• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR Xmas planned engineering work

Status
Not open for further replies.

Farang

Member
Joined
17 May 2018
Messages
144
GWR are very nonchalant about Xmas planned engineering work this year.

Details of the impact on our train services of planned engineering work at Christmas 2025 have yet to be finalised. This page will be updated once this has been agreed.

 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Stephen42

Member
Joined
6 Aug 2020
Messages
803
Location
London
That doesn’t excuse GWR from providing an overview /details on their site. In fact it makes it worse, as it means the information is available.
GWR aren't intending for people to look at that page. https://www.gwr.com/christmas redirects to their standard engineering work page this year and they don't have the page above in anything except the sitemap. Previous years used a dedicated page as the HS2 works were more disruptive, but this year is only fewer tracks and retiming/thinning of service.

The problem is that Google suggests the dedicated page that isn't planned to be updated rather than the short link or engineering work page. They'd probably update that page to link to the right place if someone reached out and pointed out politely that it's not clear the information is elsewhere on their site.
 

Farang

Member
Joined
17 May 2018
Messages
144
GWR aren't intending for people to look at that page. https://www.gwr.com/christmas redirects to their standard engineering work page this year and they don't have the page above in anything except the sitemap. Previous years used a dedicated page as the HS2 works were more disruptive, but this year is only fewer tracks and retiming/thinning of service.

The problem is that Google suggests the dedicated page that isn't planned to be updated rather than the short link or engineering work page. They'd probably update that page to link to the right place if someone reached out and pointed out politely that it's not clear the information is elsewhere on their site.
I have reached out to request this and wished them Merry Xmas.

== Doublepost prevention - post automatically merged: ==

They have given me a case reference but done nothing about it, par for the course.
 
Last edited:
Status
Not open for further replies.

Top