mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
Progress Report 09/07/22

So, ahead of the 5 week closure of the line between Kirkby and Rainford, preparatory work seems to have started on the current bridge(s) over County Road. Some demolition work has begun on the middle pier supporting the current single track bridge deck(s)...I believe the middle pier is being removed completely and a new deck will span the entire gap with a view to "assisting with any future plans to widen County Road". Time will tell I guess.

The footpaths leading to the former underpass have now been fully filled in on the Southcroft Drive side of the site and new footpaths are being laid level with Headbolt Lane. I'm guessing they'll be doing the same on the station side of the site.

Foundations fully dug and concrete laid for ticket office platform. Still nothing on Northwood side platform.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,264
Location
Yorks
Great project, but lunacy that the third rail isn't just being extended.
 

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
I agree...but isn't there some kind of prohibition about 3rd rail electrification these days? Even so...you think they wouldn't be that bothered about a mile or so of additional rail...and they're beefing up the feeders for the new trains anyway!
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,991
Location
Surrey
I agree...but isn't there some kind of prohibition about 3rd rail electrification these days? Even so...you think they wouldn't be that bothered about a mile or so of additional rail...and they're beefing up the feeders for the new trains anyway!
ORR dead against it but RSSB have a project to look at how it could be designed to and still be compliant with modern legislation. MerseyRail have ordered 7 units with batteries although for a mile seems a bit of over complication.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
ORR dead against it but RSSB have a project to look at how it could be designed to and still be compliant with modern legislation. MerseyRail have ordered 7 units with batteries although for a mile seems a bit of over complication.
It isn’t just about a mile. Headbolt Lane and the 7 Stadler ‘IPEMUs’ serves as a test bed for the potential of the battery technology for many extensions to the Merseyrail network, with Preston, Wigan, Warrington, Birchwood, Helsby, Runcorn East, Shotton, Wrexham and Crewe all destinations which could benefit with no or minimal work required, before you have to get into the more significant infrastructure intervention to provide the Burscough Curves, Skelmersdale, Gateacre or the North Mersey/Canada Dock branches as unelectrified routes well in excess of a mile.
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Those units are going to be a nightmare to diagram, and especially to manage at times of disruption. One of the best features of Merseyrail as it is is that the same units can go anywhere on the route. This is going to be lost.
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London
Those units are going to be a nightmare to diagram, and especially to manage at times of disruption. One of the best features of Merseyrail as it is is that the same units can go anywhere on the route. This is going to be lost.
Presumably if the test is a success, all units will be fitted with batteries.
 

alf

On Moderation
Joined
1 Mar 2021
Messages
422
Location
Bournemouth
Presumably if the test is a success, all units will be fitted with batteries.
and add to the cost, complexity, unreliability, & weight of the new units all for the sake of saving two kilometres of third rail in a Merseyside network that already operates sixty times that length of third rail safely; And has safely for years.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,472
Location
Liverpool
Presumably if the test is a success, all units will be fitted with batteries.
I understand that you can either have dual-voltage third rail/overhead units, or either of those with batteries. Not all three together, and the aim of Merseyrail was to take over City Line services which will need the former. Unless that ambition has been quietly dropped. Of course we are not exactly Red Wall territory hence will be last in the queue for any levelling up under whatever shambles of a Tory government emerges from the current confusion.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I would have thought it more likely that the number of units to which batteries will be fitted will depend on how many routes start to be operated that need batteries.
 

Brian1947

Member
Joined
9 Nov 2012
Messages
55
Location
Lancashire
According to my family contacts in Skem the proposed link to the town has been cancelled. An irate MP Rosie Cooper confirmed this earlier today on BBC 1’s regional politics programme. It looks like the extension to Headbolt Lane will extend no further.

By its design you have to assume an extension to Skem was never really on the cards.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
According to my family contacts in Skem the proposed link to the town has been cancelled. An irate MP Rosie Cooper confirmed this earlier today on BBC 1’s regional politics programme. It looks like the extension to Headbolt Lane will extend no further.
This has been under discussion for a few days here:

 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,009
Location
"Marston Vale mafia"
According to my family contacts in Skem the proposed link to the town has been cancelled. An irate MP Rosie Cooper confirmed this earlier today on BBC 1’s regional politics programme. It looks like the extension to Headbolt Lane will extend no further.

