According to the Hastings 'newspaper' the new Thameslink franchise could see trains between the Docklands and Hastings with a journey time of 60 mins:
http://www.hastingsobserver.co.uk/news/local/better-train-deal-on-the-horizon-1-6310466
http://www.hastingsobserver.co.uk/news/local/better-train-deal-on-the-horizon-1-6310466
The East Sussex Railway Alliance (ESRA) attended the launch of the Govia Thameslink GTR Rail Franchise on Monday September 15.
The new franchise could see trains from the Docklands to Hastings take just 60 minutes with another service from London Kings Cross and St Pancras to Hastings via Ashford taking just 68 minutes.
It covers the Thameslink and Southern services into Sussex and co-founder of ESRA, Ray Chapman hailed the event as the start of “one of the most exciting eras for rail ever.”
The event was attended by Rail Minister Claire Perry and senior management across the rail sector.
The Thameslink service covers the Ashford to Brighton route stopping at Hastings and St Leonards and part of the new plans are to introduce electrification, widening of the lines at key London stations and resignalling.....