• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Have Lumo cut the right services in response to engineering work?

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,404
Lumo's full weekday timetable has departures from Kings Cross at 0545, 1045, 1218, 1436 and 2018 and from Edinburgh at 0614, 0911, 1114, 1612 and 1958. The timetable needs four units to work, two stabled at each end.

In response to engineering work that prevents the 2018 from Kings Cross running north of Newcastle, Lumo has had to start the 0614 at Newcastle.

Is this the right change?

It is difficult to see other options. They presumably can't be offered a different earlier path from Kings Cross as that isn't in their access rights. However, they could have axed the 1958 from Edinburgh and 2018 from Kings Cross throughout to enable the 0614 to run throughout but it would leave them as a morning / afternoon operator.

Should Lumo even be allowed to run any services just between London and Newcastle on weekdays if the pretence is that the services are targeting the air flight market between London and Edinburgh?

Are engineering possessions and inability to run the full service (as seen on weekends for most of the last five months) going to be the downfall for their operation?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,834
Location
"Marston Vale mafia"
I think it won't be their downfall, as single fare pricing in operation on the ECML means you can easily use them one way and LNER the other.

They do however need to stop opening trains for sale they don't know they can run.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,747
Without knowing the details of their access rights, the engineering block presumably is large enough that a flex in their schedule doesn't solve it. I would be very surprised if their rights fix their paths to the degree they have no wriggle room.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,404
The other question is why they can't get the unit stabling overnight in Newcastle through to Edinburgh empty to form the second 0911 departure. Presumably this comes down to there being no path from Newcastle to Edinburgh or just no desire as it adds more costs to the operation than simply starting the 0614 short.

EDIT - it does look like this Q path exists from the timetable change in May
 
Last edited:
Status
Not open for further replies.

Top