The compensation scheme for people affected by the proposed High Speed Rail link between London and Birmingham is due to be launched.
http://www.bbc.co.uk/news/business-11028431
I feel sorry for those affected!
The compensation scheme for people affected by the proposed High Speed Rail link between London and Birmingham is due to be launched.

dunno about you guys but i would love a high speed line at the bottom of my garden![]()
But those who are in favour of it don't?I tend to think that critics or anyone who is unsure about HS2 needs to read a few hundred pages of documents before they make up their minds.
But those who are in favour of it don't?
Out of interest, is HS2 being planned as two track or four track? Reason for asking is that one of the arguments put forward against HS2 is that it will only benefit very few places (where the stops are). Obviously adding more stops will extend journey times, defeating the point of 'high speed'
Building it as a four track system (like most other mainlines) with fast and slow lines would give the best of both worlds. Although costing a little* more, the added flexibility and capacity would be useful.
* a high proportion of the expenditure goes on planning, and other soft issues rather than hard construction. I seem to recall reading that HS2 alone will spend £750 million before construction starts around 2015, add to that the costs of all the other previous studies and plans and a significant amount of the busdget for the line has been spent.
I think people get scared off by HS2 due to the cost and scale but this is a long term project, the initial phase alone will take 15 years from now to plan and build. The government has to plan decades ahead simply because the time it takes to get projects such as this off of the ground.
Just be honest, be practical and accept that HS2 is the first step on the way (not an instant solution to everything)
)The question in the title - under 5h London-Glasgow and under 1h30 London-Birmingham - so do we need a highly-expensive, massive rail network to take Britain's railways into the 21st century?![]()
I could always be devils advocate and ask "how will HS2 benefit me as someone who lives in the South West?"
And don't even mention the fact that building the new line will tear up lots of new virgin countryside, much in areas of outstanding beauty, very environmentally friendly.
Much better to recycle cycle tracks..
improving exisiting lines causes disruption to current services, whereas completely new lines do not. Furthermore, how else can you increase capacity between London and Birmingham by 100%? Turn the WCML into an 8 track railway?
Be environmentally friendly - dig up cycle tracks :roll:
What a clever boy...
I could always be devils advocate and ask "how will HS2 benefit me as someone who lives in the South West?"
It doesn't. Nothing everything that a government spends your tax money on will directly benifit you. This is a fundamental aspect of taxation.
Let me ask whether London-Birmingham needs 100% more capacity. Is the route overcrowded? Has it not been upgraded recently?
Would it cost £20,000 mil to [say] reopen the Somerset and Dorset, the Woodhead, the eastern Callander and Oban and finally build a Great Glen Railway? What about actual plans, like SELRAP or the Ripon line? I like the idea of HS2, it's just a question of whether it's really the best thing to do
would Crosscountry continue to provide through journeys?
The thing is that it's not about *just* London to Birmingham, in the way that the M6 by-pass wasn't just about getting from one side of Birmingham to the other. Its the first step on a whole new line, and trains from Manchester / Leeds/ Glasgow etc will be able to use the new line to improve journey times.
The WCML is pretty much at capacity already, and there's little scope for longer trains (once the 390s get their extra couple of carriages) or more paths. Any disruption to improve the WCML would be massive (remember the years of weekend bustitution, Project Rio etc)
I agree that HS2 shouldn't be the *only* improvement, and I think we still need to tackle existing bottlenecks (Welwyn, platforms 13/14 at Manchester Piccadilly, Reading Station etc). However, I can't see Callander to Oban or Colne to Skipton in the same light, sorry.
Well, with fast HS2 services continuing north from Birmingham to Leeds/ Newcastle/ Edinburgh and to Manchester/ Carlisle/ Glasgow, you could argue that there's not going to be much "Cross Country" north of Birmingham.
You could integrate the current XC lines south of Birmingham into an expanded Greater Western franchise(?)