Please don't use derogatory terms like frothing and foaming to describe people who have an enthusiasm for Valenta engines. I'm not going to find out what engines you like and then describe people who like them as frothing and foaming. Why do it? Some people have a grudge against HSTs because they displaced their favourite trains, but I don't think that's a good reason for insults.
There's no way GC can go for the MTU for several reasons, including the fact that the MTU engines used in the UK do not meet the current emissions standards so they'd have to trial new ones. This is obviously not feasible! Also do you have enough evidence to suggest it is the Valenta power units themselves that are to blame for enough of the delays to make re-engining them at a cost of many millions of pounds cost effective?
Hi Yorkie, frothing and foaming is neither derogatory nor insult, just a description from observation. I would think its rather ludicrous to have a grudge of what is essentially just a machine thats built to do a specific purpose replacing another due to age and life expiry. The specific train I favour is one that is not a pig to work on and give me grief. Now given the choice, would I rather be up to the eyes sweating like a pig in dirt struggling to keep Paxman Valenta's going that have gone through multiple overhauls in their long life or the easier life of prev maintenance on a more reliable up to date MTU? If Valenta enthusiasts had to work on them, they would be now hating them.
On the theme of current emission levels, the Class 43 loco is not regarded as new build, therefore exempt of emmision legislations. New build Diesel Traction is required comply with the current and ever tightning emission controls. Cummins, for example are not working on their Quantam Series units to meet the next Euro Complience 5 but are developing ahead for upcoming 6 and 7.
As for Grand Central availability, my opinion and mine only, I would have felt more assured running 3 paths daily, 8 power cars, 4 rakes of coaches, giving a much higher guarantee that those 3 paths (not 4) "will" operate and not let the passengers down from York/Northallerton northward having cancelled services. People vote with their feet and at the end of the day Grand Central is a "train service". If customers don't know if their train is going to turn up, will they buy tickets even if they are cheaper than NatEx First or ARRIVA?
Surely, after the first year in service, after payments for train recovery, possible fines, organising alternative onward travel for passengers after train failure etc, etc, surely the Balance Sheet cannot be pleasing?
GC ticketing discussions, not my arena.
Kind regards: