCML and York on the ECML and due to a lack (it would be pointless) of through tracks, I'm presuming that 6 and 7 at PRE and whatever at York would need dramatic modifications.
I would also support the idea of Lancaster-Newcastle/Sunderland operated on a straight line by Northern Adelantes and one of the Callie sleepers. (there's two so we're fine). This could be operated by HS2 or a future HS3.

Trains can run through any line at Preston non-stop, 3 or 4 would be fastest though. They don't have to call when they pass through a platform. Further, the 0540 EDB-KGX Monday-Friday runs non-stop through York.

You want to use Adelantes on a High Speed line between two places with no real need for a direct service, as well as building it through some of the harshest landscapes in Britain...?
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
Trains can run through any line at Preston non-stop, 3 or 4 would be fastest though. They don't have to call when they pass through a platform. Further, the 0540 EDB-KGX Monday-Friday runs non-stop through York.

You want to use Adelantes on a High Speed line between two places with no real need for a direct service, as well as building it through some of the harshest landscapes in Britain...?

They can't operate at decent speeds, so they stop. (At least, except one of the callies)
If they can get through the landscape, I'm in. 395s would be the best, maybe 390s.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
They can't operate at decent speeds, so they stop. (At least, except one of the callies)
If they can get through the landscape, I'm in. 395s would be the best, maybe 390s.

Preston isn't that slow, 30mph~ IIRC both ways, though I suspect it may be more. Further, Preston is also used to change crew on all VWC services (or at least those coming from / going further north than Lancaster), hence all trains call.

http://maps.google.co.uk/?ll=54.372559,-1.625977&spn=1.134337,2.90863&t=h&z=9 - I suspect it would be possible to build a line through that, though I wouldn't expect it to be very High Speed or cost less than several hundreds of millions of pounds.
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
Preston isn't that slow, 30mph~ IIRC both ways, though I suspect it may be more. Further, Preston is also used to change crew on all VWC services (or at least those coming from / going further north than Lancaster), hence all trains call.
It was 10 last time I checked. It's probably 30 now though, considering the safety of the new and improved station.

http://maps.google.co.uk/?ll=54.372559,-1.625977&spn=1.134337,2.90863&t=h&z=9 - I suspect it would be possible to build a line through that, though I wouldn't expect it to be very High Speed or cost less than several hundreds of millions of pounds.
True, trains can just use the Hexham line, sleepers can and the Cumbrian Coastliner can be extended to Sunderland, provided it doesn't clash with anything else.
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
After the derailment in the 18-19 hundreds, I think. I just don't see a need for Preston being a through, infact Preston needs a second station tbh (Cadley Parkway, Maudlands, Riversway, Lea Road, or Barton Grange Parkway spring to mind)
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Thanks. So it is possible to operate non-stop but they don't.

It is possible to operate through any non-terminal station non-stop, but as I have said, the majority of VWC services change crew here, and it is a regional hub for local trains.
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
...and to an extent national hub. (Leeds, York, Scotland, Wolves, Birmingham, Coventry, London, Milton Keynes)
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Deleted, nvm.

Misunderstood something.
 
Last edited:

RYS

Member
Joined
11 May 2011
Messages
62
Location
Guess.
If HS2 is designed to relieve capacity issues on the lower WCML, then is it likely that one of the next parts of the network will be a line to relieve capacity on the lower ECML?

How about London - Stansted - Cambridge - Peterborough?

This would solve overcrowding on Cambridge and Peterborough services and relieve the Welwyn bottleneck. Obviously services could then continue north on the ECML after PBO. I can see this line being much much cheaper to build than HS2 (flatter terrain, no expensive Y junctions). The only thing I'm not sure about, is that if all journeys to the North East and Scotland will be going via Leeds on HS2, will the ECML then already be under-utilised?
 
Last edited:

RYS

Member
Joined
11 May 2011
Messages
62
Location
Guess.
Your confusing outer suburban services with intercity services there.

I'm not sure I understand your point. Do you mean there just aren't enough people to be moved over a great enough distance? My proposal would only have the 4 stations listed - no outer suburban service. The main point of the line would be to provide extra intercity capacity to the ECML destinations north of Peterborough, but with the added benefit of giving a proper intercity service to Cambridge and Peterborough (yes they are treated as outer suburban at the moment). The lower ECML then has paths freed up for more suburban and outer suburban services. As I said, the uncertainty I have is whether extra capacity to the North East will be needed given that HS2 is going there too.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
I'm not sure I understand your point. Do you mean there just aren't enough people to be moved over a great enough distance? My proposal would only have the 4 stations listed - no outer suburban service. The main point of the line would be to provide extra intercity capacity to the ECML destinations north of Peterborough, but with the added benefit of giving a proper intercity service to Cambridge and Peterborough (yes they are treated as outer suburban at the moment). The lower ECML then has paths freed up for more suburban and outer suburban services. As I said, the uncertainty I have is whether extra capacity to the North East will be needed given that HS2 is going there too.

Probably pointless, think about how many places 12-18 400m trains per hour can serve, especially as the captive ones could, and really ought to be, double decker.

Especially if we end up with a High speed route to Scotland via Newcastle as we would in any reasonable world.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
If HS2 is designed to relieve capacity issues on the lower WCML, then is it likely that one of the next parts of the network will be a line to relieve capacity on the lower ECML?

How about London - Stansted - Cambridge - Peterborough?

This would solve overcrowding on Cambridge and Peterborough services and relieve the Welwyn bottleneck. Obviously services could then continue north on the ECML after PBO. I can see this line being much much cheaper to build than HS2 (flatter terrain, no expensive Y junctions). The only thing I'm not sure about, is that if all journeys to the North East and Scotland will be going via Leeds on HS2, will the ECML then already be under-utilised?

From my point of view, yes please (although Cambridge might have to be missed out, since three stations seems a bit OTT). This gives East Anglia and Hertfordshire a decent link to Scotland and the North East without the hassle of having to go into London. The line could connect to Stratford and run direct to the Channel Tunnel, saving a lot of time by effectively bypassing London. Basically, the same function that Ashford and Ebbsfleet are supposed to perform for Kent, although there would be better connections. I'm also a bit sick of seeing the West Coast get all the investment, but that's beside the point.
--- old post above --- --- new post below ---
Probably pointless, think about how many places 12-18 400m trains per hour can serve, especially as the captive ones could, and really ought to be, double decker.

Especially if we end up with a High speed route to Scotland via Newcastle as we would in any reasonable world.

TBH, I very much doubt we'll see more than 12, with 10 likely (I originally reckoned on 6). A 5-minute interval service is probably as much as the slower sections can cope with. Old Oak-Euston will be the bottleneck on the new line, but the real problems will be further north. How many more trains can you get accross the KEVII Bridge at Newcastle? How many more can get through Crewe? A chain is only as strong as its weakest link. Unless you start rebuilding station approaches everywhere, then it's more a matter of diverting existing services via HS2 than increasing the frequency. I guess that would mean the end of Aberdeen trains stopping at Stevenage (assuming the SNP haven't cut them off at Edinburgh :roll: ).
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,863
Location
UK
Driverless cars would have to conform to such high engineering and maintenance standards that it is unlikely they could ever be owned and maintained as a car today is.
Probably far more like those experienced by aviation than conventional ground transport.

Tip; Don't get involved in a discussion about driverless cars.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
TBH, I very much doubt we'll see more than 12, with 10 likely (I or[/B]iginally reckoned on 6). A 5-minute interval service is probably as much as the slower sections can cope with. Old Oak-Euston will be the bottleneck on the new line, but the real problems will be further north. How many more trains can you get accross the KEVII Bridge at Newcastle? How many more can get through Crewe? A chain is only as strong as its weakest link. Unless you start rebuilding station approaches everywhere, then it's more a matter of diverting existing services via HS2 than increasing the frequency. I guess that would mean the end of Aberdeen trains stopping at Stevenage (assuming the SNP haven't cut them off at Edinburgh :roll: ).

Well we would have a new line with a new station in Newcastle :)

The proposal for using ERTMS L2 suggested that the bottleneck would likely be the Birmingham Triangle junction.

This line will never be full without intermediate stations but oh well, we must build a line exactly like the french one.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Probably pointless, think about how many places 12-18 400m trains per hour can serve, especially as the captive ones could, and really ought to be, double decker.

Especially if we end up with a High speed route to Scotland via Newcastle as we would in any reasonable world.

Double Decker trains sound good but you'd then restrict High Speed trains to only running on High Speed lines - which would complicate things.
 