• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

High Speed Rail 2 questions

Status
Not open for further replies.

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
I want to see more roads, rail and would hope we'd continue to be able to fly for many more years to come. I most definitely do not see rail as the only future, but for now we know air travel is getting more and more expensive so it's best to reserve that for routes where rail wouldn't be a viable option. When we can invent new ways to 'power' planes that is sustainable, perhaps we'll all fly everywhere.

HS2 to me isn't the be all and end all of transport for the future - and I hope it's the beginning (and supplemented by other improvements too) and in the grand scheme of things I don't think it's that expensive, or a waste of money. Most of the money is going to support industry and staff.

I am not sure how pro-HS2 supports are getting hysterical. I just see it as a useful route that allows the 'classic' lines to serve local users better when a heavy load is lifted off their shoulders - as those who want to go through can do so, fast, on other line (so, no, Philip Elliott I have not contradicted myself) . If it isn't built, so be it - but we'll just end up with a railway network that will eventually be unable to cope - just like not spending money widening motorways, building bypasses and so on for the roads.. or adding new runways and building new airport terminals. What will have to happen then is prices are forced up to price people off the railway to manage and control demand, as we already have at peak times.

Why must we have one or the other when discussing improvements for the future (and not just next week, but for future generations)? I'm a firm believer in integrated transport, and using the best means of transport for the need at the time. As I write this at 1am, if I need to get something now, I'll use my car. In the day to go to work, I'm taking a train as I'm not sitting in traffic, paying £10 congestion charge and a fortune for parking. To fly to see relatives in Sweden, I'll be flying... Oh, and very often, I'm using my legs and walking. Simple.

If the arguments against HS2 were purely down to cost I might understand it, but the real reason is the route. If HS2 was suddenly moved entirely - a new bunch of people would suddenly protest, and those who were against it might suddenly be quite happy. It really is as simple as NIMBYism in operation.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
9 Feb 2009
Messages
807
I am not sure how pro-HS2 supports are getting hysterical. I just see it as a useful route that allows the 'classic' lines to serve local users better when a heavy load is lifted off their shoulders - as those who want to go through can do so, fast, on other line (so, no, Philip Elliott I have not contradicted myself)

You've still not taking into account the 'Stoke question' - how do you allow these extra services and still keep or improve the service for Stoke?

Also you've still not taken on board that the traffic removed is not a heavy load - it's the minority not the majority.

tbtc has claimed on many occasions that HS2 will allow the East Coast to serve more locations. Again however, that is not possible witout destroying services to Wakefield and connections to the North-East and Scotland.

strangely silent about openings like Airdrie - Bathgate... still, everyone can pick figures to suit their argument.

Maybe it is because I haven't heard any figures for a service that has only run for 3 months and because of the late delivery of the 380s there aren't enough 334s to run a full service! Still you're quick to jump to conclusions...

Also the French described the usage of LGV Est as 'disappointing'.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
You've still not taking into account the 'Stoke question' - how do you allow these extra services and still keep or improve the service for Stoke?

When did Stoke decide the viability of HS2? I have no idea how to answer the 'Stoke question' as I never knew it existed.
 

Invincibles

Member
Joined
12 Jul 2009
Messages
511
Location
Suzhou, Jiangsu, China
Maybe a stupid question but...

Does HS2 have to start in London?

I suggested one route that started in the East of London to leave the current HS1 at a triangle junction and then head across the fens to Peterborough(ish) then up through Sheffield to Manchester (using Woodhead) and Leeds/Bradford (via a triangle near Penistone) allowing HS services between Manchester and Leeds as well as the London ones.

But thinking about the arguments above what about:

Closing London Euston - Watford Junction (more like the next station afterwards under the M25 but the name escapes me at the moment) and rejigging the formation to 3 HS tracks and 2 intensive use domestic lines (signalled like crossrail and thameslink to get maximum capacity).

Surely the cost of starting outside of London will massively reduce the number of tunnels and expensive land takes and allow the savings to be ploughed into getting further north quicker (including the leg through Stoke as discussed elsewhere ;) )

I appreciate that one of the arguments for HS2 is the ability to still have "intercity" services on the WCML that serve more stations. These could easily be extensions of the fast Northamptons and really do not need to be scheduled so fast between Watford and London. Some platforms at Euston would terminate the WCML services while others are devoted to HS.

Capacity into Euston would be improved by linking many services into Crossrail. While this would limit the number that run to Reading, extra provision could be made by extening Heathrow services. I believe Heathrow should actually be served by the GWML when it is upgraded (in the same way Shanghai Hongqiao has become an important station on the Chinese system).

I think that covers all of the impacts on services, but I am sure I have left huge gaps.

Obviously you would be looking at a lot more high speed capable EMUs to run the services through the core and on to Liverpool/Manchester/Wolverhampton on the classic WCML but I believe that it is not beyond engineers to get trains like the new Thameslink stock that can do it.

Pendolionos would all move the ECML or GWML except for a few which would provide MK to the main WCML terminii.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,857
Right, first of all there's one important problem. A growing human population is unsustainable, somebody needs to put measures in place to curb, and maybe even reverse, the population growth. Without that, it doesn't really matter what else we do, we'd be heading for massive food sortages and mass extinctions of wildlife due to climate change. Assuming you curb the population growth, the only additional capacity that will be needed is whatever modal shift can be extracted from air or car.

Our roads are very busy, which gives alot of potential for shift from car, but to attract some of that you need to serve more of the areas that Beeching deprived of railways, so it is not just a case of improving the trunk/intercity routes to take the extra traffic. Chiltern's evergreen programe will make their line more attractive, electrify it and lengthen the LHCS trains (which would then have 90 rather than 67 power) and you might be able to aleviate the WCML congestion, at least for a while. It might not be enough, and it only helps with WCML capacity, one reason why I object to HS2. In my opinion if we're going to need a new London - Birmingham - Manchester line we're probablly also going to need a new London - Reading line to releive the GWML, and maybe a London - Leicester - Leeds line.

