DarloRich
Veteran Member
My I suggest that several posters ( the majority?) consider and absorb the postings of P. Phlopp Esq. Learned, concise, cogent, sensible and much more polite than I am prepared to be.
The following TfGM paper has a table on page 5 showing updated timescales for the various projects affecting the area:
https://www.greatermanchester-ca.gov.uk/download/meetings/id/461/item_14
It seems most projects have been delayed to some extent.
The following TfGM paper has a table on page 5 showing updated timescales for the various projects affecting the area:
https://www.greatermanchester-ca.gov.uk/download/meetings/id/461/item_14
It seems most projects have been delayed to some extent.
The following TfGM paper has a table on page 5 showing updated timescales for the various projects affecting the area:
https://www.greatermanchester-ca.gov.uk/download/meetings/id/461/item_14
It seems most projects have been delayed to some extent.
Rochdale south bay + Calder Valley line speed improvements
Due Dec-17,
Expected date CP5/CP6 TBC
An interesting typo in Roger Ford's email preview of his Modern Railways column: he refers to Sir Peter as "St Peter" at one point.
He also points out that the report on the website was changed on the day of publication, from saying electrification to Oxford would not be completed in CP5 to saying it would.
Edit: For the first time ever I've received the magazine on the same day as the e-preview!
He also points out that the report on the website was changed on the day of publication, from saying electrification to Oxford would not be completed in CP5 to saying it would.!
The "incorrect version" of the report has the "Northern Hub second phase", including Oxford Road station remodelling, postponed into CP6 (2022 completion). The official version brings this forward two years to 2018-20, following on from Ordsall Chord completion. The "incorrect version" also has a section, on pp10-11, describing the North of England work to be postponed into CP6. This section has been redacted from the official version, but is quoted in Annex B of the TfGM paper linked by Chris125 above.Both versions of the Hendy report are on the Modern Railways website here:
http://www.modern-railways.com/view_article.asp?ID=9327
The "incorrect version" of the report has the "Northern Hub second phase", including Oxford Road station remodelling, postponed into CP6 (2022 completion). The official version brings this forward two years to 2018-20, following on from Ordsall Chord completion. The "incorrect version" also has a section, on pp10-11, describing the North of England work to be postponed into CP6. This section has been redacted from the official version, but is quoted in Annex B of the TfGM paper linked by Chris125 above.
My guess is that the "incorrect version" reflected NR's initial assessment of what could still be delivered in CP5 within the available budget, whereas the official version rowed back to the minimum that Ministers (facing taunts about the "Northern Powercut") considered politically acceptable. Which begs the question, where is the additional funding going to come from?
There's already more money made available - changes to track renewals, alterations to resignalling works and there's more revenue from franchise operations to feed into the DfT budget, which will allow money to be moved around and cover the electrification increases.
You should also expect additional funding to be spun politically for the 2020 general election, and I'm hoping electrification will be moved out of the Control Period structure and committed to an a rolling basis, of an average number of route miles per annum, with the routes to be electrified agreed in advance of the CP settlements. Trying to squeeze 6 or 7 years of work into 5 years of each Control Period isn't helpful at all.
It also depends on the precise reason for the changes - not everything is significantly over budget and can't be afforded within the original CP5 settlement (when broken down into individual projects). There are some projects which are only a little over budget but being held up by contractors being damn awkward and quitting half way through the work program, as was the case with the NW electrification.
There are work programs, such as gauge clearance, which are ahead of schedule and which will save money as a result too, and with the price of steel and copper falling, fuel getting cheaper etc, there are cost savings which can be realised on masts, gantries, piles, concrete, transportation and such. It's only a few percentage points, but it's going to allow some of the contingency put aside for construction inflationary pressures to be reassigned too.
Transport Scotland have experienced some of the same savings in contingency funds with the replacement Forth crossing, it has enabled construction works to begin earlier than planned on the A9 dualling project, we hope to be able to realise some similar savings on electrification. In saying all that, building an entirely new structure is not as difficult as trying to modernise an old one - hence the problems on the old Forth road bridge - old things come back to bite you when you least expect it.
If there is an incorrect version why waste time reading it?
Because it's more likely to reflect what Hendy actually thought possible before ministerial pressure intervened.
Philip, with this bedside manner you have, I am now comforted like someone that just been to the doctor with worrying symptoms (brought on by reading too many Roger Ford articles) and have been told gently that I am simply over-anxious and just need to take a few aspirins!
Greetings of the season by the way and I hope to read more of this quality in 2016. so I hope you stick around, Bald Rick too, and all the profs who write in.
Philip, with this bedside manner you have, I am now comforted like someone that just been to the doctor with worrying symptoms (brought on by reading too many Roger Ford articles) and have been told gently that I am simply over-anxious and just need to take a few aspirins!
Greetings of the season by the way and I hope to read more of this quality in 2016. so I hope you stick around, Bald Rick too, and all the profs who write in.
Still a massive waste of time - government gets what government wants
Its noticeable that some schemes appear to have vanished altogether.
I couldn't find anything on Felixstowe branch re-doubling nor Haughley Junction doubling either.
Perhaps I missed it and some other readers have seen it.
During CP5, a scheme to increase the capacity of the Felixstowe branch is being developed with the aim of supporting increased freight train paths in CP6.
Under Improvements for freight customers, on page 28 of the Report it states:-
It doesn't say doubling, but I don't think full doubling was ever on the cards anyway.
The update to the CP5 Enhancements Delivery Plan, which Hendy promised for "early December", is now out:
https://www.networkrail.co.uk/Enhancements-Delivery-Plan-Update.pdf
In addition the DfT is opening a consultation on Hendy:
https://www.gov.uk/government/uploa...t-programme-the-hendy-report-consultation.pdf .
I have found an alternative route to theThese links only worked for me at the second or third attempt.
I have found an alternative route to the
Hendy Enhancements Delivery Plan which works more reliably...
Go to http://www.networkrail.co.uk/Hendy-review/
Click on the link at the bottom of that page:
Download the Hendv Enhancement Delivery Plan Update here
I have found an alternative route to the
Hendy Enhancements Delivery Plan which works more reliably...
Go to http://www.networkrail.co.uk/Hendy-review/
Click on the link at the bottom of that page:
Download the Hendv Enhancement Delivery Plan Update here
I've yet to read what's there!
Is this a new technique? By writing DRAFT all over it, he's just hoping that Roger Ford of Modern Railways will find all the nonsenses and enable him to produce something believable?
It appears that various capacity and line speed improvements to the TPE North and Calder Valley lines which previously were part of the TPE North Electrification project have been split out into other projects and will not be delayed into CP6 - although it was pretty obvious from the franchise announcements that these were going ahead in CP5.
Initial on CP5 Enhancements P26 ES003J and also P37 - both show lines that Sheffield - Doncaster and York/Leeds are "inked in". This is new surely - in a good way.