By its design you have to assume an extension to Skem was never really on the cards.

Wigan could be though.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,807
Location
Liverpool, UK
Those units are going to be a nightmare to diagram, and especially to manage at times of disruption. One of the best features of Merseyrail as it is is that the same units can go anywhere on the route. This is going to be lost.
Almost certainly they will never work on the Wirral Lines but odd one are likely to appear on Southport and Ormskirk services.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,991
Location
Surrey
It isn’t just about a mile. Headbolt Lane and the 7 Stadler ‘IPEMUs’ serves as a test bed for the potential of the battery technology for many extensions to the Merseyrail network, with Preston, Wigan, Warrington, Birchwood, Helsby, Runcorn East, Shotton, Wrexham and Crewe all destinations which could benefit with no or minimal work required, before you have to get into the more significant infrastructure intervention to provide the Burscough Curves, Skelmersdale, Gateacre or the North Mersey/Canada Dock branches as unelectrified routes well in excess of a mile.
Modern traction battery technology is proven in several overseas administrations fleets already just need to get on and deploy it. Never get our obsession to need to reinvent the wheel in this country.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Modern traction battery technology is proven in several overseas administrations fleets already just need to get on and deploy it. Never get our obsession to need to reinvent the wheel in this country.
The Stadler traction batteries aren’t a reinvention for this country, they’ve been imported from Switzerland. Since it’s a proven technology and we can expect to see a massive expansion of battery traction, especially around areas of existing electrification, given the need to decarbonise our railway and the rapidly approaching obsolescence of 1980s Diesel Sprinters which can be found on many lines surrounding Merseyrail. Procurement of additional battery 777s reduces the burden of Sprinter replacement in a few years, so it really is vital that it succeeds. Where better to start with than Headbolt Lane?
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,991
Location
Surrey
The Stadler traction batteries aren’t a reinvention for this country, they’ve been imported from Switzerland. Since it’s a proven technology and we can expect to see a massive expansion of battery traction, especially around areas of existing electrification, given the need to decarbonise our railway and the rapidly approaching obsolescence of 1980s Diesel Sprinters which can be found on many lines surrounding Merseyrail. Procurement of additional battery 777s reduces the burden of Sprinter replacement in a few years, so it really is vital that it succeeds. Where better to start with than Headbolt Lane?
Im all for it my point was it doesn't need to be trialled its proven just need to get on with fleet deployment.
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
The Echo are reporting road closures for the next 5 weeks:
Knowsley Council is reminding motorists that County Road in Kirkby will be closed from tomorrow, July 23, up until August 30 to enable Network Rail to carry out the works, but access for pedestrians and cyclists will be maintained at all times.

The road will be closed between the junction with St Kevins Drive and the junction of Boyes Brow/Headbolt Lane to replace the existing bridge over County Road. This will enable Network Rail to install an additional railway track approaching the new station.

From:
 

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
I see the NIMBYs are off on one.

"I'm gonna buy this house backing directly onto a active railway, then complain when there's work done on said railway!"
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
I see the NIMBYs are off on one.

"I'm gonna buy this house backing directly onto a active railway, then complain when there's work done on said railway!"
Perhaps if a solicitor worth his salt acting on behalf of his clients in the standard matter of land searches had revealed the facts to the clients, then any normal purchaser would have not proceeded with the house purchase.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,991
Location
Surrey
It needs trialling in as much as getting UK TOCs used to dealing with them, and testing the infrastructure.
If you mean training and familiarisation of course. What i mean though is the need to spend years evaluating it like it was a prototype thats been done by plenty of railway administrations around the world already.
 

LPJOHN

Member
Joined
13 May 2019
Messages
80
I was out for a walk this afternoon and I noticed the bridge that spanned “County Road“ has been removed. The bridge was still in place yesterday morning.

The picture was taken from the original “County Road”.
 

Attachments

  • FBA97A71-3D58-4C56-8FFF-4575A92E5A97.jpeg
    FBA97A71-3D58-4C56-8FFF-4575A92E5A97.jpeg
    740.3 KB · Views: 82

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,137
When headbolt lane opens will then northern services terminate there instead of Kirkby?
 