This is reflected in my map of HS2 (skip this paragraph if you don't want to know the details), it starts just south of Reading, heads east to Staines, tunnels under Heathrow, climbs to run above the M4 (saving a bit of tunneling under London) and runs underground to Euston (which for HS trains would be a through station, minimising the amount of space needed to fit all the platforms for HS2 and WCML in). North of Euston, there would be a railway triangle, south for Euston and Reading, east for HS1 and north west to continue HS2. The route would then need to get out to Aylesbury somehow, and would then follow the Great Central to Rugby, with phase 1 then turning to follow the M6 to Birmingham, round Stafford, to the junction with the A500. Here a branch would diverge to Crewe to allow for Liverpool and north Wales coast trains to diverge (there'd be other links to classic lines too, I'm only mentioning the main ones). The main route would stick with the M6 to Holmes Chapel then following the existing railway for a bit, plunging into Manchester above and alongside the A34 and in tunnel before emerging on the other side and heading to either Wigan or Preston for onward use of the existing WCML. Back at Rugby, phase 2 would follow the Great Central and M1 through Leicester and Nottingham (difficult, as the Great Central trackbed doesn't seem to be there anymore) to Woodhouse (link with existing line into Sheffield). This line could later continue onto the Woodhead tunnel route to reach Manchester from the other direction, with another railway triangle in Manchester. Back at Woodhouse, the main line could continue to follow the M1 to Leeds, where the M621 would get it fairly close to the current station without tunneling. I had an alternative idea too, which was to put HS2 on the flatter East Coast as far as Retford, then cut across to Manchester, that might be cheaper than the west coast route to Manchester but might not be as fast as the WCML.

However, all of that which I called HS2 above is slightly mis-named. The problem is we're talking (with the exception of through trains to Scotland) almost exclusivly about modal shift from car. Without spending many billions more on a large amount of hydro electric, wave and tidal stream (NOT the same as wildlife exterminating barrages) power generation (some extended wind farms too, but wind is not reliable enough to generate more than about 12-20% of our current power needs) making these lines true HighSpeed could well make them more poluting than car travel. This is one reason why I would want a 140mph limit on these new lines. The slower speed would also allow sharper curves so it is easier to avoid expensive routes and sensitive areas like parts of the Chilterns. Even with a green power supply I'd say limit it to a 202mph top speed (INTERCITY 325 anyone?), which probablly gives more scope for avoiding said stuff than the government's desired 400kph top speed, and reduces power comsumption by a fair amount at the cost of only 1 or 2 minutes.

It is only modal shift from air that makes true HighSpeed enviromentally friendly, and there's no way you'd get enough shift to make HSR, on our dirty power generation mix, enviromentally viable without taxing aviation out of existance (which you may as well do anyway and save the cost of building the HSR lines).

There's also the possibility of using NOL Eurostars and HS1 to give a journey time of under 4 hours from Birmingham and (after it is electrified) Bristol to Brussels on existing lines, which has to have some scope for reducing short-haul flights (the trains would call at Rugby (Birmingham service only - obviously), Reading (Bristol service only - obviously), Stratford International (change for London, Ebbsfleet and Ashford), Lille (change for TGV to Paris) and Brussels (change for Thalys to Amsterdam)).
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
HS2 when fully built can help reduce the need to fly, which means those planes can serve other routes where you still need to. More people will leave their cars when they can get to, AND from, where they want to go - and at times they want to go (hence my suggestion of running trains on a new line later into, or all through, the night).

I do agree that we can argue about the route of HS2, but not the need to build new lines and I totally agree that we should be seeking to reinstate branch lines, to serve larger populations (many stations closed in the 60s, 70s and 80s are now near new build housing estates etc). I don't see HS2 as the only rail project for the next 20-30 years (God, I hope not). I also hope they'll have the means to begin doing bigger upgrades to the ECML and WCML when there's now another route to take away a lot of the load.

I can see the legacy lines continuing to run Intercity services as they do now, at similar speeds until we get new signalling on most lines, but at a lower frequency to allow on more stopping services and give, albeit slower, options to those living in smaller towns currently skipped to maximise the paths for the 'fast' trains. We should still seek to extend platforms on them, and maybe build new stations and interchanges.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Geezertronic you have said yourself the project would be a waste if it wasn't built as 4-tracks. I've drawn on a lot of information and working in the planning department of the intercity west coast operator I have the facts. It is you that is ignorant to make judgements without having the info to draw on.

No, being ignorant is stating that the project cannot work, will not work and should not be built. There is a vast difference between that and what I have previously said about HS2 being 4-tracks. HS2 in its current form is not perfect in my opinion but given the information available is required (not just as far as Birmingham either but to Manchester, Leeds and Scotland long term)and is certainly a far better alternative than any further major upgrades of the WCML and ECML with all of the disruption that would cause.

And to assume that I am making judgments without reading all of the pro and anti material that is publicly available shows that it is you that is ignorant. I am quite happy to discuss anything in a reasoned discussion and I don't have to work in the planning department of the intercity west coast operator to have a point of view due to the vast amount of information that is publicly available on the subject.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
I also would have considered it a good idea to be 4-track (if only for this first section which, when extended, will have the highest level of usage to/from London) and I still think a 24 hour service (or the option of having it, even if it doesn't start from day one) would also be essential.

But, we have to accept compromises - rather than simply do nothing at all.
 

j0hn0

Member
Joined
20 Jan 2009
Messages
563
Location
St Albans, England
So Phillip Morris of the planning dept, saying that doesn't make you right, only more parochial.

I just fail to see the need to read your rhetoric as it is going over the same debunked myths over and over agin.

I work for the consumers association therefore I am right

You see how we are not getting anywhere?
 
Joined
9 Feb 2009
Messages
807
It is plainly clearly not reading what I'm saying just what they want to hear.

I do agree that we can argue about the route of HS2, but not the need to build new lines and I totally agree that we should be seeking to reinstate branch lines, to serve larger populations

and is certainly a far better alternative than any further major upgrades of the WCML and ECML with all of the disruption that would cause.

Which part of ...

However I can see that are clear benefits to building a new line / adding capacity on a London - NorthWest alignment but the current plans are diabolical..

To get maximum benefit we need to be looking at a 'London to Wigan' route with a connection near Rugby for EBW services which would run along a 4-tracked route, a branch to Manchester (with through route capability) and loops to include Stoke & Milton Keynes. Then we *could* release the WCML from Intercity traffic.


...do people not understand?

Geezertronic my comment of cannot / will not is aimed at the fact that the project won't/can't meet it's aims - that is to increase patronage on intercity to London and 'local'/'regional'/'commuter' flows and promote modal change. The HS2 report itself suggests only 8% or so of traffic will me modal change - most will abtraction from the WCML and the the rest from totally new travel - encouraging new travel is not a green solution. (Would Birmingham have got Selfridges if it was such a short journey to London?)

To key problem with the plan is the 'Stoke question' or the 'Coventry question' or the 'Wolverhampton question' Jon I'm not sure why you can't understand the question - it is very simple. How do you keep a fast regular intercity service to Stoke, Coventry, Wolverhampton (plus Stafford/WArrington/Wigan/The Lake District/Milton Keynes northbound etc etc) and still provide the 'spare capacity' to add new services for Trent Valley stations for example? The answer is you can't - it is one or the other.

However, if you DID READ what I said you'd realise I mentioned building a London - Manchester route that called at both Stoke & Milton Keynes with connections at many places on the WCML (EBWs still to run via Coventry via a 4-track route). Therefore the current timetable could effectively run without even touching the West Coast south. Voila, spare capacity. Clearly consideration for both Watford & Macclesfield needs to be made.

IT IS TE CURRENT ROUTE / CALLING POINTS THAT IS THE BIGGEST ISSUE

and I still think a 24 hour service (or the option of having it, even if it doesn't start from day one) would also be essential.

You simply cannot do that with a 2-track railway particularly most of the stock couldn't be diverted over the WCML!

One tired argument that gets brought out again and again is 'disruption'. Tell me, do you think when the MML was 4-tracked in the Sharnbrook - Wymington area it was disruptive? http://www.streetmap.co.uk/map.srf?...archp=ids.srf&dn=831&ax=495541&ay=263826&lm=0

Let's not fall in the trap that HS2 will not be disruptive - the rebuild of Euston will be massively disruptive along with:

Lichfield Junctions
Crossing the Cross city
The closure of Landor St Freightliner terminal and the massive concrete deck over the Water Orton line
The rebuild of ALL the bridges on the Water Orton line (which massively needs capacity enhancements but will be constrained by HS2)
The diversion of a river and severe rebuild of the M6 viaduct
Rusilip area
Crossing various line (Kenilworth/Brum It'nl)

We will always have large disruption due to engineering works. But we if tie upgrade with renewals then we can minimise additional disruption.

I just fail to see the need to read your rhetoric as it is going over the same debunked myths over and over agin.

If you've not read it how do you know what I've said. Sorry but I've quoted a lot of facts not 'debunked myths'. There are far more myths from pro HS2 people such as it will decimate domestic flights (to Jersey?!!!) or that motorways are no longer viable and should be converted to railways! Or even the old classic 'the network is full therefore we need to build a new line - yes one line will solve overcrowding around Paignton, Manchester, Clapham:lol:)

VT released a press release last year saying capturing the Glasgow-London domestic air market would be worth about £50 million a year - that is against a near £700million revenue for the company and £34bn to get HS2 half way and that is really the only market that HS2 can capture from the airlines.

We'll probably see 225mph trains running at 15mph through Carstairs:lol:
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
Which pro HS2 supporter has said it will decimate flights to Jersey? Who has said motorways should be converted to railways?

I think you're getting desperate by making stuff up now, or asking about the 'Stoke question'.

How many times can I keep saying that we need to keep building and improving roads too? Not everyone who is pro rail is anti everything else. Of course some are, just as there are people who don't want to build a new railway line because it goes through their back garden...
 
Joined
9 Feb 2009
Messages
807
Which pro HS2 supporter has said it will decimate flights to Jersey? Who has said motorways should be converted to railways?

There have been several people claiming that domestic flights will be decimated. I quoted Jersey as an example of where any rail option won't make a difference and it is something many people pro-HS2 haven't thought about - we are a collection of Islands.

As far as motorways there was a suggestion in letters section of RAIL magazine and I've seen it on here aswell (no idea who though).

None of it is made up so you are clutching at straws casting unfounded aspertions:roll:
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
I don't think that anyone is under any illusions that building HS2 won't cause disruption in the places you have listed but compared to the disruption of the potential work that would need to be carried out on the WCML South (in particular) to improve track alignment to improve speeds, the disruption of the HS2 build would be minimal in comparison. Any work on the WCML in general should be to the existing pinch points rather than to increase speed across the line in general.

Euston would have to go through a rebuild anyway if truth be told and could be done with minimal disruption to existing services if what I have read is to be believed.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
You've still not taking into account the 'Stoke question' - how do you allow these extra services and still keep or improve the service for Stoke?

Also you've still not taken on board that the traffic removed is not a heavy load - it's the minority not the majority.

tbtc has claimed on many occasions that HS2 will allow the East Coast to serve more locations. Again however, that is not possible witout destroying services to Wakefield and connections to the North-East and Scotland.

The major problems aren't so much Stoke and Coventry as the approach sections to Birmingham and Manchester. Any reduction in service would be caused by bottlenecks farther up the line rather than the new line itself. My answer would be to get rid of the bottlenecks so that the classic line timetable can continue just as before, with perhaps some additional stops on some trains.

I'm also assuming that any HS2 trains passing through Stoke on the classic lines (i.e. before the inevitable Manchester extension) will stop there. There is no reason why they should not, since they will essentially be filling in what is currently a Virgin diagram from Atherstone onwards. Therefore I expect it will work like this:

Euston-via HS2-Stoke-Macclesfield-Stockport-Manchester Picc

Why will it do anything else when it is filling in a Virgin diagram? Missing stops on the classic line extensions will make for marginal time savings, which will not compensate for the lost passenger revenue. The only trains that might miss out the stops are the internationals through from HS1, then only because of a lack of customs facilities. If we either sign up to Schengen or come to another agreement, then there will be no need to worry about that, and international trains will stop at Stoke along with everything else.

Later on, various sections into big cities will badly need four tracks. The lines through Coventry and Wakefield are chockablock at the moment, and the only real solution is quadrupling. This means that we can have both a faster service and no loss of the current service. How we do it requires route knowledge far beyond mine, but I do know that Coventry-Grand Junction already needs four tracks, and Coventry can only maintain its service after HS2 if this happens.

As for Wakefield and the North East, a route only as far as Leeds might cause problems at Leeds itself, depending on the inward routing, unless there is some effort to increase capacity at the station. Assuming they do that, perhaps by building a second station on the site of Leeds Central, Wakefield will still get two expresses to London and all the locals, although the London fast might put in additional calls on the Towns Line. It would be pointless to cut them when EC trains are usually pretty busy on the Leeds route.

The new line will inevitably run right through Leeds eventually, hopefully going to York for connections, and then via new line to Edinburgh. But temporarily it might be necessary to curtail XC at Leeds and use the XC diagrams to take HS3 trains onwards to Newcastle, Edinburgh and Glasgow. That causes problems for XC, but it solvable. Quadruple from Northallerton to Ferryhill, rebuild Darlington with extra platforms on the east side and flying junctions, then reopen the Leamside. That takes pressure off the two-track sections and reduces the need to run through the speed restrictions at Durham and Chester-le-Street. Then you can reinstate the XCs without difficulty.

OK, so the answer to service problems caused by HS2 (or HS3 when it happens) is to invest in sections of the classic network. BR did rather badly with the South Eastern connections to the Channel Tunnel, although they did boost power to allow the Eurostars to run.

Finally, I must admit I'm somewhat in the dark here about the proposed timetable. However, if there are no proposals to call at intermediate stations on the classic sections, then somebody is making a serious mistake. I look at HS2 as a means of increasing the speed of current WCML trains by diverting them away from the old London & Birmingham line, not as a new line at all. HS2 should be simply an addition to the WCML, and I hope that the planners see it that way.
--- old post above --- --- new post below ---
I want to see more roads, rail and would hope we'd continue to be able to fly for many more years to come. I most definitely do not see rail as the only future, but for now we know air travel is getting more and more expensive so it's best to reserve that for routes where rail wouldn't be a viable option. When we can invent new ways to 'power' planes that is sustainable, perhaps we'll all fly everywhere.

HS2 to me isn't the be all and end all of transport for the future - and I hope it's the beginning (and supplemented by other improvements too) and in the grand scheme of things I don't think it's that expensive, or a waste of money. Most of the money is going to support industry and staff.

I am not sure how pro-HS2 supports are getting hysterical. I just see it as a useful route that allows the 'classic' lines to serve local users better when a heavy load is lifted off their shoulders - as those who want to go through can do so, fast, on other line (so, no, Philip Elliott I have not contradicted myself) . If it isn't built, so be it - but we'll just end up with a railway network that will eventually be unable to cope - just like not spending money widening motorways, building bypasses and so on for the roads.. or adding new runways and building new airport terminals. What will have to happen then is prices are forced up to price people off the railway to manage and control demand, as we already have at peak times.

Why must we have one or the other when discussing improvements for the future (and not just next week, but for future generations)? I'm a firm believer in integrated transport, and using the best means of transport for the need at the time. As I write this at 1am, if I need to get something now, I'll use my car. In the day to go to work, I'm taking a train as I'm not sitting in traffic, paying £10 congestion charge and a fortune for parking. To fly to see relatives in Sweden, I'll be flying... Oh, and very often, I'm using my legs and walking. Simple.

If the arguments against HS2 were purely down to cost I might understand it, but the real reason is the route. If HS2 was suddenly moved entirely - a new bunch of people would suddenly protest, and those who were against it might suddenly be quite happy. It really is as simple as NIMBYism in operation.

That's roughly my view. There are several places where we need new motorways, link up all the disparate bits of A1(M) all the way to Newcastle, an M12 to Felixstowe, an M11 extension along what is currently the A14 from Girton to the A1(M) and full dual carriageway all the way from Newcastle to Edinburgh, and that's just on the eastern side. I honestly don't know about the other side. Still, that's more about finishing off what we already have than building something new.

I do know that I would fly if I could hold a private pilot's licence (health problems) and that much more private flying would be a great thing if we could do something about the environmental damage. I would also like to see far more freight moving via canals, to avoid clogging up the roads, and a massive effort to get mail, parcels and newspapers back onto the railways. We can't have all of those, but we can have this. HS2 isn't being done the way I would have done it, but it's being done. It's a step in the right direction, and certainly better than say extending the M6 (Toll) all the way to the M25.
 

Chafford1

Member
Joined
25 Mar 2008
Messages
242
The Commons Transport Select Committee are conducting an inquiry into the
strategic case for High Speed Rail (HSR) and will focus on the principal arguments for and against HSR.

What are the main arguments either for or against HSR

1. How does HSR fit with the Government’s transport policy objectives?
HSR is designed to improve inter-urban connectivity. How does that objective compare in importance to other transport policy objectives and spending programmes, including those for the strategic road network?
Focusing on rail, what would be the implications of expenditure on HSR on funding for the ‘classic’ network, for example in relation to investment to increase track and rolling stock capacity in and around major cities?
What are the implications for domestic aviation?

2. Business case

How robust are the assumptions and methodology – for example, on passenger forecasts, modal shifts, fare levels, scheme costs, economic assumptions (eg about the value of time) and the impact of lost revenue on the ‘classic’ network?
What would be the pros and cons of resolving capacity issues in other ways, for example by upgrading the West Coast Main Line or building a new conventional line?
What would be the pros and cons of alternative means of managing demand for rail travel, for example by price?
What lessons should the Government learn from other major transport projects to ensure that any new high speed lines are built on time and to budget?

3. The strategic route

The proposed route to the West Midlands has stations at Euston, Old Oak Common, Birmingham International and Birmingham Curzon Street. Are these the best possible locations? What criteria should be used to assess the case for more (or fewer) intermediate stations?
Which cities should be served by an eventual high speed network? Is the proposed Y configuration the right choice?
Is the Government correct to build the network in stages, moving from London northwards?
The Government proposes a link to HS1 as part of Phase 1 but a direct link to Heathrow only as part of Phase 2. Are those the right decisions?

4. Economic rebalancing and equity

What evidence is there that HSR will promote economic regeneration and help bridge the north-south economic divide?
To what extent should the shape of the network be influenced by the desirability of supporting local and regional regeneration?
Which locations and socio-economic groups will benefit from HSR?
How should the Government ensure that all major beneficiaries of HSR (including local authorities and business interests) make an appropriate financial contribution and bear risks appropriately?
Should the Government seek support from the EU’s TEN-T programme?

5. Impact

What will be the overall impact of HSR on UK carbon emissions? How much modal shift from aviation and roads would be needed for HSR to reduce carbon?
Are environmental costs and benefits (including in relation to noise) correctly accounted for in the business case?
What would be the impact on freight services on the ‘classic’ network?
How much disruption will be there to services on the ‘classic’ network during construction, particularly during the rebuilding of Euston?
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
From my point of view, you can quad-track Coventry to New Street (or Beechwood Tunnel to Adderley Park as I believe previous suggestions have been) but that will just put the bottleneck on the 4 tracks into New Street South which cannot be increased due to the new Bull Ring foundations from what I understand
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
From my point of view, you can quad-track Coventry to New Street (or Beechwood Tunnel to Adderley Park as I believe previous suggestions have been) but that will just put the bottleneck on the 4 tracks into New Street South which cannot be increased due to the new Bull Ring foundations from what I understand

In that case, really the only option is a new line into Curzon Street while maintaining the old service through Coventry. Realistically, most trains would put in an extra stop at Milton Keynes, Northampton or Watford Jcn, so the Coventry service would be slightly slower (max 5 minutes) but this can be made up by good acceleration, and anyway is still faster than an 87 with Mk.IIIs.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
None of it is made up so you are clutching at straws casting unfounded aspertions:roll:

I asked who on here had said it. I don't care if some crazy nut elsewhere has. I can't recall anything about flights to Jersey, anything about Stoke or recommendations that roads are converted to rail (but I do remember people on here saying how silly it would be).

Still, don't let facts get in the way of a good argument.

Hint: To discredit HS2, try giving good examples of why it isn't a good idea instead of making up stuff to suggest that supporters are 'losing' the battle. It smacks of desperation and ignorance.
 
Joined
9 Feb 2009
Messages
807
I have given plenty of examples it is just you who is sticking your fingers in your ears singing la la la. You've consistently failed to give any evidence on why you think it is a good idea. Instead you make sweeping statements without any attempt to justify your opinions and then make rude arrogant remarks to anyone who may disagree with you.

Ignorance is the lack of information - I've put over 3,000 words of detailed researched information backed by statistical evidence. You need a new dictionary.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,871
Location
UK
I've given many reasons why I think it's a good idea. I am not involved in the project so I don't need to give evidence - I am sharing an opinion and you can disagree with it. That's what a forum is about. It's not a court where you make your case and a decision is given.

Please do explain where someone thought HS2 would replace flights to Jersey? I'd LOVE to see that one. And also where people on here said about turning roads into railway lines. You've said it, and didn't have to, but you did - so back those statements up please.

If you think that me asking for you to actually provide some evidence of things you've said (I don't care if you wrote a million words about something else) is rude, so be it. I'm rude.
 

CarterUSM

Established Member
Joined
4 Jan 2010
Messages
2,495
Location
North Britain
Philip, i find your posts rather informative on this subject, is anyone of note, i.e government , listening or taking heed of what you claim. For the record i really don't have much of an opinion one way or another about the whole scheme. Just a general interest.
 
Joined
9 Feb 2009
Messages
807
Jon, an opinion is only valid if one is willing to back it up. For example I could say "I believe Jon Morris is a Nazi sympathiser" however as I have nothing to back up such a silly claim it isn't valid (and no I don't think you are).

I've never said anyone directly thinks HS2 would replace flights to Jersey. It was merely a drole observation to show the "end is nigh for domestic aviation" view that many HS2 supporters have is completely out of kilter with reality.

Carterusm - thank you for your kinds words.
--- old post above --- --- new post below ---
Okay so it is the wrong forum Jon, but I found this on WNXX:

Cheap air travel is doomed, internal domestic will end first. Long distance road travel will become unaffordable and uncompetative. As the numbers of vehicles using the roads decreases it will become too expensive to maintain the roads due to falling tax revenues.

The government is aware of this, hence the eagerness for high speed rail.


It is the motorway network that will become unviable, not rural local roads that barely get maintained as it is anyway

So HS2 will see the closure of motorways according to "27010":lol:
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Cheap air travel probably is doomed but not for any reason other than the current fuel prices and current lack of alternative. Flights to European destinations could effectively co-exist with a rail alternative, flights to destinations further afield will always remain

The posts you quote do seem a bit extreme in their opinions with no source to quote either. Mind you extreme comments can come from both sides of the fence sich as the "Prepare your Ark" article on the StopHS2 website a while back :roll:
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
If you read the article by Andrew Gilligan, you will see that Birmingham accounts for less than half of the EBW traffic to London (never mind all the "local" traffic)

First of all, I think you raise some interesting points in your argument, a lot better than the "usual" anti-HS2 arguments. I was going to reply to this on my lunch break on Sunday but didn't have time...

Birmingham New Street is under half of the "London" trade on the London - Wolverhampton trains? Not *that* surprising, given the six stops that the train makes (Coventry, International, New St, Sandwell, Wolves). If you are talking about that one hourly service (xx.23 ex Euston) then clearly it'll have a disproportionate number of Sandwell/ Wolverhampton passengers on it (since it is their one direct train each hour). If you are talking about all three services each hour from London to Birmingham New Street then there are Milton Keynes/ Rugby passengers too, so the fact that New Street is under 50% of the total "ex London" passengers isn't too surprising.

The plan for HS2 has categorically not been based on increasing network capacity - it has purely been based on speed. If it was based on capacity which it should then it would serve far more places including all those cities that it bypasses such as Stoke & Coventry

I prefer the "capacity" argument to the "speed" argument, I'll be honest. We need more capacity from London to "the North" (given the bottle necks that exist at places like Welwyn). We can either extend existing lines (not always easy, needs a lot of disruption, may only push the "pinch points" a few miles along the line).

Building a new "fast" line (as HS2 proposes) means it'll be faster to use HS2 to get to Sheffield/ Leeds/ Newcastle etc. Building a slower "new" line from London to Wigan won't help ECML/MML problems (because it won't take any Yorkshire/ North East services).

I am against building new lines on principal when so many hundreds of towns (some very large) have no rail service at all

Examples? Where do you think its worth building new lines to? Dunstable is an example that gets trotted out on here, Washington in Tyne & Wear is another... what proposals would you have?

others have very poor service - such Worcester to Bristol which is an inter-city journey

Worcester to Bristol has never been an "inter city" level of train service. Worcester is a city (though not a big one), but then there are lots of cities which lack "inter city" service between them. Are you suggesting that this is a bigger priority?

Under the plans, train path capacity will only be released if the likes of Stoke and Coventry get a far worse service

Not sure about this. As I see it, the existing services will continue on the WCML but will make a handful of extra stops (e.g. instead of running "fast").

At the moment we have stopping patterns each hour like London - Warrington... London - Crewe... London - Stoke... I'd imagine that these services would add stops at the likes of Watford/ Milton Keynes/Rugby/ Trent Valley Stations to take pressure off the London Midland services (which is only going back to how these journeys used to be, pre Virgin). Maybe an extra five minutes in journey time, but not "far worse".

Slowing down the existing WCML services like this means that more trains can be squeeze in, fewer speed-differentials, so there may be additional paths each hour for new services (I've suggested some new uses for these before))

HS2 will see £34bn spent for a worse service!

I certainly wouldn't claim that HS2 will be "Pareto optimal", there are bound to be some "losers" (as with any shake up). Look at how every big improvement in railways ends up with some "non core" links/ services being downgraded/cut. I'm not going to naively state that everywhere will be better off under HS2, in the way that VHF lost direct trips like Tamworth - Stockport or Runcorn - Nuneaton - you have to balance up the winers and losers.

To get maximum benefit we need to be looking at a 'London to Wigan' route with a connection near Rugby for EBW services which would run along a 4-tracked route, a branch to Manchester (with through route capability) and loops to include Stoke & Milton Keynes. Then we *could* release the WCML from Intercity traffic

So would your London - Birmingham/Manchester services run on this new alignment? However you do it there will be some "loser" (e.g. Watford - Coventry). Not sure about the importance you attach to Stoke, personally, maybe that's just me.

how is HS2 going to abtract custom from Plymouth, Aberdeen, Humberside, Jersey, Belfast? It is insane to suggest we could eliminate or even massively reduce domestic air travel

This is something which I don't think anyone has ever claimed (and has been discussed since your post). The bulk of "internal" air journeys are between London airports and Manchester/ Newcastle/ Glasgow/ Edinburgh. HS2 will tackle some of those. Not all, because there will always be some business market (e.g. London City Airport for the Docklands market) and "connection" market (people flying to London to catch flights elsewhere - unless HS2 is serving Heathrow *properly*). I think HS2 could do enough to kill of most London - Scotland flights though.

As far as wildcard suggested he is right to say you can release a lot of capacity by re-opening cross country routes. Oxford and Cambridge are our top university cities and despite the rivalry and faux suggestions of 'we don't deal with them' there is a key need for travel between the two but how do you get there? At the moment it has to be done via either London or Birmingham (unless you really to go via the slow route via Bedworth) which means a lot of traffic is going through London, clogging capacity unnessarily when people don't actually want to go there!

This is something I'd like to see Crossrail evolve to provide. In the way that the initial "Bedford - Brighton" Thameslink service is being extended to link Cambridge/ Peterborough with Kent/ Sussex, I think Crossrail will grow beyond Maidenhead - Shenfield.

However, the Anglia experiment shows the flaws with avoiding central London, given the size of that market. The "avoiding central London" market has been tried a few times, like the South Central plans for Birmingham - Clapham - Brighton, but the maths aren't as strong as they may be.

Northamptonshire is a wealthy county put possibly has the worst access to the railways than any other county with just 6 stations - Northampton & Long Buckby on the LNWR Northampton loop, Wellingborough, Kettering & Corby on the MML and Kings Sutton on the Oxford - Birmingham line

This is a historical problem, but are you suggesting that its a bigger priority than HS2?

People moan on here that Corby is not well used but it is not surprising when the some of the key destinations for Corby folk - Northampton, Peterborough & Glasgow are not accessibile or require long out of the way and expensive diversions

Corby only opened a couple of years ago. Whilst I can appreciate the demand for a Scottish service, these kind of things will happen in the longer term (if they happen), can't really complain that a risk like this wasn't taken from day one...

Northamptonshire is one of the five counties that make up the East Midlands yet the county town, Northampton has no links to the other four counties or their respective cities

Again, is this really a priority? A direct railway from Northamptonshire to Rutland?

If you look at the massive road building that happened in the 90s such as the A14, A43 widening and upgrading the A45/A605 you will see they are mainly east/west or 'avoiding London' routes

Partly because of all the money spent on building "to London" routes prior to that. There has certainly been a lot of money spent on "to London" motorways recently too, like the four lanes on the M1, the M40 extension towards Birmingham, the upgrading of the A1 to Motorway standard (slowly...).

There is a lot assumption that if you build a line from the largest city from to the second largest then by definition it must get well used but that isn't necessarily true. Greater Manchester & Merseyside are both very large conurbations but the the traffic between them is very small - why? Because most people living in Greater Manchester want to travel to...the city of Manchester and most in Merseyside want to go to Liverpool. One only travels to a 'foreign' area when you can't get what you need from the local environ

Of course most people's travel demands gravitate to their local "big" cities (which is why I'm surprised at the importance you put on Stoke/Coventry - London trade, when these places have bigger "needs" to Manchester/Birmingham).

Coventry has 3 60-minutes trains an hour to London but is a hovel whilst Harrogate has no regular service and is very wealthy

I'm confused. I don't think the railway has had anything to do with the prosperity (or lack of) in these places (Harrogate has a daily train to London, from May it becomes an "each way" service), and you've attached a lot of importance to the "Coventry to London" train service... are you saying that Coventry would be better off with even more London trains?

2. Whilst the motorways might be 'express' roads they are several local/regional links. The M1 finishes at something like junction 46 - far far more places benefitted from quick links than HS2 will

The motorways are a good example for HS2. They're not all about journeys from Brent Cross to Wetherby (using the M1 as an example), but they are used as part of longer journeys. I say this as a contrast with those who think HS2 is only about getting people from London to Birmingham...

Where is the planning for Crossrail 2?

Only something to consider when Crossrail 1 is up and running, I'd presume. What are you suggesting gets done? Another tunnel through central London? Or extending the first phase?
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,714
This is something which I don't think anyone has ever claimed (and has been discussed since your post). The bulk of "internal" air journeys are between London airports and Manchester/ Newcastle/ Glasgow/ Edinburgh. HS2 will tackle some of those. Not all, because there will always be some business market (e.g. London City Airport for the Docklands market) and "connection" market (people flying to London to catch flights elsewhere - unless HS2 is serving Heathrow *properly*). I think HS2 could do enough to kill of most London - Scotland flights though.

H

While I agree with virtually all your comments - the majority of passengers flying on domestic flights in the UK are either travelling over water and cannot transfer to rail - or on routes that will see little benefit from HS2 -eg Bristol-Scotland, Aberdeen to London. The majority of passengers flying from Manchester to LHR are interlining as are a reasonable percentage of those flying from Scotland.
 
Joined
9 Feb 2009
Messages
807
If you are talking about all three services each hour from London to Birmingham New Street then there are Milton Keynes/ Rugby passengers too, so the fact that New Street is under 50% of the total "ex London" passengers isn't too surprising.

Quite, so why is HS2 proposing to dramatically reduce the capacity of these flows whilst greatly increasing the capacity for a minority flow?

Building a new "fast" line (as HS2 proposes) means it'll be faster to use HS2 to get to Sheffield/ Leeds/ Newcastle etc. Building a slower "new" line from London to Wigan won't help ECML/MML problems (because it won't take any Yorkshire/ North East services).

Where did I say a Wigan line would be a "slow" line? You could still attach a Leeds arm or just putting a junction on the Birmingham & Derby Junction line. The MML only has capacity issues south of Leicester, having a fast London - Sheffield won't reduce the need for fast trains to/from Leicester thereby not releasing any capacity. What the MML needs most is longer trains - making the 222s back to 9 cars would be a start. The northern MML has oodles of capacity - the Erewash has 2tph - it could take 20tph! Leeds/Newcastle etc should be served by an East Coast relief line - sending traffic via Birmingham is just ludicrous.

Where do you think its worth building new lines to? Dunstable is an example that gets trotted out on here, Washington in Tyne & Wear is another... what proposals would you have?

Not 'new' lines but re-opening. Plenty of options:

Northampton - Bedford
Northampton - Wellingborough
A new curve at Manton allowing Northants - Peterborough flows
Leicester - Rugby
Rugby - Leamington (allows XC to avoid Birmingham)
Stratford - Cheltenham
Oxford - Cambridge
Bolsover - Chesterfield/Sheffield (connects Staveley, Renishaw etc.)
Leicester - Burton (Coalville, Ashby etc.)
Stoke - Newcastle (LRT)

Plenty more options!

Worcester to Bristol has never been an "inter city" level of train service. Worcester is a city (though not a big one), but then there are lots of cities which lack "inter city" service between them. Are you suggesting that this is a bigger priority?

It is still an intercity journey though and Worcester is a connecting point for many other places - Droitwich, Hereford, Kidderminster, Stourbridge etc. The awful service pushes people to their cars.

'd imagine that these services would add stops at the likes of Watford/ Milton Keynes/Rugby/ Trent Valley Stations to take pressure off the London Midland services (which is only going back to how these journeys used to be, pre Virgin). Maybe an extra five minutes in journey time, but not "far worse".

5 minutes is one stop so you may get Watford - Manchester but what about Rugby or Nuneaton or Tamworth? By serving Stoke & Milton Keynes on "HS2" you can keep (in fact better) the current service AND introduce other links such as semi-fast services.

Slowing down the existing WCML services like this means that more trains can be squeeze in, fewer speed-differentials, so there may be additional paths each hour for new services (I've suggested some new uses for these before

There are few speed-differentials at the moment - going down the option of adding Watford to one Manchester service, Nuneaton on a Liverpool etc. with more 350s on the fast lines will INCREASE the differentials.

So would your London - Birmingham/Manchester services run on this new alignment? However you do it there will be some "loser" (e.g. Watford - Coventry). Not sure about the importance you attach to Stoke, personally, maybe that's just me.

There are always losers but potentially you could add a Watford loop, there will spare capacity on the WCML and there are plenty of Watford - Milton Keynes services to connect.

The bulk of "internal" air journeys are between London airports and Manchester/ Newcastle/ Glasgow/ Edinburgh.

I'd disagree that they make up the bulk - Plymouth, Aberdeen, East Midlands, Humberside, Doncaster Robin Hood etc all have various internal journeys plus there is all the Irish traffic.

The "avoiding central London" market

We don't want an avoiding Central london route - but avoiding all together. The route via the WLL is incredibly slow. We need a fast service between two key interchange stations - a 125mph service from MK to Basingstoke or Guildford possibly.

This is a historical problem, but are you suggesting that its a bigger priority than HS2?

It is not a historical problem - the links all existed prior to Beeching. For example Corby was on the main St. Pancras to Nottingham route and Nottingham had direct trains to Scotland.

Again, is this really a priority? A direct railway from Northamptonshire to Rutland?

That's not what I meant and you know it. Northampton needs direct links to Leicester, Nottingham, Derby etc. Re-open the Wellingborough line and you can have a service to Oakham if you wished...!

There has certainly been a lot of money spent on "to London" motorways recently too, like the four lanes on the M1, the M40 extension towards Birmingham, the upgrading of the A1 to Motorway standard (slowly...).

The items in bold are interesting....upgrade instead of new... The M40 was over 20 years ago though!

Of course most people's travel demands gravitate to their local "big" cities (which is why I'm surprised at the importance you put on Stoke/Coventry - London trade, when these places have bigger "needs" to Manchester/Birmingham).

Don't you see that if Stoke is served on a loop of HS2 you get quicker journeys to Manchester aswell? Under the current proposals, Stoke could see it's 2x Pendo & 2x Voyager service reduced to 1 of each (if a Brum - Manchester runs on HS2). So it isn't just the London service that is threatened at Stoke. Stoke is a very run down city and if it's rail service is cut like proposed it could be left to rot permanently.

and you've attached a lot of importance to the "Coventry to London" train service... are you saying that Coventry would be better off with even more London trains?

Will Birmingham be better off with more London trains? If it will so will Coventry. It is simply a question of equality - why should a "select few" be pampered with the rest thrown on the scrap heap?

For instance why is HS2 going to Leeds but not Bradford? Bradford "needs" it more than Leeds does!

They're not all about journeys from Brent Cross to Wetherby (using the M1 as an example), but they are used as part of longer journeys. I say this as a contrast with those who think HS2 is only about getting people from London to Birmingham...

How does someone from Amersham get to say Barnsley? If HS2 stopped at Aylesbury & the centre of Sheffield it would be a simple 3-stage journey. The fact that it doesn't stop anywhere means it is impossible unlike the M1 which has 46 oppurtunities to join and alight! HS2 has not been designed like the motorway network.

The busiest motorways - the M25 and M6 through the West Midlands are because of all the local traffic - one or two junction hops. M6 Jn3 - 4 is Coventry - NEC / the airport for example.

Only something to consider when Crossrail 1 is up and running, I'd presume. What are you suggesting gets done? Another tunnel through central London? Or extending the first phase?

Do you know what Crossrail 2 is? It is the planned route from Kings Cross - Victoria which would just leave Euston & Marylebone without through national rail connections.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Do you know what Crossrail 2 is? It is the planned route from Kings Cross - Victoria which would just leave Euston & Marylebone without through national rail connections.

That's actually the Chelney Line, which is supposed to be a deep-level tube line absorbing the Epping branch of the Central and the Wimbledon branch of the District. The idea is as a relief to the Victoria and Piccadilly while easing connections eastwards from the KX-SP-Eu station complex. Personally, I'd have run it up the river via Fulham and Barnes and split it, with one branch going to Heathrow and the other to Southall, but they obviously preferred Wimbledon for some reason.
--- old post above --- --- new post below ---
How does someone from Amersham get to say Barnsley? If HS2 stopped at Aylesbury & the centre of Sheffield it would be a simple 3-stage journey. The fact that it doesn't stop anywhere means it is impossible unlike the M1 which has 46 oppurtunities to join and alight! HS2 has not been designed like the motorway network.

The busiest motorways - the M25 and M6 through the West Midlands are because of all the local traffic - one or two junction hops. M6 Jn3 - 4 is Coventry - NEC / the airport for example.

Stopping absolutely everywhere would make HS2 entirely pointless. You might as well rebuild the GCR as a conventional 125 mph railway with stations at Aylesbury, Brackley Central, Woodford Halse, Rugby Central, Ashby Magna and all the rest (not sure about Charwelton, Finmere and so on). From my point of view, that would be a fine thing to do, but it does not help with the ultimate aim of HS2, delivering people to Scotland as fast as possible. Intercity railways of any kind simply do not work like that, they have to spend ages covering distance without stopping while mixing with trains that do stop. If I were designing it, HS2 would have slow lines with regular commuter services that called at places such as Aylesbury and Brackley, then diverted up the GCR to Rugby and thus to Leicester, with a connection to Banbury to allow XC to use that route to avoid Birmingham. Unfortunately, it's not up to me.
 
Joined
9 Feb 2009
Messages
807
If I were designing it, HS2 would have slow lines with regular commuter services that called at places such as Aylesbury and Brackley, then diverted up the GCR to Rugby and thus to Leicester, with a connection to Banbury to allow XC to use that route to avoid Birmingham. Unfortunately, it's not up to me.

Spot on!
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Bradford would be more difficult to get to, as a matter of simple geography It would be extremely difficult to put a through line in. It's possible that there could be a branch or a regular extension (one of the most important GC services was the South Yorkshireman to Sheffield and Bradford) but it would be very difficult to do with current infrastructure and very expensive with new line. Having said that, a major upgrade of the Calder Vale and Penistone lines could allow a connection from Sheffield Victoria (assuming that it is used by HS3).
 
Status
Not open for further replies.

Top